Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

Fully sprinklered 78'-5" x 317'-10" irreg. shaped 4 story, 42 unit Typ

Inspection Activity
Date: 07/20/2016
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 07/21/2016
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 07/20/2016
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 07/22/2016
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 07/26/2016
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 07/25/2016
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 07/27/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/26/2016
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 07/27/2016
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 07/25/2016
Type: Masonry Wall/Backfill
Result: Not Ready for Inspection
Status: Issued
Date: 06/01/2016
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 06/01/2016
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 06/07/2016
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/10/2016
Type: Grading Pre-Inspection
Result: Insp Cancelled
Status: Issued
Date: 06/08/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 06/09/2016
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 06/10/2016
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 06/07/2016
Type: Pre-Inspection
Result: No Access for Inspection
Status: Issued
Date: 06/06/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/07/2016
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/14/2016
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 06/17/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/14/2016
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 06/17/2016
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 06/14/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/17/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 06/17/2016
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 06/28/2016
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 06/29/2016
Type: Deputy Shotcrete
Result: Insp Cancelled
Status: Issued
Date: 06/28/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/24/2016
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 06/29/2016
Type: Deputy Reinf. Masonry
Result: Insp Cancelled
Status: Issued
Date: 06/28/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 06/27/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/29/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/27/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 06/28/2016
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 06/24/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 06/27/2016
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 06/24/2016
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 06/23/2016
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 06/23/2016
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/29/2016
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/28/2016
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 06/29/2016
Type: Deputy Shotcrete
Result: Insp Cancelled
Status: Issued
Date: 06/28/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/30/2016
Type: Deputy Reinf. Masonry
Result: Insp Cancelled
Status: Issued
Date: 06/29/2016
Type: Deputy Reinf. Masonry
Result: Insp Cancelled
Status: Issued
Date: 06/28/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 06/27/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/27/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 06/28/2016
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 06/27/2016
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 06/29/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/01/2016
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 07/01/2016
Type: Deputy Shotcrete
Result: Insp Cancelled
Status: Issued
Date: 06/30/2016
Type: Deputy Shotcrete
Result: Insp Cancelled
Status: Issued
Date: 06/29/2016
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/30/2016
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/01/2016
Type: Deputy Reinf. Masonry
Result: Insp Cancelled
Status: Issued
Date: 07/08/2016
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 07/06/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 07/07/2016
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 07/13/2016
Type: Deputy Reinf. Masonry
Result: Insp Cancelled
Status: Issued
Date: 07/15/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/13/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 07/14/2016
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 11/22/2016
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 11/22/2016
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 11/22/2016
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Cancelled
Status: Issued
Date: 11/22/2016
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 11/22/2016
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 11/28/2016
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 11/28/2016
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Corrections Issued
Status: Issued
Date: 11/29/2016
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 11/29/2016
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 11/28/2016
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 11/28/2016
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 01/05/2017
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 05/05/2017
Type: Pre-Inspection
Result: Insp Cancelled
Status: Issued
Date: 05/05/2017
Type: Insulation
Result: Insp Cancelled
Status: Issued
Date: 05/25/2017
Type: Wood Frame
Result: Corrections Issued
Status: Issued
Date: 05/22/2017
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 06/08/2017
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 06/06/2017
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 06/08/2017
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 06/06/2017
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 06/06/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 06/06/2017
Type: Wood Frame
Result: Insp Cancelled
Status: Issued
Date: 06/15/2017
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 06/14/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Corrections Issued
Status: Issued
Date: 06/16/2017
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 06/12/2017
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/13/2017
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 06/30/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 06/29/2017
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 06/27/2017
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 06/30/2017
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 06/27/2017
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 06/30/2017
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 06/29/2017
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 06/30/2017
Type: Wood Frame
Result: Insp Cancelled
Status: Issued
Date: 10/26/2017
