Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

New 7-story (5 stories of Type IIIA over 2 stories of Type IA) mixed-u

Inspection Activity
Date: 04/05/2016
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 04/06/2016
Type: Public Counter
Result: Completed
Status: Issued
Date: 10/26/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/27/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/25/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/28/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/26/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/25/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/27/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/28/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/26/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/25/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/27/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/28/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/01/2016
Type: METHANE-Subgrade
Result: Partial Inspection
Status: Issued
Date: 11/02/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/01/2016
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 11/04/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/04/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/03/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/03/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/01/2016
Type: METHANE-Barrier
Result: Partial Inspection
Status: Issued
Date: 11/10/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/07/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/14/2016
Type: METHANE-Subgrade
Result: Partial Inspection
Status: Issued
Date: 11/14/2016
Type: METHANE-Barrier
Result: Partial Inspection
Status: Issued
Date: 11/18/2016
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 11/16/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/16/2016
Type: METHANE-Subgrade
Result: Partial Inspection
Status: Issued
Date: 11/16/2016
Type: METHANE-Barrier
Result: Partial Inspection
Status: Issued
Date: 11/18/2016
Type: METHANE-Subgrade
Result: Insp Scheduled
Status: Issued
Date: 11/16/2016
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 11/14/2016
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 11/18/2016
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 11/23/2016
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 11/23/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/23/2016
Type: METHANE-Subgrade
Result: Insp Scheduled
Status: Issued
Date: 11/23/2016
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 12/02/2016
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 12/02/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/29/2016
Type: METHANE-Subgrade
Result: Partial Inspection
Status: Issued
Date: 11/29/2016
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 11/29/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/01/2016
Type: METHANE-Subgrade
Result: Partial Inspection
Status: Issued
Date: 12/01/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/01/2016
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 11/29/2016
Type: METHANE-Barrier
Result: Partial Inspection
Status: Issued
Date: 11/30/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/01/2016
Type: METHANE-Barrier
Result: Partial Inspection
Status: Issued
Date: 12/05/2016
Type: METHANE-Barrier
Result: Partial Inspection
Status: Issued
Date: 12/05/2016
Type: METHANE-Subgrade
Result: Partial Inspection
Status: Issued
Date: 12/09/2016
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 12/07/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/08/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/06/2016
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 12/09/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/05/2016
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 12/06/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/06/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/14/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/16/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/15/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/15/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/14/2016
Type: METHANE-Barrier
Result: Partial Inspection
Status: Issued
Date: 12/14/2016
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 12/14/2016
Type: METHANE-Subgrade
Result: Partial Inspection
Status: Issued
Date: 12/15/2016
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 12/20/2016
Type: METHANE-Subgrade
Result: Partial Inspection
Status: Issued
Date: 12/21/2016
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 12/23/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/22/2016
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/20/2016
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 12/22/2016
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 12/20/2016
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 12/20/2016
Type: METHANE-Barrier
Result: Partial Inspection
Status: Issued
Date: 12/21/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/20/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/23/2016
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 12/22/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/27/2016
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 12/29/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/30/2016
Type: Structural Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 12/30/2016
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 12/30/2016
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 12/30/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/28/2016
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 01/06/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/06/2017
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 01/06/2017
Type: METHANE-Subgrade
Result: Insp Scheduled
Status: Issued
Date: 01/06/2017
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 04/13/2017
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 04/18/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/19/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/19/2017
Type: METHANE-Subgrade
Result: Partial Inspection
Status: Issued
Date: 04/19/2017
Type: METHANE-Barrier
Result: Partial Inspection
Status: Issued
Date: 04/17/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/21/2017
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 04/21/2017
Type: METHANE-Subgrade
Result: Insp Scheduled
Status: Issued
Date: 04/20/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/21/2017
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 04/21/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/19/2017
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/28/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/26/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/25/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/27/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/24/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/04/2017
Type: METHANE-Subgrade
Result: Partial Inspection
Status: Issued
Date: 05/04/2017
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/05/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/04/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/04/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/04/2017
Type: METHANE-Barrier
Result: Partial Inspection
Status: Issued
Date: 05/11/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/10/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/09/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/10/2017
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 05/12/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/10/2017
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 05/09/2017
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/09/2017
Type: METHANE-Barrier
Result: Partial Inspection
Status: Issued
Date: 05/11/2017
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 05/09/2017
Type: METHANE-Subgrade
Result: Partial Inspection
