Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

PDPP-New Mixed Use SENIOR AFFORDABLE HOUSING APARTMENT/RETAILS BUILDI

Inspection Activity
Date: 07/20/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/20/2016
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 07/21/2016
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/22/2016
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 07/20/2016
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/29/2016
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 07/29/2016
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 07/26/2016
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/26/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 08/05/2016
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 08/10/2016
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 08/10/2016
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 08/08/2016
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 08/08/2016
Type: Interior/Exterior Lathing
Result: Approved
Status: Issued
Date: 02/14/2017
Type: SUSMP-Std. Urban Storm Water
Result: Partial Inspection
Status: Issued
Date: 02/14/2017
Type: SUSMP-Std. Urban Storm Water
Result: Partial Inspection
Status: Issued
Date: 02/14/2017
Type: SUSMP-Std. Urban Storm Water
Result: Partial Inspection
Status: Issued
Date: 02/14/2017
Type: SUSMP-Std. Urban Storm Water
Result: Partial Inspection
Status: Issued
Date: 02/14/2017
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 02/14/2017
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 02/14/2017
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 02/14/2017
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 02/15/2017
Type: Green Building Final
Result: Insp Cancelled
Status: Issued
Date: 02/15/2017
Type: Green Building Final
Result: Insp Cancelled
Status: Issued
Date: 02/15/2017
Type: Green Building Final
Result: Insp Cancelled
Status: Issued
Date: 02/15/2017
Type: Green Building Final
Result: Insp Cancelled
Status: Issued
Date: 02/14/2017
Type: Final
Result: Corrections Issued
Status: Issued
Date: 02/14/2017
Type: Final
Result: Corrections Issued
Status: Issued
Date: 02/14/2017
Type: Final
Result: Corrections Issued
Status: Issued
Date: 02/14/2017
Type: Final
Result: Corrections Issued
Status: Issued
Date: 02/14/2017
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 02/14/2017
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 02/14/2017
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 02/14/2017
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 02/14/2017
Type: Reinforced Concrete Frame
Result: Approved
Status: Issued
Date: 02/14/2017
Type: Reinforced Concrete Frame
Result: Approved
Status: Issued
Date: 02/14/2017
Type: Reinforced Concrete Frame
Result: Approved
Status: Issued
Date: 02/14/2017
Type: Reinforced Concrete Frame
Result: Approved
Status: Issued
Date: 02/14/2017
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 02/14/2017
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 02/14/2017
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 02/14/2017
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 06/04/2015
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 10/02/2015
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 08/18/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/10/2015
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 10/14/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 10/19/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 12/08/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 07/09/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/09/2015
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 08/17/2015
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 06/09/2015
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 06/26/2015
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 06/17/2015
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 08/17/2015
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 10/01/2015
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 12/03/2015
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 07/23/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/22/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 08/21/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/21/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/29/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 11/16/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 07/08/2015
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 07/21/2015
Type: Masonry Wall/Backfill
Result: Insp Cancelled
Status: Issued
Date: 06/18/2015
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/20/2016
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 09/21/2015
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 10/13/2015
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 10/13/2015
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 10/29/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/04/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 11/20/2015
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 06/11/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 09/22/2015
Type: Structural Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 06/15/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 10/09/2015
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 10/16/2015
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 05/15/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/26/2015
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 10/09/2015
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 06/25/2015
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 07/28/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/17/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 12/02/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 06/01/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/08/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 12/01/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 03/17/2016
Type: SUSMP-Std. Urban Storm Water
Result: Partial Inspection
Status: Issued
Date: 12/04/2015
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 10/07/2015
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 11/02/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 07/23/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 08/04/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/04/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/20/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/09/2015
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 10/15/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 10/30/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/19/2015
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 06/04/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/15/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 01/15/2016
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 08/11/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/08/2015
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 06/04/2015
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 06/22/2015
Type: Masonry Wall/Backfill
Result: Not Ready for Inspection
Status: Issued
Date: 03/07/2016
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 10/16/2015
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 08/20/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/20/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/19/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 12/24/2015
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 05/29/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/16/2015
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/17/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 10/13/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/17/2015
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 06/19/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/18/2014
Type: Grading Pre-Inspection
Result: Approved
Status: Issued
Date: 06/18/2015
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 05/19/2015
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 10/22/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 09/21/2015
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 02/11/2016
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 05/08/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/05/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/08/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/01/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/03/2016
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 12/17/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 10/07/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 06/19/2015
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 07/20/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 01/11/2016
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 10/02/2015
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 02/01/2016
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 07/21/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 10/09/2015
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 06/23/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 06/26/2015
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/23/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/12/2015
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 08/12/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 10/15/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 08/12/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/07/2015
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 07/07/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/10/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/19/2015
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 05/19/2015
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 08/06/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/06/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/11/2015
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 11/17/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 08/11/2015
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 07/24/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/19/2016
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 05/12/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/27/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 05/14/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/15/2015
Type: Deputy Reinf. Masonry
Result: Order to Comply Issued
Status: Issued
Date: 08/05/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/05/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/27/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 08/20/2015
