Bldg-Alter/Repair Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

RENOVATION OF EXISTING RESIDENTIAL TOWER; LOBBY, LEASING OFFICE, LOUNG

Inspection Activity
Date: 07/21/2016
Type: Green Building Final
Result: Partial Approval
Status: Issued
Date: 07/21/2016
Type: Public Counter
Result: Completed
Status: Issued
Date: 07/27/2016
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 07/27/2016
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 07/27/2016
Type: Green Building Final
Result: Insp Cancelled
Status: Issued
Date: 07/27/2016
Type: Final
Result: Partial Inspection
Status: Issued
Date: 07/27/2016
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 07/27/2016
Type: Smoke Detectors
Result: Partial Approval
Status: Issued
Date: 12/29/2015
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 01/05/2016
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/18/2015
Type: Public Counter
Result: Completed
Status: Issued
Date: 12/22/2015
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/18/2015
Type: Light Gage Steel Frame
Result: Conditional Approval
Status: Issued
Date: 12/22/2016
Type: Special/Order Compliance
Result: Conditional Approval
Status: Issued
Date: 12/22/2016
Type: Public Counter
Result: Completed
Status: Issued
Date: 10/20/2017
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 10/24/2017
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 10/24/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 04/18/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/20/2018
Type: T-Bar Ceiling
Result: Insp Scheduled
Status: Issued
Date: 05/31/2019
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 05/31/2019
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 05/31/2019
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 05/31/2019
Type: Smoke Detectors
Result: Insp Scheduled
Status: Issued
Date: 11/21/2017
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 11/20/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/02/2018
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 05/02/2018
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/02/2018
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 05/02/2018
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 05/02/2018
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 05/02/2018
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 05/18/2018
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 05/18/2018
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 05/15/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/18/2018
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 05/17/2018
Type: Green Building Final
Result: Cancelled
Status: Issued
Date: 05/18/2018
Type: SGSOV-Seismic Gas S/O Valve
Result: Insp Scheduled
Status: Issued
Date: 05/18/2018
Type: Smoke Detectors
Result: Insp Scheduled
Status: Issued
Date: 05/18/2018
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 05/22/2018
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 05/22/2018
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 05/22/2018
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 05/21/2018
Type: Drywall Nailing
Result: Cancelled
Status: Issued
Date: 05/22/2018
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 05/22/2018
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 05/22/2018
Type: Final
Result: Corrections Issued
Status: Issued
Date: 03/23/2020
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 01/12/2018
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 01/11/2018
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 01/17/2018
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 01/23/2018
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 01/23/2018
Type: T-Bar Ceiling
Result: Not Ready for Inspection
Status: Issued
Date: 01/23/2018
Type: Light Gage Steel Frame
Result: Corrections Issued
Status: Issued
Date: 06/17/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/19/2019
Type: Drywall Nailing
Result: Corrections Issued
Status: Issued
Date: 06/21/2019
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 06/12/2018
Type: T-Bar Ceiling
Result: Not Ready for Inspection
Status: Issued
Date: 02/22/2018
Type: Special/Order Compliance
Result: Cancelled
Status: Issued
Date: 06/23/2018
Type: Light Gage Steel Frame
Result: Off-Hour Fees Due
Status: Issued
Date: 03/02/2018
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 03/02/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/02/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 06/21/2018
Type: Deputy Reinf. Concrete
Result: No Access for Inspection
Status: Issued
Date: 03/09/2018
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 03/09/2018
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 06/25/2018
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 06/28/2018
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 06/26/2018
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 03/21/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/29/2018
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/29/2018
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 03/29/2018
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/29/2018
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 03/29/2018
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 03/29/2018
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 04/04/2018
Type: T-Bar Ceiling
Result: Corrections Issued
Status: Issued
Date: 04/06/2018
Type: T-Bar Ceiling
Result: Insp Scheduled
Status: Issued
Date: 07/02/2019
Type: Reinforced Concrete Frame
Result: Cancelled
Status: Issued
Date: 07/02/2019
Type: Smoke Detectors
Result: Cancelled
Status: Issued
Date: 07/03/2019
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 07/02/2019
Type: Green Building Final
Result: Cancelled
Status: Issued
Date: 04/13/2018
Type: T-Bar Ceiling
Result: Insp Scheduled
Status: Issued
Date: 07/11/2018
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 07/13/2018
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 07/09/2018
Type: Deputy Reinf. Concrete
Result: No Access for Inspection
Status: Issued
Date: 04/13/2018
Type: T-Bar Ceiling
Result: Insp Scheduled
Status: Issued
Date: 07/16/2018
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 07/27/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 07/19/2019
Type: Smoke Detectors
Result: Insp Cancelled
Status: Issued
Date: 08/09/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/19/2019
Type: Green Building Final
Result: Insp Cancelled
Status: Issued
Date: 07/19/2019
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 07/19/2019
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 07/19/2019
Type: Final
Result: Insp Cancelled
Status: Issued
Date: 07/26/2019
Type: Drywall Nailing
Result: Insp Cancelled
Status: Issued
Date: 07/23/2019
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 07/23/2019
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 07/23/2019