Status: Issued
Date: 05/08/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/18/2017
Type: METHANE-Barrier
Result: Partial Inspection
Status: Issued
Date: 05/15/2017
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 05/18/2017
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/19/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/18/2017
Type: METHANE-Subgrade
Result: Partial Inspection
Status: Issued
Date: 05/15/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/18/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/25/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/23/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/24/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/26/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/22/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/31/2017
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 05/31/2017
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/01/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/02/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/05/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/08/2017
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/08/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/07/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/08/2017
Type: METHANE-Subgrade
Result: Partial Inspection
Status: Issued
Date: 06/08/2017
Type: METHANE-Barrier
Result: Partial Inspection
Status: Issued
Date: 06/06/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/11/2017
Type: METHANE-Barrier
Result: Partial Inspection
Status: Issued
Date: 10/11/2017
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 10/11/2017
Type: METHANE-Subgrade
Result: Partial Inspection
Status: Issued
Date: 10/19/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 10/19/2017
Type: METHANE-Rough
Result: Partial Inspection
Status: Issued
Date: 10/16/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/16/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 10/16/2017
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 10/19/2017
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 10/19/2017
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 10/16/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/01/2018
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/28/2019
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 05/01/2018
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 05/01/2018
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 05/01/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 05/01/2018
Type: METHANE-Rough
Result: Partial Inspection
Status: Issued
Date: 12/04/2017
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 12/04/2017
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 12/08/2017
Type: Pre-Inspection
Result: Cancelled
Status: Issued
Date: 12/04/2017
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 12/04/2017
Type: METHANE-Rough
Result: Partial Inspection
Status: Issued
Date: 12/12/2017
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 06/14/2019
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 12/22/2017
Type: Public Counter
Result: Completed
Status: Issued
Date: 12/21/2017
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 02/02/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 02/05/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/15/2018
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 08/20/2020
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 02/26/2018
Type: METHANE-Subgrade
Result: Approved
Status: Issued
Date: 02/26/2018
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 02/26/2018
Type: METHANE-Barrier
Result: Approved
Status: Issued
Date: 06/14/2019
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 10/29/2019
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 03/29/2018
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 07/05/2019
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 04/09/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 04/09/2018
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 04/09/2018
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 04/09/2018
Type: METHANE-Rough
Result: Partial Inspection
Status: Issued
Date: 04/09/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 04/09/2018
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 04/09/2018
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 04/09/2018
Type: METHANE-Rough
Result: Partial Inspection
Status: Issued
Date: 07/10/2019
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 07/10/2019
Type: METHANE-Rough
Result: Approved
Status: Issued
Date: 07/10/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 07/10/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 07/23/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/23/2018
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/23/2018
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 08/02/2018
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 08/02/2018
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 08/02/2018
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 08/10/2018
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 08/10/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 08/10/2018
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 11/08/2019
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 11/08/2019
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 08/13/2018
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 12/24/2020
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 09/19/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 09/19/2018
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 09/19/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/19/2018
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 09/25/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/25/2018
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 04/06/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 11/23/2021
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 08/20/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/15/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 08/20/2019
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 08/23/2019
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 10/24/2018
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 10/23/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/14/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/14/2018
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 12/28/2018
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 12/28/2018
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 09/04/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/11/2019
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 01/10/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/28/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/02/2019
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 09/16/2019
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 09/26/2019
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 02/25/2019
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 12/09/2019
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 04/03/2019
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 04/08/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/15/2019
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 04/23/2019
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 04/23/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 12/20/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 04/30/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/30/2019
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 12/27/2019
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 12/26/2019
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 01/08/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/15/2020
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 05/14/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/15/2020
