Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

New single-family dwelling with attached garage.

Inspection Activity
Date: 02/22/2016
Type: Footing/Foundation/Slab
Result: Corrections Issued
Status: Issued
Date: 03/04/2015
Type: Public Counter
Result: Completed
Status: Issued
Date: 12/11/2015
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 08/31/2015
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 12/11/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 02/25/2016
Type: Piling/Pier/Caisson
Result: Conditional Approval
Status: Issued
Date: 04/20/2017
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 06/06/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/06/2017
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 06/16/2017
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 06/28/2017
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 10/10/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/19/2017
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 10/19/2017
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/20/2018
Type: Sewer
Result: Insp Scheduled
Status: Issued
Date: 04/20/2018
Type: PLUMBING-Rough
Result: Insp Scheduled
Status: Issued
Date: 11/16/2017
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 03/27/2020
Type: ELECTRICAL-Rough
Result: No Access for Inspection
Status: Issued
Date: 05/02/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/27/2017
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 12/04/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/14/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 05/15/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Conditional Approval
Status: Issued
Date: 05/14/2018
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 12/11/2017
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 12/22/2017
Type: Footing/Foundation/Slab
Result: Corrections Issued
Status: Issued
Date: 12/28/2017
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/29/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/01/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/25/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 01/23/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 01/29/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/13/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 02/16/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 07/10/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 07/13/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 07/13/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 07/11/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 08/21/2020
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 03/31/2020
Type: HVAC-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 07/18/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/10/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/10/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/11/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/08/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 07/12/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/08/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/16/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Corrections Issued
Status: Issued
Date: 07/16/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 07/15/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/16/2019
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 07/17/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/17/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 08/10/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/10/2018
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 08/20/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/31/2020
Type: ELECTRICAL-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 04/01/2020
Type: HVAC-Rough
Result: Insp Cancelled
Status: Issued
Date: 09/10/2018
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 09/10/2018
Type: Sewer
Result: Not Ready for Inspection
Status: Issued
Date: 09/20/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 09/19/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/05/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/05/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 10/05/2018
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 10/03/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/17/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/19/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/17/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 11/07/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/09/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 08/28/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 08/29/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 08/30/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/16/2018
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 08/28/2019
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 08/28/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Approved
Status: Issued
Date: 08/24/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 08/24/2020
Type: PLUMBING-Rough
Result: Approved
Status: Issued
Date: 08/24/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 12/05/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Corrections Issued
Status: Issued
Date: 12/05/2019
Type: ELECTRICAL-Rough
Result: Partial Inspection
Status: Issued
Date: 12/02/2019
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 12/05/2019
Type: PLUMBING-Rough
Result: Partial Inspection
Status: Issued
Date: 02/28/2019
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 03/13/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Corrections Issued
Status: Issued
Date: 03/18/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 03/19/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Cancelled
Status: Issued
Date: 03/26/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 10/08/2019
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 04/03/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 04/03/2019
Type: Underground Mechanical
Result: Not Ready for Inspection
Status: Issued
Date: 04/03/2019
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 04/01/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/03/2019
Type: Rough-Elec/Plmb/HVAC
Result: Partial Approval
Status: Issued
Date: 04/01/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/07/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Corrections Issued
Status: Issued
Date: 10/09/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 04/24/2019
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/24/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/30/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 05/07/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Corrections Issued
