Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

Proposed 49 story high rise with 498 APARTMENT Units, 4,824 sf of gro

Inspection Activity
Date: 02/09/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/10/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/07/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/06/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/10/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 02/08/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/06/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/17/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/17/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/17/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/17/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/14/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/14/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/14/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/14/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/14/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/14/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/14/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/14/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/15/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/15/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/15/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/15/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/16/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/16/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/16/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/16/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/15/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/15/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/15/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/15/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/14/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/03/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/06/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/05/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/04/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/25/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/27/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 10/24/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/25/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/27/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 10/24/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/25/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/27/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 10/24/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/02/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 11/04/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 11/03/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 11/10/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 11/16/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/17/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/22/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 11/29/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/01/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/21/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/07/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/06/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/14/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/22/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/22/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 12/20/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/23/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 12/23/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/27/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/28/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/28/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/13/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/20/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/19/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/21/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/21/2017
Type: Footing/Foundation/Slab
Result: Off-Hour Fees Due
Status: Issued
Date: 04/21/2017
Type: METHANE-Barrier
Result: Off-Hour Fees Due
Status: Issued
Date: 04/21/2017
Type: METHANE-Rough
Result: Off-Hour Fees Due
Status: Issued
Date: 04/21/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/21/2017
Type: Light Gage Steel Frame
Result: Off-Hour Fees Due
Status: Issued
Date: 04/17/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/18/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/21/2017
Type: Reinforced Concrete Frame
Result: Off-Hour Fees Due
Status: Issued
Date: 04/21/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 04/21/2017
Type: METHANE-Subgrade
Result: Off-Hour Fees Due
Status: Issued
Date: 04/20/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/21/2017
Type: Verify Sprinkler Sign Off
Result: Off-Hour Fees Due
Status: Issued
Date: 05/25/2017
Type: METHANE-Rough
Result: Insp Scheduled
Status: Issued
Date: 04/28/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/27/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/27/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 05/04/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 05/01/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 05/03/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 05/04/2017
Type: METHANE-Rough
Result: Partial Approval
Status: Issued
Date: 05/04/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/05/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/04/2017
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 05/02/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 05/11/2017
Type: METHANE-Rough
Result: Partial Approval
Status: Issued
Date: 05/09/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/09/2017
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 05/11/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/08/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 05/09/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 05/11/2017
Type: Verify Sprinkler Sign Off
Result: Partial Approval
Status: Issued
Date: 05/19/2017
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 05/17/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 05/18/2017
Type: METHANE-Rough
Result: Insp Scheduled
Status: Issued
Date: 05/15/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 05/19/2017
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 05/18/2017
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 05/18/2017
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 05/18/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/16/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 05/19/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/23/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 05/26/2017
Type: METHANE-Subgrade
Result: Insp Scheduled
Status: Issued
Date: 05/25/2017
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 05/25/2017
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 05/22/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 05/26/2017
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 05/26/2017
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 05/24/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 05/26/2017
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 06/09/2017
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 06/15/2017
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 06/15/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 06/12/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 06/13/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/16/2017
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 06/13/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 06/16/2017
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 06/12/2017
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/12/2017
Type: METHANE-Barrier
Result: Approved
Status: Issued
Date: 06/14/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 06/12/2017
Type: METHANE-Subgrade
Result: Approved
Status: Issued
Date: 06/16/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/29/2017
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/27/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 06/28/2017
Type: Drywall Nailing
Result: Conditional Approval
Status: Issued
Date: 06/30/2017
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 06/30/2017
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 06/27/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 06/27/2017
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 06/26/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 06/26/2017
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 06/27/2017
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 10/06/2017
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 10/05/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 10/06/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/04/2017
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 10/05/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 10/05/2017
Type: Verify Sprinkler Sign Off
Result: Conditional Approval
Status: Issued
Date: 10/03/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/06/2017
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 10/05/2017
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/03/2017
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/06/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/12/2017
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 10/12/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/12/2017
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 10/11/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/10/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 10/11/2017
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 10/12/2017
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 10/10/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/13/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/11/2017
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/10/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/12/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/13/2017