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 09/10/2020
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 09/10/2020
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 09/10/2020
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 09/10/2020
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 09/10/2020
Type: Final
Result: Partial Inspection
Status: Issued
Date: 09/10/2020
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 01/31/2020
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 09/10/2020
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 09/10/2020
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 09/10/2020
Type: Reinforced Masonry Frame
Result: Partial Inspection
Status: Issued
Date: 09/10/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 02/06/2020
Type: Masonry Wall/Backfill
Result: Partial Inspection
Status: Issued
Date: 05/19/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/11/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/14/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 09/14/2020
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 09/14/2020
Type: Reinforced Masonry Frame
Result: Partial Inspection
Status: Issued
Date: 09/14/2020
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 09/14/2020
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 09/14/2020
Type: Final
Result: Corrections Issued
Status: Issued
Date: 09/14/2020
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 02/26/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/26/2020
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 03/02/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 09/14/2020
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 03/10/2020
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 06/09/2020
Type: Special/Order Compliance
Result: Corrections Issued
Status: Issued
Date: 09/25/2020
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 09/25/2020
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 09/25/2020
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 09/25/2020
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 09/25/2020
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 09/25/2020
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 09/25/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 09/25/2020
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 09/25/2020
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 09/25/2020
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 09/25/2020
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 09/25/2020
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 09/25/2020
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 09/25/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 09/30/2020
Type: TCO AIM Verification
Result: Insp Scheduled
Status: Issued
Date: 09/28/2020
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Date: 09/28/2020
Type: TCO Sprinkler Verification
Result: Completed (special insp)
Status: Issued
Date: 09/28/2020
Type: TCO PV Verification
Result: Completed (special insp)
Status: Issued
Date: 09/28/2020
Type: TCO Electrical Verification
Result: Completed (special insp)
Status: Issued
Date: 09/28/2020
Type: TCO Elevator Verification
Result: Completed (special insp)
Status: Issued
Date: 09/28/2020
Type: TCO Grading Verification
Result: Completed (special insp)
Status: Issued
Date: 10/05/2020
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 09/28/2020
Type: TCO Heat,Vent,A/C Verification
Result: Not Ready for Inspection
Status: Issued
Date: 08/06/2020
Type: Fire Sprinkler Verification
Result: CofO on Hold
Status: Issued
Date: 08/06/2020
Type: Heat,Vent,A/C Verification
Result: CofO on Hold
Status: Issued
Date: 10/05/2020
Type: Verify Sprinkler Sign Off
Result: Conditional Approval
Status: Issued
Date: 10/06/2020
Type: TCO Sprinkler Verification
Result: Completed (special insp)
Status: Issued
Date: 10/05/2020
Type: Wood Frame
Result: Conditional Approval
Status: Issued
Date: 10/06/2020
Type: TCO Electrical Verification
Result: Completed (special insp)
Status: Issued
Date: 10/08/2020
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 10/05/2020
Type: Reinforced Concrete Frame
Result: Conditional Approval
Status: Issued
Date: 10/05/2020
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: Issued
Date: 10/06/2020
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 10/06/2020
Type: TCO Heat,Vent,A/C Verification
Result: Completed (special insp)
Status: Issued
Date: 10/09/2020
Type: Special/Order Compliance
Result: Corrections Issued
Status: Issued
Date: 10/08/2020
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 10/05/2020
Type: Green Building Final
Result: Partial Approval
Status: Issued
Date: 10/05/2020
Type: Reinforced Masonry Frame
Result: Conditional Approval
Status: Issued
Date: 10/06/2020
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Date: 10/05/2020
Type: Pre-Inspection
Result: Conditional Approval
Status: Issued
Date: 11/23/2021
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 10/15/2020
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 10/15/2020
Type: TCO Electrical Verification
Result: Not Ready for Inspection
Status: Issued
Date: 10/13/2020
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Date: 10/13/2020
Type: Special/Order Compliance
Result: Conditional Approval
Status: Issued
Date: 10/21/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 10/21/2020
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 10/21/2020
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Date: 10/21/2020
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 10/23/2020
Type: TCO Electrical Verification
Result: Completed (special insp)
Status: Issued
Date: 10/20/2020
Type: TCO Electrical Verification
Result: Insp Scheduled
Status: Issued
Date: 10/21/2020
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 10/21/2020
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 10/21/2020
Type: Green Building Final
Result: Approved
Status: Issued
Date: 10/21/2020
Type: TCO Heat,Vent,A/C Verification
Result: Completed (special insp)
Status: Issued
Date: 11/23/2021
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 11/04/2020
Type: Special/Order Compliance
Result: Conditional Approval
Status: Issued
Date: 11/19/2020
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 02/17/2021
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 03/09/2021
Type: Special/Order Compliance
Result: Insp Cancelled
Status: Issued
Date: 03/11/2021
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 04/07/2021
Type: Special/Order Compliance
Result: Conditional Approval
Status: Issued
Date: 09/03/2021
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 09/03/2021
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 09/03/2021
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 09/03/2021
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 09/03/2021
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 09/15/2021
Type: Plumbing Verification
Result: OK for CofO
Status: Issued
Date: 09/14/2021
Type: Pressure Vessel Verification
Result: OK for CofO
Status: Issued
Date: 09/15/2021
Type: Heat,Vent,A/C Verification
Result: Insp Scheduled
Status: Issued
Date: 09/14/2021
Type: Electrical Verification
Result: CofO on Hold
Status: Issued
Date: 11/18/2021
Type: Reinforced Concrete Frame
Result: Approved
Status: CofO in Progress
Date: 11/18/2021
Type: Reinforced Masonry Frame
Result: Approved
Status: CofO in Progress
Date: 11/18/2021
Type: Wood Frame
Result: Approved
Status: CofO in Progress
Date: 11/18/2021
Type: CofO Issuance
Result: CofO in Progress
Status: CofO in Progress
Date: 11/18/2021
Type: Final
Result: OK to Issue CofO
Status: CofO in Progress
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
FASSBERG CONTRACTING CORPORATION

License number: 878820
Type: B
Phone: Speak with a Permit Expert
Location: ENCINO, CA

Permit Applicant

Principal: ABRAHAM SHRAGA FASSBERG

Type:

Address: 5055 WILSHIRE BL, #204, LA CA

Phone:

Experience: years

Applicant: LYNDA HAAS