Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

(N) single family dwelling with basement and subterranean garage

Inspection Activity
Date: 07/20/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 07/19/2016
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 07/19/2016
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 07/19/2016
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 08/05/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 08/09/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 08/11/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 04/07/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/04/2017
Type: ELECTRICAL-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 07/31/2015
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 02/17/2016
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 06/08/2015
Type: FLOOD-Elevation Certificate
Result: Approved
Status: Issued
Date: 02/23/2016
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 02/23/2016
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 07/31/2015
Type: Underground Mechanical
Result: Not Ready for Inspection
Status: Issued
Date: 02/12/2016
Type: Special/Order Compliance
Result: Corrections Issued
Status: Issued
Date: 11/12/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 01/22/2016
Type: Deputy Reinf. Concrete
Result: No Access for Inspection
Status: Issued
Date: 02/02/2016
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 02/26/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 09/17/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/17/2016
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 07/06/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/25/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/30/2015
Type: Deputy Reinf. Concrete
Result: No Access for Inspection
Status: Issued
Date: 07/06/2015
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 03/09/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Approved
Status: Issued
Date: 12/31/2015
Type: PLUMBING-Rough
Result: Insp Scheduled
Status: Issued
Date: 03/17/2016
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 03/17/2016
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 07/06/2015
Type: FLOOD-Proofing Certificate
Result: Approved
Status: Issued
Date: 06/08/2015
Type: Footing/Foundation/Slab
Result: Corrections Issued
Status: Issued
Date: 03/22/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/08/2015
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/18/2016
Type: Piling/Pier/Caisson
Result: Insp Cancelled
Status: Issued
Date: 07/31/2015
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 04/15/2015
Type: Piling/Pier/Caisson
Result: Corrections Issued
Status: Issued
Date: 07/06/2015
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 09/16/2015
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 07/31/2015
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 10/02/2015
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 07/06/2015
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 02/23/2016
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 02/17/2016
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/20/2016
Type: Underground Mechanical
Result: Approved
Status: Issued
Date: 10/06/2015
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/22/2016
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/29/2015
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 01/12/2016
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 07/31/2015
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 06/09/2015
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/17/2016
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 11/09/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 11/20/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 04/27/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 05/11/2016
Type: Deputy Steel/Welding
Result: No Access for Inspection
Status: Issued
Date: 05/10/2016
Type: Deputy Steel/Welding
Result: No Access for Inspection
Status: Issued
Date: 05/18/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/19/2016
Type: Deputy Steel/Welding
Result: No Access for Inspection
Status: Issued
Date: 05/16/2016
Type: Deputy Steel/Welding
Result: No Access for Inspection
Status: Issued
Date: 05/18/2016
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 05/18/2016
Type: Rough-Elec/Plmb/HVAC
Result: Corrections Issued
Status: Issued
Date: 05/24/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/25/2016
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 05/25/2016
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/08/2016
Type: Deputy Steel/Welding
Result: No Access for Inspection
Status: Issued
Date: 06/07/2016
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/07/2016
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 06/07/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/08/2016
Type: Deputy Drilled-In Anchors
Result: No Access for Inspection
Status: Issued
Date: 06/17/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/16/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/24/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 06/28/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 06/28/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 07/06/2016
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 07/06/2016
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 07/06/2016
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 07/14/2016
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 07/14/2016
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 07/14/2016
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 07/15/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/25/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 10/27/2016
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 10/25/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 10/27/2016
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 10/25/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 10/27/2016
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 11/01/2016
Type: Deputy Reinf. Concrete
Result: No Access for Inspection
Status: Issued
Date: 10/31/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Conditional Approval
Status: Issued
Date: 11/14/2016
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 11/14/2016
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 11/16/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/16/2016
Type: Deputy Steel/Welding
Result: No Access for Inspection