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 10/04/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/04/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 10/16/2017
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 10/23/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/26/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 10/23/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 04/18/2018
Type: Pre-Inspection
Result: Insp Cancelled
Status: Issued
Date: 11/06/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/06/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 04/17/2018
Type: Pre-Inspection
Result: Insp Cancelled
Status: Issued
Date: 05/02/2018
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 03/23/2020
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 06/13/2018
Type: Final
Result: Insp Cancelled
Status: Issued
Date: 06/21/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 03/20/2018
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 04/03/2020
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 07/19/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 08/14/2018
Type: Pre-Inspection
Result: Corrections Issued
Status: Issued
Date: 09/27/2018
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 11/22/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 09/05/2019
Type: Pre-Inspection
Result: Insp Cancelled
Status: Issued
Date: 11/26/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/25/2019
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 01/30/2019
Type: Special/Order Compliance
Result: Order to Comply Issued
Status: Issued
Date: 08/25/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 08/27/2020
Type: Excavation/Setback/Form/Re-Bar
Result: No Access for Inspection
Status: Issued
Date: 03/13/2019
Type: Special/Order Compliance
Result: Order to Comply Issued
Status: Issued
Date: 09/03/2020
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 09/01/2020
Type: Grading Pre-Inspection
Result: Corrections Issued
Status: Issued
Date: 09/08/2020
Type: Grading Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 02/05/2020
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 03/16/2020
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 08/07/2020
Type: Grading Pre-Inspection
Result: Insp Cancelled
Status: Issued
Date: 08/06/2020
Type: Footing/Foundation/Slab
Result: Corrections Issued
Status: Issued
Date: 08/13/2020
Type: Grading Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 11/24/2021
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 12/01/2021
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 09/10/2021
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 12/09/2021
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 12/06/2021
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 12/10/2021
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 09/15/2021
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 12/17/2021
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 12/16/2021
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 09/29/2021
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 10/29/2021
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 10/27/2021
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 11/19/2021
Type: Special/Order Compliance
Result: Corrections Issued
Status: Issued
Date: 02/22/2022
Type: Grading Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 05/06/2022
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 04/11/2023
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 02/02/2023
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 02/02/2023
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 02/06/2023
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 02/13/2023
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 02/13/2023
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 03/29/2023
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 03/30/2023
Type: Grading Verification
Result: Not Applicable
Status: Issued
Date: 03/31/2023
Type: Electrical Verification
Result: Insp Scheduled
Status: Issued
Date: 03/29/2023
Type: Fire Sprinkler Verification
Result: OK for CofO
Status: Issued
Date: 03/30/2023
Type: Heat,Vent,A/C Verification
Result: OK for CofO
Status: Issued
Date: 03/30/2023
Type: Plumbing Verification
Result: CofO on Hold
Status: Issued
Date: 03/30/2023
Type: Elevator Verification
Result: CofO on Hold
Status: Issued
Date: 04/28/2023
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 05/05/2023
Type: Plumbing Verification
Result: Insp Scheduled
Status: Issued
Date: 05/04/2023
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 05/05/2023
Type: Grading Verification
Result: CofO on Hold
Status: Issued
Date: 06/16/2023
Type: Special/Order Compliance
Result: Insp Cancelled
Status: Issued
Date: 06/30/2023
Type: Special/Order Compliance
Result: Insp Cancelled
Status: Issued
Date: 06/30/2023
Type: Grading Verification
Result: Insp Scheduled
Status: Issued
Date: 06/27/2023
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 06/29/2023
Type: Final
Result: Partial Inspection
Status: Issued
Date: 06/29/2023
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 07/03/2023
Type: Elevator Verification
Result: OK for CofO
Status: Issued
Date: 07/19/2023
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 08/04/2023
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 08/08/2023
Type: Grading Verification
Result: CofO on Hold
Status: Issued
Date: 08/28/2023
Type: Grading Verification
Result: OK for CofO
Status: CofO in Progress
Date: 09/01/2023
Type: Green Building Rough
Result: Approved
Status: CofO in Progress
Date: 09/01/2023
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: CofO in Progress
Date: 09/01/2023
Type: Footing/Foundation/Slab
Result: Approved
Status: CofO in Progress
Date: 09/01/2023
Type: Structural Steel Frame
Result: Approved
Status: CofO in Progress
Date: 09/01/2023
Type: Verify Sprinkler Sign Off
Result: Approved
Status: CofO in Progress
Date: 09/01/2023
Type: Final
Result: OK to Issue CofO
Status: CofO in Progress
Date: 09/01/2023
Type: Wood Frame
Result: Approved
Status: CofO in Progress
Date: 09/01/2023
Type: CofO Issuance
Result: CofO in Progress
Status: CofO in Progress
Date: 09/01/2023
Type: Reinforced Masonry Frame
Result: Approved
Status: CofO in Progress
Date: 09/01/2023
Type: Reinforced Concrete Frame
Result: Approved
Status: CofO in Progress
Date: 09/01/2023
Type: Drywall Nailing
Result: Approved
Status: CofO in Progress
Date: 09/01/2023
Type: Smoke Detectors
Result: Approved
Status: CofO in Progress
Date: 09/06/2023
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 09/06/2023
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 09/06/2023
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
HASSID YORAM

License number: 413779
Type: B
Phone: Speak with a Permit Expert
Location: PACIFIC PALISADES, CA

Permit Applicant

Principal: YORAM HASSID

Type:

Address: 636 N HARPER AV, L.A., CA

Phone:

Experience: years

Applicant: EDUARDO DE LA TORRE