Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

(n) 49 unit (with density bonus of 4 very low income units) apartment

Inspection Activity
Date: 07/22/2016
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 07/20/2016
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 08/09/2016
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 02/06/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 02/14/2017
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 02/14/2017
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 02/14/2017
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 02/14/2017
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: FLOOD-Proofing Certificate
Result: Approved
Status: Issued
Date: 02/14/2017
Type: FLOOD-Proofing Certificate
Result: Approved
Status: Issued
Date: 02/14/2017
Type: FLOOD-Proofing Certificate
Result: Approved
Status: Issued
Date: 02/14/2017
Type: FLOOD-Proofing Certificate
Result: Approved
Status: Issued
Date: 02/14/2017
Type: Green Building Rough
Result: Cancelled
Status: Issued
Date: 02/14/2017
Type: Green Building Rough
Result: Cancelled
Status: Issued
Date: 02/14/2017
Type: Green Building Rough
Result: Cancelled
Status: Issued
Date: 02/14/2017
Type: Green Building Rough
Result: Cancelled
Status: Issued
Date: 02/14/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 04/06/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/07/2017
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 07/10/2015
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 02/26/2016
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 09/30/2015
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 02/29/2016
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 09/28/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/14/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/02/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 11/18/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/24/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 07/07/2015
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 09/21/2015
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 07/07/2015
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 02/19/2016
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 09/01/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/07/2015
Type: FLOOD-Elevation Certificate
Result: Approved
Status: Issued
Date: 09/17/2015
Type: FLOOD-Proofing Certificate
Result: Not Ready for Inspection
Status: Issued
Date: 10/01/2015
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 09/17/2015
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/11/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 09/29/2015
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 01/20/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 07/09/2015
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 09/03/2015
Type: Deputy Shotcrete
Result: Insp Cancelled
Status: Issued
Date: 09/17/2015
Type: Reinforced Masonry Frame
Result: No Access for Inspection
Status: Issued
Date: 08/31/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/11/2016
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 10/01/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/02/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/14/2016
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 09/08/2015
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 09/16/2015
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 09/18/2015
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 09/29/2015
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 02/24/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 05/27/2015
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 07/02/2015
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 07/14/2015
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 09/28/2015
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/25/2016
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 09/14/2015
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 02/23/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 08/21/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 09/24/2015
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 11/30/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 09/22/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/09/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 09/17/2015
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 12/09/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 09/15/2015
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 09/02/2015
Type: Deputy Shotcrete
Result: Insp Cancelled
Status: Issued
Date: 02/18/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 09/11/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 09/09/2015
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 09/23/2015
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 08/13/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 03/01/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 07/08/2015
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/28/2015
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 12/30/2015
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/02/2016
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 02/17/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 02/16/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 03/01/2016
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 03/02/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/21/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/10/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 12/03/2015
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 03/08/2016
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 09/15/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 02/25/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 03/03/2016
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 03/08/2016
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 09/11/2015
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 03/03/2016
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 09/01/2015
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 02/09/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 05/21/2015
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 11/20/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/01/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/22/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 12/09/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/04/2015
Type: Deputy Shotcrete
Result: Insp Cancelled
Status: Issued
Date: 09/10/2015
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 09/18/2015
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 01/22/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/17/2015
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 03/30/2016
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 07/16/2015
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 02/29/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 03/30/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 09/25/2015
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 09/25/2015
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 05/04/2016
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 05/03/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 05/03/2016
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 05/06/2016
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/06/2016
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 05/04/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 05/05/2016
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 05/05/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 05/11/2016
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 05/10/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 05/18/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/19/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/01/2016
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 06/03/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 05/31/2016
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 05/31/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/02/2016
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 06/03/2016
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 06/10/2016
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 06/10/2016
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 06/10/2016
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 06/27/2016
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 06/28/2016
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 06/27/2016
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 06/28/2016
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 07/06/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 07/06/2016
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 07/07/2016
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 07/05/2016
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/27/2016
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 10/27/2016
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 10/27/2016
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 10/31/2016
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 11/02/2016
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 11/10/2016
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 11/30/2016
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 11/30/2016
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/06/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/09/2016
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 12/08/2016
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 01/03/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/12/2017
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 04/14/2017
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 04/10/2017
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 04/14/2017
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 04/12/2017
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 04/21/2017
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 04/21/2017
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 04/26/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/28/2017
Type: T-Bar Ceiling
Result: Insp Scheduled
Status: Issued
Date: 05/01/2017
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 05/03/2017
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 05/08/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/09/2017
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 05/10/2017
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 05/15/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/25/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/23/2017
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 05/30/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/16/2017
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 05/04/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 04/30/2018
Type: Final
Result: Partial Approval
Status: Issued
Date: 05/03/2018
Type: Final
Result: Partial Approval
Status: Issued
Date: 12/05/2017
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 12/19/2017
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 05/21/2018
Type: Final
Result: Partial Approval
Status: Issued
Date: 05/31/2018
Type: Final
Result: Partial Approval
Status: Issued
Date: 05/30/2018
Type: Grading Pre-Inspection
Result: Approved
Status: Issued
Date: 05/29/2018
Type: Final
Result: Partial Approval
Status: Issued
Date: 06/06/2018
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 06/05/2018
Type: Final
Result: Partial Approval
Status: Issued
Date: 06/08/2018
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 06/04/2018
Type: Final
Result: Partial Approval
Status: Issued
Date: 02/20/2018
Type: Interior/Exterior Lathing
Result: Approved
Status: Issued
Date: 06/20/2018
Type: Plumbing Verification
Result: CofO on Hold
Status: Issued
Date: 06/20/2018
Type: Heat,Vent,A/C Verification
Result: Insp Scheduled
Status: Issued
Date: 06/22/2018
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 06/21/2018
Type: Elevator Verification
Result: OK for CofO
Status: Issued
Date: 10/03/2018
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 02/22/2019
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 03/27/2019
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 03/27/2019
Type: CofO Issuance
Result: CofO in Progress
Status: CofO Issued
Date: 03/27/2019
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 03/27/2019
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
SMA BUILDERS INC

License number: 457725
Type: B
Phone: Speak with a Permit Expert
Location: VAN NUYS, CA

Permit Applicant

Principal: SHAWN MARC ANTIN

Type:

Address:

Phone:

Experience: years

Applicant: SAM GHANOVANI