Bldg-Alter/Repair Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

TERMINAL 2 RENOVATION PROGRAM INCLUDES RENOVATION OF BAGGAGE CLAIM LOB

Inspection Activity
Date: 07/21/2016
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 08/04/2016
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 08/10/2016
Type: T-Bar Ceiling
Result: Not Ready for Inspection
Status: Issued
Date: 02/17/2017
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 02/17/2017
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 02/17/2017
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 02/17/2017
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 07/01/2015
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 01/14/2016
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 07/13/2015
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 03/20/2015
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 11/20/2015
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 03/11/2015
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 01/21/2015
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 06/22/2015
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/14/2015
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/16/2015
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/22/2016
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/22/2015
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/22/2015
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/06/2015
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 05/27/2015
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 07/08/2015
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/14/2015
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/31/2016
Type: Reinforced Concrete Frame
Result: Approved
Status: Issued
Date: 04/22/2015
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/22/2015
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/29/2015
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 03/03/2015
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 01/09/2015
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 01/22/2016
Type: T-Bar Ceiling
Result: Insp Scheduled
Status: Issued
Date: 03/18/2015
Type: Reinforced Concrete Frame
Result: Conditional Approval
Status: Issued
Date: 12/19/2014
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 02/09/2015
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 03/25/2016
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 01/07/2015
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/01/2016
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/01/2016
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 12/30/2014
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 06/17/2015
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 01/27/2016
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/16/2015
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/28/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/08/2016
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 10/16/2015
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 03/16/2015
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/04/2015
Type: Public Counter
Result: Completed
Status: Issued
Date: 03/19/2015
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 10/23/2015
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 03/30/2016
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 06/16/2015
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/19/2014
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 03/23/2015
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 08/06/2015
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 08/06/2015
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 06/04/2015
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/19/2015
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 01/07/2016
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/21/2015
Type: Final
Result: Partial Approval
Status: Issued
Date: 09/10/2015
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 07/16/2015
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 05/13/2015
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 06/17/2015
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 05/27/2015
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 03/24/2015
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/14/2015
Type: T-Bar Ceiling
Result: Corrections Issued
Status: Issued
Date: 11/10/2015
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 08/07/2015
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 08/07/2015
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 03/13/2015
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 03/06/2015
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 06/19/2015
Type: T-Bar Ceiling
Result: Insp Scheduled
Status: Issued
Date: 05/08/2015
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 03/25/2015
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 04/24/2015
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 04/24/2015
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 06/22/2015
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 04/21/2015
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/21/2015
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/03/2016
Type: Interior/Exterior Lathing
Result: Not Ready for Inspection
Status: Issued
Date: 12/29/2014
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 10/15/2015
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 07/07/2015
Type: Final
Result: Partial Inspection
Status: Issued
Date: 02/03/2015
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 01/21/2016
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 06/05/2015
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 01/09/2015
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 01/09/2015
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 02/26/2016
Type: T-Bar Ceiling
Result: Insp Scheduled
Status: Issued
Date: 12/03/2015
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/10/2015
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 03/24/2015
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/21/2016
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/25/2016
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/08/2015
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/21/2015
Type: Green Building Final
Result: Partial Inspection
Status: Issued
Date: 03/13/2015
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 12/17/2014
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 10/23/2015
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 08/07/2015
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 08/07/2015
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 07/10/2015
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 12/15/2014
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/31/2015