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 10/10/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/11/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/10/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/13/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/16/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/16/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/17/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/19/2017
Type: Verify Sprinkler Sign Off
Result: Partial Approval
Status: Issued
Date: 10/19/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 10/20/2017
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 10/18/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/16/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/17/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/20/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/18/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 10/17/2017
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 10/19/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/19/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/18/2017
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 10/19/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 10/20/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/18/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/26/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 10/26/2017
Type: Verify Sprinkler Sign Off
Result: Partial Approval
Status: Issued
Date: 10/25/2017
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 10/26/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 10/27/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/03/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 11/01/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/03/2017
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 11/01/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/31/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/03/2017
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 11/03/2017
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 10/30/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/03/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/02/2017
Type: Drywall Nailing
Result: No Access for Inspection
Status: Issued
Date: 10/30/2017
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 10/31/2017
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/02/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/03/2017
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 11/03/2017
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 11/02/2017
Type: Insulation
Result: No Access for Inspection
Status: Issued
Date: 11/01/2017
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/02/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/02/2017
Type: Green Building Rough
Result: No Access for Inspection
Status: Issued
Date: 10/30/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/31/2017
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 11/01/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/18/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/18/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/16/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/19/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/17/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/20/2018
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 04/16/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/16/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/06/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/07/2017
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 11/07/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/09/2017
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 11/09/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/07/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/07/2017
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 11/06/2017
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/09/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 11/07/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/06/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/08/2017
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 11/08/2017
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 11/09/2017
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 04/20/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/15/2017
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 11/13/2017
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 11/15/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/16/2017
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 11/15/2017
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 11/13/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/17/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 11/17/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 11/17/2017
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 11/17/2017
Type: Deputy Pre-Stress Concrete
Result: Partial Approval
Status: Issued
Date: 11/15/2017
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 11/13/2017
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 11/13/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 11/17/2017
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 11/15/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/22/2017
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 11/22/2017
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 11/22/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/21/2017
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/21/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/20/2017
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/20/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/22/2017
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 11/20/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/21/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/22/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 11/20/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/30/2017
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 12/01/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/27/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/01/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 11/30/2017
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 11/30/2017
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 11/27/2017
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/29/2017
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 11/30/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 11/30/2017
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 11/30/2017
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 12/01/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/27/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/30/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/16/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 12/06/2017
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 12/05/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/06/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/08/2017
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 12/06/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 12/07/2017
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 12/07/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/06/2017
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 12/07/2017
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 12/07/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 12/04/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/04/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 12/07/2017
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 12/05/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 12/08/2017
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 12/04/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/16/2018
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 12/13/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/15/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/12/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 12/13/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 12/13/2017
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 12/13/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/12/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/12/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/15/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/15/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 12/14/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/14/2017
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 12/11/2017
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 12/14/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 12/14/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/13/2017
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 12/19/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/21/2017
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 12/18/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/19/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 12/22/2017
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 12/18/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 12/22/2017
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 12/18/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/23/2018
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 05/21/2018
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 12/29/2017
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 12/29/2017
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 12/29/2017
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 12/29/2017
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 12/28/2017
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/25/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 01/04/2018
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 01/05/2018
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 01/03/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 01/05/2018
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/05/2018
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 01/05/2018