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 01/15/2016
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 08/11/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 06/09/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/10/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/09/2015
Type: Reinforced Masonry Frame
Result: Partial Inspection
Status: Issued
Date: 03/10/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/19/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/03/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 01/05/2016
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 11/12/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/08/2015
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 01/15/2016
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 07/17/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/03/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/23/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 10/29/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 12/11/2015
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 03/03/2016
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 10/16/2015
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 02/02/2016
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 06/25/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/23/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 10/19/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/13/2015
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 10/28/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 11/18/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 06/29/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 12/29/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 07/30/2015
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/22/2016
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 06/24/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 10/30/2015
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 02/19/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/10/2015
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 09/21/2015
Type: Wood Frame
Result: Corrections Issued
Status: Issued
Date: 09/09/2015
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 02/05/2016
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 02/04/2016
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 03/11/2016
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 10/01/2015
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/12/2016
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 07/23/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 09/29/2015
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 10/09/2015
Type: Structural Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 07/14/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/12/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/10/2015
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 07/29/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 09/30/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 04/23/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/23/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/30/2015
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/20/2015
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 02/17/2016
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 03/10/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 07/29/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/03/2016
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 05/28/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/05/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/05/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 08/10/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 10/14/2015
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 07/20/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/20/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 05/27/2015
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 10/14/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/22/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/26/2015
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 09/18/2015
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 10/06/2015
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 07/31/2015
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/20/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 12/17/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 03/03/2016
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 05/19/2015
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 06/18/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 08/14/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/27/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/09/2015
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 06/22/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 01/04/2016
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 07/24/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/17/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/15/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/09/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 10/06/2015
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 10/06/2015
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 10/06/2015
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 05/18/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 06/26/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/21/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/20/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/16/2015
Type: Piling/Pier/Caisson
Result: Not Ready for Inspection
Status: Issued
Date: 03/11/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/16/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 05/26/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/07/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/07/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/26/2015
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 06/24/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/12/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 11/19/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 07/28/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/19/2016
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 10/13/2015
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 05/22/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/01/2015
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 08/19/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/16/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/09/2015
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 01/15/2016
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 07/21/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 06/16/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/06/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 10/06/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 06/30/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/21/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/13/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/14/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 06/04/2015
Type: Reinforced Masonry Frame
Result: Partial Inspection
Status: Issued
Date: 02/09/2016
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 06/10/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 08/03/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/03/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 01/25/2016
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 06/16/2015
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 10/08/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 12/15/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 09/29/2015
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 06/17/2015
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 06/26/2015
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 07/22/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 07/09/2015
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 10/28/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 09/30/2015
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 06/08/2015
Type: Deputy Reinf. Concrete
Result: Order to Comply Issued
Status: Issued
Date: 08/07/2015
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 08/07/2015
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 11/06/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 09/23/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 06/02/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 03/17/2016
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 08/20/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 06/26/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 09/29/2015
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 07/21/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/22/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 04/22/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 07/22/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/08/2015
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 09/22/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 06/05/2015
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 05/04/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/04/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 09/29/2015
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 05/13/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/11/2015
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 10/21/2015
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 01/15/2016
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 06/11/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/18/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/02/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/26/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/26/2015
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 05/27/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/31/2015
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 08/21/2015
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 01/22/2016
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 03/03/2016
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/07/2016
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 04/07/2016
Type: SUSMP-Std. Urban Storm Water
Result: Insp Cancelled
Status: Issued
Date: 04/13/2016
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 04/13/2016
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 04/13/2016
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 04/13/2016