Status: Issued
Date: 05/07/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 09/02/2020
Type: Shower Pan
Result: Partial Approval
Status: Issued
Date: 09/02/2020
Type: Underground Mechanical
Result: Not Ready for Inspection
Status: Issued
Date: 01/07/2020
Type: HVAC-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/07/2020
Type: PLUMBING-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/07/2020
Type: Structural Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 01/07/2020
Type: ELECTRICAL-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/07/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 01/09/2020
Type: Structural Steel Frame
Result: Corrections Issued
Status: Issued
Date: 01/09/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 05/07/2020
Type: ELECTRICAL-Rough
Result: Approved
Status: Issued
Date: 04/20/2021
Type: ELECTRICAL-Rough
Result: Approved
Status: Issued
Date: 01/15/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 01/15/2020
Type: Structural Steel Frame
Result: Approved
Status: Issued
Date: 04/19/2021
Type: HVAC-Final
Result: Approved
Status: Issued
Date: 04/20/2021
Type: Service/Power Release
Result: Approved
Status: Issued
Date: 01/21/2020
Type: Pre-Inspection
Result: Insp Cancelled
Status: Issued
Date: 09/08/2020
Type: Underground Mechanical
Result: Corrections Issued
Status: Issued
Date: 09/10/2020
Type: Underground Mechanical
Result: Partial Approval
Status: Issued
Date: 05/21/2020
Type: HVAC-Rough
Result: Approved
Status: Issued
Date: 01/05/2021
Type: Interior/Exterior Lathing
Result: Approved
Status: Issued
Date: 01/05/2021
Type: Shower Pan
Result: Approved
Status: Issued
Date: 02/10/2020
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 04/19/2021
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 04/19/2021
Type: ELECTRICAL-Rough
Result: Corrections Issued
Status: Issued
Date: 03/18/2020
Type: ELECTRICAL-Rough
Result: Corrections Issued
Status: Issued
Date: 09/21/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 09/21/2020
Type: Shower Pan
Result: Partial Approval
Status: Issued
Date: 09/21/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/25/2020
Type: PLUMBING-Rough
Result: Corrections Issued
Status: Issued
Date: 09/21/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/07/2020
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 07/07/2020
Type: BUILDING-Rough-Frame
Result: Partial Approval
Status: Issued
Date: 07/07/2020
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 07/11/2020
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 09/21/2020
Type: Shower Pan
Result: Partial Approval
Status: Issued
Date: 09/21/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/18/2020
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 09/29/2020
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 09/29/2020
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 09/29/2020
Type: BUILDING-Rough-Frame
Result: Partial Approval
Status: Issued
Date: 10/09/2020
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 10/09/2020
Type: BUILDING-Rough-Frame
Result: Approved
Status: Issued
Date: 10/09/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 10/09/2020
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 10/23/2020
Type: Insulation
Result: Corrections Issued
Status: Issued
Date: 10/23/2020
Type: Shower Pan
Result: Partial Approval
Status: Issued
Date: 10/19/2020
Type: BUILDING-Rough-Frame
Result: Approved
Status: Issued
Date: 10/19/2020
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 10/19/2020
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 10/19/2020
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 10/26/2020
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 10/28/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/29/2020
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 10/26/2020
Type: Shower Pan
Result: Partial Approval
Status: Issued
Date: 10/26/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 11/09/2020
Type: Insulation
Result: Approved
Status: Issued
Date: 11/16/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 12/02/2020
Type: Shower Pan
Result: Partial Approval
Status: Issued
Date: 12/11/2020
Type: Interior/Exterior Lathing
Result: Approved
Status: Issued
Date: 03/10/2021
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 03/08/2021
Type: ELECTRICAL-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/12/2021
Type: ELECTRICAL-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/16/2021
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 04/05/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/15/2021
Type: ELECTRICAL-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 06/09/2021
Type: Pool/Spa Cover
Result: Not Ready for Inspection
Status: Issued
Date: 06/15/2021
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 07/08/2021
Type: Service/Power Release
Result: Not Ready for Inspection
Status: Issued
Date: 03/07/2022
Type: HVAC-Final
Result: Approved
Status: Issued
Date: 07/26/2021
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 03/07/2022
Type: ELECTRICAL-Final
Result: Approved
Status: Issued
Date: 03/31/2022
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: Issued
Date: 03/31/2022
Type: Green Building Final
Result: Corrections Issued
Status: Issued
Date: 03/31/2022
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 03/31/2022
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 03/31/2022
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 02/15/2022
Type: PLUMBING-Final
Result: Corrections Issued
Status: Issued
Date: 02/24/2022
Type: ELECTRICAL-Final
Result: Corrections Issued
Status: Issued
Date: 02/22/2022
Type: HVAC-Final
Result: Corrections Issued
Status: Issued
Date: 02/24/2022
Type: PLUMBING-Final
Result: Approved
Status: Issued
Date: 05/05/2022
Type: Final
Result: Corrections Issued
Status: Issued
Date: 05/06/2022
Type: Grading Verification
Result: OK for CofO
Status: Issued
Date: 05/05/2022
Type: Green Building Final
Result: Approved
Status: Issued
Date: 05/13/2022
Type: CofO Issuance
Result: CofO in Progress
Status: CofO in Progress
Date: 05/13/2022
Type: CofO Issuance
Result: CofO in Progress
Status: CofO in Progress
Date: 05/10/2022
Type: Final
Result: OK to Issue CofO
Status: CofO in Progress
Date: 05/13/2022
Type: Inspection
Result: OK for CofO
Status: CofO in Progress
Date: 05/21/2022
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 05/21/2022
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 05/21/2022
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
GIBSON CONSTRUCTION

License number: 524012
Type: B
Phone: Speak with a Permit Expert
Location: SANTA MONICA, CA

Permit Applicant

Principal: GORDON SANFORD GIBSON

Type:

Address: 8609 WASHINGTON BLVD., CULVER CITY, CA

Phone:

Experience: years

Applicant: AARON BENTLEY