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 01/05/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 01/04/2018
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 01/03/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/05/2018
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 01/04/2018
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/11/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/10/2018
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/08/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/11/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 01/10/2018
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 01/12/2018
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 01/10/2018
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 01/12/2018
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/09/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 01/09/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/08/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 01/08/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 01/10/2018
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 01/12/2018
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 01/09/2018
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 01/10/2018
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 01/08/2018
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 05/31/2018
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 01/18/2018
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 01/19/2018
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 01/16/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/16/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 01/17/2018
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 01/16/2018
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 01/19/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 01/17/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/17/2018
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 01/19/2018
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 01/18/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 01/26/2018
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 01/26/2018
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 01/26/2018
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 01/25/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/22/2018
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 01/26/2018
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/24/2018
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 01/23/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 01/24/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/23/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/25/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 01/22/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 01/23/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/25/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 01/22/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/24/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 06/07/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/05/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/07/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/31/2018
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 01/29/2018
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 02/01/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 01/29/2018
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 02/02/2018
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 02/01/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/02/2018
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 02/02/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 02/02/2018
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/05/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/06/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 02/09/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/08/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 02/05/2018
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 02/05/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 02/07/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 02/08/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 02/08/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/07/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/07/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 02/09/2018
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 02/05/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/09/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 02/09/2018
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 02/06/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/09/2018
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/06/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/09/2018
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 02/07/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/08/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/13/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/11/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/14/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/13/2018
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/11/2018
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 02/12/2018
Type: Drywall Nailing
Result: No Access for Inspection
Status: Issued
Date: 02/15/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/15/2018
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 02/12/2018
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 02/15/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/12/2018
Type: Light Gage Steel Frame
Result: No Access for Inspection
Status: Issued
Date: 02/16/2018
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 02/14/2018
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 02/12/2018
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/16/2018
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 02/12/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/12/2018
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 02/22/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/22/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 02/23/2018
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 02/23/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 02/23/2018
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/21/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/21/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/23/2018
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 02/23/2018
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 02/22/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/23/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/21/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 06/20/2018
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 02/27/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 02/27/2018
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 02/28/2018
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 03/01/2018
Type: Drywall Nailing
Result: No Access for Inspection
Status: Issued
Date: 02/26/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/26/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 02/26/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/27/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/20/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/20/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/07/2018
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 03/06/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/09/2018
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 03/06/2018
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 03/08/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 03/09/2018
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/05/2018
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 03/06/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 03/09/2018
Type: Deputy Other (see comments)
Result: Insp Scheduled
Status: Issued
Date: 03/06/2018
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 03/07/2018
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 03/08/2018
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 03/09/2018
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 03/07/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/06/2018
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 03/08/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/06/2018
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 03/08/2018
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 03/06/2018
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 03/07/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 03/12/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/14/2018
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 03/16/2018
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 03/12/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 03/12/2018
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 03/12/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/13/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 03/12/2018
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 03/12/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/27/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/29/2018
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 03/22/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/22/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/06/2018
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 07/06/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 07/06/2018
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 04/04/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/03/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/02/2018
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 04/05/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/05/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/06/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/06/2018
