Bldg-Alter/Repair Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

Inspection Activity
Date: 03/01/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/01/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/01/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/01/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/15/2013
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Permit Finaled
Date: 03/08/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 04/01/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/15/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 02/25/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/25/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/25/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/13/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/13/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/14/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/14/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/14/2013
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Permit Finaled
Date: 03/05/2013
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Permit Finaled
Date: 03/09/2013
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Permit Finaled
Date: 03/19/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/19/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/19/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 01/24/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 01/24/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 01/24/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/10/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Permit Finaled
Date: 02/26/2013
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Permit Finaled
Date: 02/06/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/06/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/15/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/15/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/14/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/14/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/28/2013
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Permit Finaled
Date: 03/13/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 03/08/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/08/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/08/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/14/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/14/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/12/2013
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Permit Finaled
Date: 03/28/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/05/2013
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Permit Finaled
Date: 02/15/2013
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Permit Finaled
Date: 02/14/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/14/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/29/2013
Type: Final
Result: Partial Approval
Status: Permit Finaled
Date: 02/04/2013
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Permit Finaled
Date: 02/25/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 01/22/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 01/22/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/25/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/25/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/25/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 01/22/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 01/22/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 01/23/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/13/2013
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Permit Finaled
Date: 03/27/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/07/2013
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Permit Finaled
Date: 01/28/2013
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Permit Finaled
Date: 02/19/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/19/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/13/2013
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Permit Finaled
Date: 02/08/2013
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Permit Finaled
Date: 02/26/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 02/26/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 02/28/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Permit Finaled
Date: 02/14/2013
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Permit Finaled
Date: 02/25/2013
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Permit Finaled
Date: 01/21/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Permit Finaled
Date: 03/14/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 01/23/2013
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Permit Finaled
Date: 03/22/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/22/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/22/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/04/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/19/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 01/30/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/11/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Permit Finaled
Date: 02/28/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/28/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/28/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/20/2013
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Permit Finaled
Date: 03/18/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/18/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/18/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/05/2013
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Permit Finaled
Date: 02/05/2013
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Permit Finaled
Date: 01/18/2013
Type: Pre-Inspection
Result: Partial Approval
Status: Permit Finaled
Date: 03/15/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/15/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/15/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/19/2013
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Permit Finaled
Date: 03/14/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/14/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/14/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 01/29/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/01/2013
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Permit Finaled
Date: 03/05/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/05/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/05/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/20/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/20/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/20/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/19/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/11/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/11/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/13/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/13/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/13/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/05/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/05/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/05/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/21/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/21/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/21/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/20/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/20/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/20/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/11/2013
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Permit Finaled
Date: 02/12/2013
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Permit Finaled
Date: 02/27/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 02/27/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 01/22/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/28/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/28/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/28/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/28/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/08/2013
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Permit Finaled
Date: 02/25/2013
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Permit Finaled
Date: 03/12/2013
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Permit Finaled
Date: 03/01/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/01/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/19/2013
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Permit Finaled
Date: 02/19/2013
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Permit Finaled
Date: 02/22/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 02/22/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 03/22/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 03/20/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 01/25/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 01/25/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 01/25/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/04/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/04/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 01/19/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Off-Hour Fees Due
Status: Permit Finaled
Date: 03/06/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/06/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/06/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/26/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/05/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 03/18/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 02/23/2013
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Permit Finaled
Date: 02/21/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/02/2013
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Permit Finaled
Date: 03/22/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/22/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/22/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/22/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/28/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/27/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 01/24/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 01/24/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/13/2013
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Permit Finaled
Date: 02/18/2013
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Permit Finaled
Date: 02/20/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 02/20/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 03/14/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/14/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/14/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 04/19/2013
Type: Insulation
Result: Not Ready for Inspection
Status: Permit Finaled
Date: 02/26/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/26/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/26/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/26/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/15/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/15/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/15/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/15/2013
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/15/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/15/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/15/2013
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Permit Finaled
Date: 02/19/2013
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Permit Finaled
Date: 02/19/2013
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Permit Finaled
Date: 02/22/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/27/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/06/2013
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Permit Finaled
Date: 04/01/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/12/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/12/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/12/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/01/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/27/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/27/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/27/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/08/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/13/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/08/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/13/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/21/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/21/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/21/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 01/29/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/01/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/01/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/01/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/04/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/04/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/21/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/21/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/21/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/08/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/08/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/08/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/19/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/19/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/19/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/26/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/26/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/26/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/07/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 12/20/2013
Type: Final
Result: Partial Inspection
Status: Permit Finaled
Date: 03/20/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/20/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/20/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/13/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/13/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/13/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/28/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 02/28/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 03/13/2013
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Permit Finaled
Date: 02/08/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 01/26/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Permit Finaled
Date: 01/23/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 01/23/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 01/23/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 01/25/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 01/25/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 01/31/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/25/2013
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Permit Finaled
Date: 03/11/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/11/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/07/2014
Type: Final
Result: Permit Finaled
Status: Permit Finaled
Date: 02/21/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 02/21/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 03/13/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/13/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/13/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/15/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/15/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/15/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/27/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/27/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/27/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/27/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/07/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/08/2013
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Permit Finaled
Date: 01/31/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/07/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/07/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/07/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/07/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/07/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/07/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/06/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/01/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 03/01/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 01/30/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/14/2013
Type: Reinforced Concrete Frame
Result: Corrections Issued
Status: Permit Finaled
Date: 02/22/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/22/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/22/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 01/24/2013
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Permit Finaled
Date: 03/18/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/18/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 01/20/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Off-Hour Fees Due
Status: Permit Finaled
Date: 01/19/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Permit Finaled
Date: 01/19/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Permit Finaled
Date: 01/23/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 01/23/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 01/23/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/21/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/21/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/21/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/21/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/06/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 02/19/2013
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Permit Finaled
Date: 03/12/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/01/2013
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Permit Finaled
Date: 02/20/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/20/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/20/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/27/2013
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Permit Finaled
Date: 03/26/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 01/20/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Permit Finaled
Date: 02/12/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/12/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/19/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/22/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/22/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/22/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/26/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 01/24/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 01/24/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/04/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 03/28/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/20/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/15/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/15/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/15/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/12/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/12/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/12/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/12/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/13/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/13/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/22/2013
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Permit Finaled
Date: 03/04/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 03/04/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/07/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/07/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 02/12/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/12/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/12/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/20/2013
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Permit Finaled
Date: 03/06/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/06/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/06/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Permit Finaled
Date: 03/08/2013
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Permit Finaled
Date: 02/25/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 02/25/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 02/25/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 03/21/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Permit Finaled
Date: 01/25/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 01/25/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Permit Finaled
Date: 02/15/2013
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Permit Finaled
Date: 03/11/2013
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Permit Finaled
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
HUNT CONSTRUCTION GROUP INC

License number: 136502
Type: B
Phone: Speak with a Permit Expert
Location: SCOTTSDALE, AZ

Permit Applicant

Principal: ROBERT HUNT

Type:

Address: 22845 VENTURA BLVD., WOODLAND HILLS, CA

Phone:

Experience: years

Applicant: KIMBERLINA WHETTAM