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 04/13/2016
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 04/20/2016
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 04/18/2016
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 04/22/2016
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 04/20/2016
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 04/22/2016
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 04/22/2016
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 04/20/2016
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 04/19/2016
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 04/20/2016
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 04/22/2016
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 04/18/2016
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 04/22/2016
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 04/29/2016
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 05/03/2016
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 05/04/2016
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 05/06/2016
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 05/03/2016
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/06/2016
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 05/03/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/13/2016
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 05/10/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/09/2016
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 05/13/2016
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 05/12/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/19/2016
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 05/19/2016
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 05/20/2016
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 05/16/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/19/2016
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 05/16/2016
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/19/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/17/2016
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 05/16/2016
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 05/16/2016
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/20/2016
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 05/23/2016
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 05/25/2016
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 05/27/2016
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 05/24/2016
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 05/23/2016
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 05/26/2016
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 05/23/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/26/2016
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/23/2016
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/23/2016
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 05/26/2016
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 05/25/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/24/2016
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 05/26/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/26/2016
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 06/01/2016
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 06/01/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/03/2016
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 06/03/2016
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 06/08/2016
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 06/08/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/09/2016
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 06/09/2016
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 06/06/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/13/2016
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 06/14/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/17/2016
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 06/14/2016
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 06/17/2016
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 06/14/2016
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/17/2016
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 06/17/2016
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 06/17/2016
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 06/15/2016
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 06/23/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/23/2016
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/27/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/28/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/30/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/27/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/01/2016
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 06/28/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/06/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/13/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/12/2016
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/13/2016
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/12/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/13/2016
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 07/14/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 10/28/2016
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 10/28/2016
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 10/28/2016
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 12/19/2016
Type: Fire Sprinkler Verification
Result: CofO on Hold
Status: Issued
Date: 11/15/2016
Type: SUSMP-Std. Urban Storm Water
Result: Partial Inspection
Status: Issued
Date: 12/09/2016
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 12/09/2016
Type: Green Building Final
Result: Partial Inspection
Status: Issued
Date: 12/12/2016
Type: Masonry Wall/Backfill
Result: Partial Inspection
Status: Issued
Date: 12/19/2016
Type: Plumbing Verification
Result: CofO on Hold
Status: Issued
Date: 12/19/2016
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 12/19/2016
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 12/19/2016
Type: Smoke Detectors
Result: Partial Inspection
Status: Issued
Date: 12/19/2016
Type: Heat,Vent,A/C Verification
Result: CofO on Hold
Status: Issued
Date: 12/20/2016
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 12/19/2016
Type: Electrical Verification
Result: CofO on Hold
Status: Issued
Date: 12/19/2016
Type: Final
Result: Partial Inspection
Status: Issued
Date: 12/19/2016
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 12/19/2016
Type: Green Building Final
Result: Partial Inspection
Status: Issued
Date: 12/19/2016
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 12/21/2016
Type: Grading Verification
Result: CofO on Hold
Status: Issued
Date: 12/19/2016
Type: Pressure Vessel Verification
Result: OK for CofO
Status: Issued
Date: 12/19/2016
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 12/19/2016
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 12/19/2016
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 12/19/2016
Type: SUSMP-Std. Urban Storm Water
Result: Partial Inspection
Status: Issued
Date: 12/19/2016
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 12/19/2016
Type: Green Code Verification
Result: CofO on Hold
Status: Issued
Date: 12/19/2016
Type: Elevator Verification
Result: CofO on Hold
Status: Issued
Date: 12/29/2016
Type: TCO Electrical Verification
Result: Completed (special insp)
Status: Issued
Date: 12/28/2016
Type: Reinforced Masonry Frame
Result: Partial Inspection
Status: Issued
Date: 12/30/2016
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 12/29/2016
Type: Masonry Wall/Backfill
Result: Partial Inspection
Status: Issued
Date: 12/30/2016
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 12/29/2016
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Date: 12/30/2016
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: Issued
Date: 12/30/2016
Type: TCO Heat,Vent,A/C Verification
Result: Completed (special insp)
Status: Issued
Date: 12/28/2016
Type: Structural Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 12/27/2016
Type: Final
Result: Partial Inspection
Status: Issued
Date: 12/28/2016
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 12/28/2016
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 12/29/2016
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 12/28/2016
Type: Wood Frame
Result: No Access for Inspection
Status: Issued
Date: 12/28/2016
Type: SUSMP-Std. Urban Storm Water
Result: No Access for Inspection
Status: Issued
Date: 12/30/2016
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 12/28/2016
Type: Footing/Foundation/Slab
Result: No Access for Inspection
Status: Issued
Date: 12/30/2016
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 12/30/2016
Type: Reinforced Masonry Frame
Result: Partial Inspection
Status: Issued
Date: 12/27/2016
Type: Masonry Wall/Backfill
Result: Partial Inspection
Status: Issued
Date: 12/29/2016
Type: TCO Grading Verification
Result: Completed (special insp)
Status: Issued
Date: 12/30/2016
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 12/29/2016
Type: TCO Sprinkler Verification
Result: Completed (special insp)
Status: Issued
Date: 12/28/2016
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 12/29/2016
Type: TCO Elevator Verification
Result: Completed (special insp)
Status: Issued
Date: 12/28/2016
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 12/30/2016
Type: SUSMP-Std. Urban Storm Water
Result: Partial Inspection
Status: Issued
Date: 12/28/2016
Type: TCO Green Code Verification
Result: Completed (special insp)
Status: Issued
Date: 12/28/2016
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 12/30/2016
Type: Wood Frame
Result: Approved
Status: Issued
Date: 12/28/2016
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 12/30/2016
Type: Final
Result: Partial Inspection
Status: Issued
Date: 12/28/2016
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 12/29/2016
Type: TCO Heat,Vent,A/C Verification
Result: Not Ready for Inspection
Status: Issued
Date: 01/03/2017
Type: Green Building Final
Result: Insp Cancelled
Status: Issued
Date: 05/31/2017
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 06/15/2017
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Date: 06/12/2017
Type: SUSMP-Std. Urban Storm Water
Result: Approved
Status: Issued
Date: 06/12/2017
Type: Grading Verification
Result: OK for CofO
Status: Issued
Date: 06/12/2017
Type: Final
Result: OK for TCO
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
ALPHA CONSTRUCTION CO INC

License number: 241368
Type: B
Phone: Speak with a Permit Expert
Location: VAN NUYS, CA

Permit Applicant

Principal: IRVIN BERNARD LAXINETA

Type:

Address:

Phone:

Experience: years

Applicant: ANTONIO BERMUDEZ