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/21/2016
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 10/21/2015
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 03/03/2016
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/27/2015
Type: Green Building Final
Result: Insp Cancelled
Status: Issued
Date: 06/22/2015
Type: Green Building Final
Result: Insp Cancelled
Status: Issued
Date: 03/21/2016
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/06/2015
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 10/02/2015
Type: Structural Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 12/30/2015
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 11/20/2015
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 10/14/2015
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 01/22/2015
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 08/14/2015
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 04/22/2015
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 04/22/2015
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 02/12/2016
Type: T-Bar Ceiling
Result: Insp Scheduled
Status: Issued
Date: 12/29/2014
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 04/17/2015
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 12/01/2015
Type: Final
Result: Partial Inspection
Status: Issued
Date: 12/01/2015
Type: Green Building Final
Result: Partial Approval
Status: Issued
Date: 05/27/2015
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 01/21/2016
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 01/06/2015
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 02/16/2016
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 03/24/2015
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 03/03/2015
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 02/02/2015
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 09/10/2015
Type: Final
Result: Partial Approval
Status: Issued
Date: 10/21/2015
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 07/15/2015
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 12/17/2014
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 04/14/2015
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 06/18/2015
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 06/19/2015
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 03/19/2015
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 04/21/2015
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/21/2015
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/16/2015
Type: T-Bar Ceiling
Result: Insp Scheduled
Status: Issued
Date: 01/08/2016
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 02/16/2016
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/07/2015
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 07/07/2015
Type: Green Building Final
Result: Partial Approval
Status: Issued
Date: 03/20/2015
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 01/08/2015
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 06/18/2015
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 04/07/2015
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 10/14/2015
Type: Piling/Pier/Caisson
Result: Partial Inspection
Status: Issued
Date: 04/06/2016
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 04/04/2016
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 04/06/2016
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 04/06/2016
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 04/13/2016
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/21/2016
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/20/2016
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 04/22/2016
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 05/02/2016
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 05/04/2016
Type: Green Building Final
Result: Insp Cancelled
Status: Issued
Date: 05/03/2016
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 05/04/2016
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 05/13/2016
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 05/11/2016
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 05/13/2016
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 05/10/2016
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 05/11/2016
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 05/17/2016
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/18/2016
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 05/18/2016
Type: Reinforced Concrete Frame
Result: Conditional Approval
Status: Issued
Date: 05/19/2016
Type: Light Gage Steel Frame
Result: Conditional Approval
Status: Issued
Date: 06/07/2016
Type: Footing/Foundation/Slab
Result: Conditional Approval
Status: Issued
Date: 06/09/2016
Type: Footing/Foundation/Slab
Result: Conditional Approval
Status: Issued
Date: 06/28/2016
Type: T-Bar Ceiling
Result: Approved
Status: Issued
Date: 06/29/2016
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 06/28/2016
Type: T-Bar Ceiling
Result: Approved
Status: Issued
Date: 06/29/2016
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 07/08/2016
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 07/13/2016
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 11/09/2016
Type: T-Bar Ceiling
Result: Insp Scheduled
Status: Issued
Date: 11/18/2016
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 11/22/2016
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 11/29/2016
Type: T-Bar Ceiling
Result: Insp Scheduled
Status: Issued
Date: 12/09/2016
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 12/06/2016
Type: T-Bar Ceiling
Result: Insp Scheduled
Status: Issued
Date: 12/09/2016
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 12/09/2016
Type: Green Building Final
Result: Insp Cancelled
Status: Issued
Date: 12/19/2016
Type: Drywall Nailing
Result: Conditional Approval
Status: Issued
Date: 06/28/2017
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/14/2025
Type:
Result:
Status:
Date: 03/14/2025
Type:
Result:
Status:
Date: 03/14/2025
Type:
Result:
Status:
Date: 03/14/2025
Type:
Result:
Status:
Date: 03/14/2025
Type:
Result:
Status:
Date: 03/14/2025
Type:
Result:
Status:
Date: 11/06/2014
Type:
Result:
Status:
Date: 12/01/2014
Type:
Result:
Status:
Date: 10/09/2014
Type:
Result:
Status:
Date: 11/25/2014
Type:
Result:
Status:
Date: 11/14/2014
Type:
Result:
Status:
Date: 10/09/2014
Type:
Result:
Status:
Date: 11/24/2014
Type:
Result:
Status:
Date: 12/09/2014
Type:
Result:
Status:
Date: 05/13/2024
Type: Final
Result: Permit Finaled
Status: Permit Finaled
Date: 05/13/2024
Type: Green Building Final
Result: Approved
Status: Permit Finaled
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
TURNER CONSTRUCTION COMPANY

License number: 210639
Type: B
Phone: Speak with a Permit Expert
Location: ANAHEIM, CA

Permit Applicant

Principal: RICHARD CHARLES BACH

Type:

Address: 4465 WILSHIRE BLVD., STE. 100, LOS ANGELES, CA

Phone:

Experience: years

Applicant: DOUGLAS GRUNINGER