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/04/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/03/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/03/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 04/05/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/13/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/10/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/11/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/10/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/10/2018
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 04/11/2018
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 04/12/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/09/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/12/2018
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/11/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/11/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/13/2018
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/09/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/12/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/12/2018
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 04/13/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/10/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/10/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/10/2018
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 04/11/2018
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 04/11/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/12/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/09/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/12/2018
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/11/2018
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/11/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/13/2018
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/09/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/11/2019
Type: TCO Heat,Vent,A/C Verification
Result: Completed (special insp)
Status: Issued
Date: 07/16/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/18/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/20/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 07/16/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/16/2018
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/11/2019
Type: TCO Plumbing Verification
Result: Insp Scheduled
Status: Issued
Date: 07/11/2019
Type: TCO Sprinkler Verification
Result: Completed (special insp)
Status: Issued
Date: 07/11/2019
Type: TCO Electrical Verification
Result: Completed (special insp)
Status: Issued
Date: 07/12/2019
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 07/24/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/25/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/31/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 08/03/2018
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 07/31/2018
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 08/03/2018
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 08/03/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 08/09/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 08/06/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 08/15/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/05/2019
Type: T-Bar Ceiling
Result: Not Ready for Inspection
Status: Issued
Date: 11/04/2019
Type: T-Bar Ceiling
Result: Partial Inspection
Status: Issued
Date: 08/23/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/21/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 08/30/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 08/29/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/07/2018
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 09/12/2018
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 09/14/2018
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 09/12/2018
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 09/14/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 09/17/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 09/21/2018
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 09/19/2018
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 09/21/2018
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 09/19/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 09/27/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/27/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/12/2018
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 10/16/2018
Type: Drywall Nailing
Result: Conditional Approval
Status: Issued
Date: 10/19/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 10/16/2018
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 08/23/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/25/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/25/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 08/29/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/28/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/07/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/07/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/05/2018
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 08/28/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 08/27/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 08/30/2019
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 08/26/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 08/27/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 12/24/2018
Type: Pre-Inspection
Result: Corrections Issued
Status: Issued
Date: 01/03/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/08/2019
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 11/26/2019
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 01/14/2019
Type: Structural Steel Frame
Result: Conditional Approval
Status: Issued
Date: 01/16/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/14/2019
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 01/14/2019
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 01/14/2019
Type: Reinforced Concrete Frame
Result: Conditional Approval
Status: Issued
Date: 01/23/2019
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 01/23/2019
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 01/23/2019
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 01/23/2019
Type: Structural Steel Frame
Result: No Access for Inspection
Status: Issued
Date: 01/31/2019
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 01/31/2019
Type: Final
Result: Partial Inspection
Status: Issued
Date: 01/31/2019
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 01/31/2019
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 02/07/2019
Type: Elevator Verification
Result: OK for CofO
Status: Issued
Date: 02/08/2019
Type: TCO Electrical Verification
Result: Completed (special insp)
Status: Issued
Date: 02/06/2019
Type: Pressure Vessel Verification
Result: CofO on Hold
Status: Issued
Date: 02/05/2019
Type: Green Building Final
Result: Partial Inspection
Status: Issued
Date: 02/08/2019
Type: TCO Elevator Verification
Result: Completed (special insp)
Status: Issued
Date: 02/05/2019
Type: Final
Result: OK for TCO
Status: Issued
Date: 02/05/2019
Type: Reinforced Concrete Frame
Result: Approved
Status: Issued
Date: 02/07/2019
Type: Electrical Verification
Result: CofO on Hold
Status: Issued
Date: 02/08/2019
Type: TCO PV Verification
Result: Completed (special insp)
Status: Issued
Date: 02/05/2019
Type: Structural Steel Frame
Result: Approved
Status: Issued
Date: 02/15/2019
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 02/15/2019
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 02/27/2019
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 02/27/2019
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 12/11/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/09/2019
Type: Light Gage Steel Frame
Result: No Access for Inspection
Status: Issued
Date: 12/12/2019
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 04/16/2019
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 12/17/2019
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 12/27/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 12/31/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/08/2020
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 01/10/2020
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 01/24/2020
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 01/23/2020
Type: TCO Sprinkler Verification
Result: Completed (special insp)
Status: Issued
Date: 01/22/2020
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 01/23/2020
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Date: 01/30/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/04/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/07/2020
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 02/12/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 02/19/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/25/2020
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 03/04/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/10/2020
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 07/14/2020
Type: Special/Order Compliance
Result: Conditional Approval
Status: Issued
Date: 08/20/2021
Type: Plumbing Verification
Result: Insp Scheduled
Status: Issued
Date: 12/16/2020
Type: Special/Order Compliance
Result: Conditional Approval
Status: Issued
Date: 08/26/2021
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 08/26/2021
Type: Green Building Final
Result: Approved
Status: CofO Issued
Date: 08/26/2021
Type: Drywall Nailing
Result: Approved
Status: CofO Issued
Date: 08/26/2021
Type: CofO Issuance
Result: CofO in Progress
Status: CofO Issued
Date: 08/26/2021
Type: Final
Result: OK to Issue CofO
Status: CofO Issued
Date: 08/26/2021
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 08/26/2021
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 06/16/2021
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 07/15/2021
Type: Electrical Verification
Result: Insp Scheduled
Status: Issued
Date: 07/16/2021
Type: Plumbing Verification
Result: CofO on Hold
Status: Issued
Date: 07/15/2021
Type: Heat,Vent,A/C Verification
Result: OK for CofO
Status: Issued
Date: 08/03/2021
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
ONNI CONTRACTING (CALIFORNIA) INC

License number: 976929
Type: B
Phone: Speak with a Permit Expert
Location: LOS ANGELES, CA

Permit Applicant

Principal: APRIANO MEOLA

Type:

Address:

Phone:

Experience: years

Applicant: MARK SPECTOR