Status: Issued
Date: 11/14/2016
Type: HVAC-Rough
Result: Partial Approval
Status: Issued
Date: 11/14/2016
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 12/01/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/08/2016
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 12/08/2016
Type: BUILDING-Rough-Frame
Result: Not Ready for Inspection
Status: Issued
Date: 12/09/2016
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 12/09/2016
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 12/08/2016
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 12/14/2016
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 12/14/2016
Type: BUILDING-Rough-Frame
Result: Insp Scheduled
Status: Issued
Date: 12/22/2016
Type: Rough-Elec/Plmb/HVAC
Result: Not Ready for Inspection
Status: Issued
Date: 12/19/2016
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 04/10/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 04/13/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 04/18/2017
Type: Reinforced Concrete Frame
Result: Corrections Issued
Status: Issued
Date: 04/18/2017
Type: Verify Sprinkler Sign Off
Result: Partial Approval
Status: Issued
Date: 04/19/2017
Type: PLUMBING-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 04/28/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 04/26/2017
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 05/03/2017
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/03/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/12/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/09/2017
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 05/09/2017
Type: Rough-Elec/Plmb/HVAC
Result: Partial Approval
Status: Issued
Date: 05/18/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/22/2017
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 05/31/2017
Type: Sewer
Result: Approved
Status: Issued
Date: 06/14/2017
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 06/29/2017
Type: Underground Mechanical
Result: Partial Approval
Status: Issued
Date: 10/02/2017
Type: HVAC-Rough
Result: Partial Approval
Status: Issued
Date: 10/23/2017
Type: HVAC-Rough
Result: Partial Approval
Status: Issued
Date: 04/20/2018
Type: HVAC-Rough
Result: Insp Scheduled
Status: Issued
Date: 11/20/2017
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 12/05/2017
Type: HVAC-Rough
Result: Partial Approval
Status: Issued
Date: 12/14/2017
Type: ELECTRICAL-Rough
Result: Insp Cancelled
Status: Issued
Date: 12/13/2017
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 12/14/2017
Type: PLUMBING-Rough
Result: Insp Cancelled
Status: Issued
Date: 06/11/2018
Type: HVAC-Rough
Result: Partial Approval
Status: Issued
Date: 02/15/2018
Type: HVAC-Rough
Result: Insp Scheduled
Status: Issued
Date: 02/15/2018
Type: HVAC-Rough
Result: Partial Inspection
Status: Issued
Date: 02/20/2018
Type: Special/Order Compliance
Result: Corrections Issued
Status: Issued
Date: 02/20/2018
Type: HVAC-Rough
Result: Partial Approval
Status: Issued
Date: 06/29/2018
Type: Special/Order Compliance
Result: Conditional Approval
Status: Issued
Date: 06/29/2018
Type: ELECTRICAL-Final
Result: Insp Scheduled
Status: Issued
Date: 04/02/2018
Type: HVAC-Rough
Result: Partial Approval
Status: Issued
Date: 07/18/2018
Type: ELECTRICAL-Final
Result: Corrections Issued
Status: Issued
Date: 07/18/2018
Type: HVAC-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 07/10/2019
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 07/10/2019
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 07/10/2019
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 07/23/2018
Type: HVAC-Rough
Result: Insp Cancelled
Status: Issued
Date: 07/23/2018
Type: Service/Power Release
Result: Insp Cancelled
Status: Issued
Date: 07/23/2018
Type: Service/Power Release
Result: Approved
Status: Issued
Date: 07/23/2018
Type: HVAC-Rough
Result: Partial Approval
Status: Issued
Date: 10/11/2018
Type: Gas Test
Result: Approved
Status: Issued
Date: 02/04/2019
Type: HVAC-Final
Result: Approved
Status: Issued
Date: 02/13/2019
Type: PLUMBING-Final
Result: Approved
Status: Issued
Date: 03/22/2019
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 03/22/2019
Type: Structural Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/22/2019
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 03/22/2019
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 03/22/2019
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 03/22/2019
Type: BUILDING-Rough-Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/22/2019
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 03/22/2019
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/22/2019
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 03/28/2019
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 03/28/2019
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/28/2019
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 03/28/2019
Type: Final
Result: Partial Inspection
Status: Issued
Date: 03/28/2019
Type: Structural Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/28/2019
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 03/29/2019
Type: Fire Sprinkler Verification
Result: OK for CofO
Status: Issued
Date: 03/28/2019
Type: BUILDING-Rough-Frame
Result: Partial Approval
Status: Issued
Date: 03/28/2019
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 03/28/2019
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 04/02/2019
Type: Reinforced Concrete Frame
Result: Approved
Status: Issued
Date: 04/02/2019
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 04/02/2019
Type: Structural Steel Frame
Result: Approved
Status: Issued
Date: 04/02/2019
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 04/02/2019
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: Issued
Date: 04/02/2019
Type: Green Building Final
Result: Approved
Status: Issued
Date: 04/02/2019
Type: BUILDING-Rough-Frame
Result: Approved
Status: Issued
Date: 04/02/2019
Type: Final
Result: Partial Inspection
Status: Issued
Date: 04/08/2019
Type: Grading Verification
Result: CofO on Hold
Status: Issued
Date: 04/23/2019
Type: Final
Result: Conditional Approval
Status: Issued
Date: 05/20/2019
Type: CofO Issuance
Result: CofO in Progress
Status: CofO in Progress
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
TYLER DEVELOPMENT CORPORATION

License number: 451882
Type: B
Phone: Speak with a Permit Expert
Location: CALABASAS, CA

Permit Applicant

Principal: RONALD ORSON UDALL

Type:

Address: 10960 WILSHIRE BLVD, #1510, LOS ANGELES, CA

Phone:

Experience: years

Applicant: STEVEN SOMERS