Bldg-Alter/Repair Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

Inspection Activity
Date: 04/25/2013
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 12/12/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/19/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/24/2013
Type: Deputy Methane Barrier
Result: Approved
Status: Issued
Date: 05/02/2014
Type: Reinforced Masonry Frame
Result: Partial Inspection
Status: Issued
Date: 11/21/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/18/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/02/2014
Type: TCO Electrical Verification
Result: Completed (special insp)
Status: Issued
Date: 04/23/2014
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 05/08/2014
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 05/01/2014
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 06/04/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/10/2014
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 07/10/2014
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 03/26/2014
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 09/10/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 05/01/2014
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 06/05/2013
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 09/10/2013
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 10/28/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/19/2013
Type: METHANE-Rough
Result: Approved
Status: Issued
Date: 11/19/2013
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 09/23/2013
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 06/17/2013
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 06/06/2014
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/11/2013
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/12/2013
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 08/07/2013
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/10/2014
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/18/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 06/19/2013
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 04/28/2014
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 06/26/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/26/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/25/2014
Type: T-Bar Ceiling
Result: Partial Inspection
Status: Issued
Date: 12/17/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/18/2013
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 08/13/2013
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/09/2013
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/15/2013
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 09/24/2013
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 06/19/2013
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 04/28/2014
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 06/27/2013
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 07/22/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/19/2013
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/15/2014
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 12/04/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/08/2013
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/02/2014
Type: Green Building Final
Result: Insp Cancelled
Status: Issued
Date: 07/17/2013
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 05/01/2014
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 12/20/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/03/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 08/28/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/09/2013
Type: Interior/Exterior Lathing
Result: Not Ready for Inspection
Status: Issued
Date: 07/02/2013
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/29/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 05/31/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/04/2014
Type: T-Bar Ceiling
Result: Partial Inspection
Status: Issued
Date: 05/02/2014
Type: TCO Green Code Verification
Result: Completed (special insp)
Status: Issued
Date: 08/22/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Approved
Status: Issued
Date: 08/22/2013
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 08/12/2013
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/26/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/20/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/02/2014
Type: Final
Result: Partial Inspection
Status: Issued
Date: 06/11/2014
Type: Final
Result: Partial Inspection
Status: Issued
Date: 05/02/2014
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 08/01/2013
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/12/2013
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 05/02/2014
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Date: 06/19/2013
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 10/31/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/01/2014
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 12/27/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/14/2013
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/05/2014
Type: T-Bar Ceiling
Result: Partial Inspection
Status: Issued
Date: 03/26/2014
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 07/11/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/28/2014
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 11/04/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/16/2014
Type: Interior/Exterior Lathing
Result: Approved
Status: Issued
Date: 12/10/2013
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 06/14/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 05/12/2014
Type: TCO Green Code Verification
Result: Completed (special insp)
Status: Issued
Date: 06/13/2014
Type: Heat,Vent,A/C Verification
Result: Insp Scheduled
Status: Issued
Date: 05/28/2014
Type: Green Code Verification
Result: Pending
Status: Issued
Date: 05/09/2014
Type: Excavation/Setback/Form/Re-Bar
Result: Approved
Status: Issued
Date: 10/09/2013
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 12/02/2013
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/05/2013
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/02/2014
Type: TCO Sprinkler Verification
Result: Completed (special insp)
Status: Issued
Date: 10/21/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/28/2013
Type: Wood Frame
Result: Approved
Status: Issued
Date: 09/10/2013
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/28/2014
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 12/02/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 05/09/2014
Type: TCO Heat,Vent,A/C Verification
Result: Completed (special insp)
Status: Issued
Date: 08/05/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/02/2014
Type: TCO Heat,Vent,A/C Verification
Result: Completed (special insp)
Status: Issued
Date: 10/15/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/12/2014
Type: TCO Sprinkler Verification
Result: Completed (special insp)
Status: Issued
Date: 07/10/2014
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 01/08/2014
Type: Interior/Exterior Lathing
Result: Partial Inspection
Status: Issued
Date: 05/27/2014
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 07/11/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/06/2014
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 12/06/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/20/2014
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/09/2013
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/26/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/22/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/10/2014
Type: CofO Issuance
Result: CofO in Progress
Status: CofO Issued
Date: 12/11/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/31/2013
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/28/2014
Type: Green Building Final
Result: Insp Cancelled
Status: Issued
Date: 05/03/2014
Type: Final
Result: Insp Cancelled
Status: Issued
Date: 12/17/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/17/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/30/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/13/2014
Type: Electrical Verification
Result: Insp Scheduled
Status: Issued
Date: 08/27/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/07/2014
Type: Interior/Exterior Lathing
Result: Partial Inspection
Status: Issued
Date: 04/28/2014
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 07/22/2013
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/20/2013
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 08/14/2013
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/19/2013
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 07/24/2013
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/11/2014
Type: Green Building Final
Result: Approved
Status: Issued
Date: 05/03/2014
Type: Reinforced Masonry Frame
Result: Insp Cancelled
Status: Issued
Date: 05/03/2014
Type: SGSOV-Seismic Gas S/O Valve
Result: Insp Cancelled
Status: Issued
Date: 11/13/2013
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 08/26/2013
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/13/2013
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 06/10/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/23/2013
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/12/2014
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 04/28/2014
Type: Final
Result: Partial Inspection
Status: Issued
Date: 01/30/2014
Type: T-Bar Ceiling
Result: Partial Inspection
Status: Issued
Date: 05/05/2014
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 06/23/2014
Type: Final
Result: Partial Inspection
Status: Issued
Date: 05/01/2014
Type: Final
Result: Partial Inspection
Status: Issued
Date: 06/25/2013
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/06/2013
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/14/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Approved
Status: Issued
Date: 12/10/2013
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/23/2013
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/12/2013
Type: Masonry Wall/Backfill
Result: Not Ready for Inspection
Status: Issued
Date: 06/17/2013
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 07/16/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/21/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/03/2013
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/21/2014
Type: T-Bar Ceiling
Result: Partial Inspection
Status: Issued
Date: 04/15/2014
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 08/15/2013
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/09/2014
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 04/25/2014
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 12/11/2013
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/11/2014
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 05/01/2014
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 06/06/2013
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/01/2013
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/31/2013
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/02/2014
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV No Gas
Status: Issued
Date: 10/28/2013
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/09/2014
Type: Final
Result: OK to Issue CofO
Status: CofO Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
KPRS CONSTRUCTION SERVICES INC

License number: 751130
Type: B
Phone: Speak with a Permit Expert
Location: BREA, CA

Permit Applicant

Principal: PAUL BUSE

Type:

Address: 10 EDELMAN, IRVINE, CA

Phone:

Experience: years

Applicant: MIKE SNYDER