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 08/20/2018
Type: Special/Order Compliance
Result: Cancelled
Status: Issued
Date: 07/23/2019
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 09/05/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/30/2019
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 08/01/2019
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 08/02/2019
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 08/01/2019
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 09/13/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/12/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 09/13/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/30/2019
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 08/01/2019
Type: Green Building Final
Result: Approved
Status: Issued
Date: 08/01/2019
Type: Reinforced Concrete Frame
Result: Approved
Status: Issued
Date: 11/15/2019
Type: T-Bar Ceiling
Result: Insp Cancelled
Status: Issued
Date: 09/29/2018
Type: Reinforced Concrete Frame
Result: Off-Hour Fees Due
Status: Issued
Date: 09/29/2018
Type: Final
Result: Off-Hour Fees Due
Status: Issued
Date: 09/29/2018
Type: Green Building Final
Result: Off-Hour Fees Due
Status: Issued
Date: 09/29/2018
Type: Smoke Detectors
Result: Off-Hour Fees Due
Status: Issued
Date: 09/29/2018
Type: SGSOV-Seismic Gas S/O Valve
Result: Off-Hour Fees Due
Status: Issued
Date: 08/09/2019
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 08/09/2019
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 10/02/2018
Type: Green Building Final
Result: Cancelled
Status: Issued
Date: 10/02/2018
Type: Final
Result: Cancelled
Status: Issued
Date: 10/03/2018
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 10/05/2018
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 10/02/2018
Type: Reinforced Concrete Frame
Result: Cancelled
Status: Issued
Date: 10/05/2018
Type: SGSOV-Seismic Gas S/O Valve
Result: Insp Scheduled
Status: Issued
Date: 10/02/2018
Type: Smoke Detectors
Result: Cancelled
Status: Issued
Date: 10/05/2018
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 10/02/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Cancelled
Status: Issued
Date: 10/05/2018
Type: Smoke Detectors
Result: Insp Scheduled
Status: Issued
Date: 10/05/2018
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 10/02/2018
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 10/09/2018
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 11/07/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/06/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/29/2019
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 08/30/2019
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 12/24/2018
Type: Light Gage Steel Frame
Result: Cancelled
Status: Issued
Date: 01/17/2019
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 01/14/2019
Type: Light Gage Steel Frame
Result: Cancelled
Status: Issued
Date: 09/09/2019
Type: Light Gage Steel Frame
Result: Corrections Issued
Status: Issued
Date: 01/22/2019
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 01/29/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 09/19/2019
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 09/20/2019
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 02/22/2019
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 03/01/2019
Type: Light Gage Steel Frame
Result: Insp Cancelled
Status: Issued
Date: 03/01/2019
Type: Drywall Nailing
Result: Insp Cancelled
Status: Issued
Date: 02/28/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/27/2019
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 03/15/2019
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 03/15/2019
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 03/15/2019
Type: Green Building Final
Result: Off-Hour Fees Due
Status: Issued
Date: 03/15/2019
Type: Green Building Final
Result: Off-Hour Fees Due
Status: Issued
Date: 03/15/2019
Type: Special/Order Compliance
Result: Off-Hour Fees Due
Status: Issued
Date: 03/15/2019
Type: Smoke Detectors
Result: Off-Hour Fees Due
Status: Issued
Date: 03/15/2019
Type: Smoke Detectors
Result: Off-Hour Fees Due
Status: Issued
Date: 03/15/2019
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 03/15/2019
Type: Smoke Detectors
Result: Insp Scheduled
Status: Issued
Date: 03/15/2019
Type: Final
Result: Off-Hour Fees Due
Status: Issued
Date: 03/15/2019
Type: Final
Result: Off-Hour Fees Due
Status: Issued
Date: 03/15/2019
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 03/15/2019
Type: Reinforced Concrete Frame
Result: Off-Hour Fees Due
Status: Issued
Date: 03/15/2019
Type: Reinforced Concrete Frame
Result: Off-Hour Fees Due
Status: Issued
Date: 12/09/2019
Type: T-Bar Ceiling
Result: Not Ready for Inspection
Status: Issued
Date: 10/01/2019
Type: Drywall Nailing
Result: Cancelled
Status: Issued
Date: 03/26/2019
Type: Reinforced Concrete Frame
Result: Cancelled
Status: Issued
Date: 03/26/2019
Type: Smoke Detectors
Result: Cancelled
Status: Issued
Date: 03/26/2019
Type: Green Building Final
Result: Cancelled
Status: Issued
Date: 03/26/2019
Type: Final
Result: Cancelled
Status: Issued
Date: 12/11/2019
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 12/10/2019
Type: Final
Result: Corrections Issued
Status: Issued
Date: 04/05/2019
Type: Green Building Final
Result: Insp Cancelled
Status: Issued
Date: 04/05/2019
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 04/05/2019
Type: Final
Result: Insp Cancelled
Status: Issued
Date: 04/05/2019
Type: Smoke Detectors
Result: Insp Cancelled
Status: Issued
Date: 04/19/2019
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 04/19/2019
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 04/19/2019
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 04/17/2019
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 04/15/2019
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 04/19/2019
Type: Smoke Detectors
Result: Insp Scheduled
Status: Issued
Date: 04/15/2019
Type: Light Gage Steel Frame
Result: Corrections Issued
Status: Issued
Date: 04/17/2019
Type: Public Counter
Result: Completed
Status: Issued
Date: 04/25/2019
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 04/25/2019
Type: Smoke Detectors
Result: Partial Inspection
Status: Issued
Date: 04/25/2019
Type: Light Gage Steel Frame
Result: Corrections Issued
Status: Issued
Date: 04/25/2019
Type: Final
Result: Partial Inspection
Status: Issued
Date: 04/25/2019
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 04/25/2019
Type: Green Building Final
Result: Partial Inspection
Status: Issued
Date: 12/16/2019
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 05/03/2019
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 05/06/2019
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 05/09/2019
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 05/16/2019
Type: Interior/Exterior Lathing
Result: Not Ready for Inspection
Status: Issued
Date: 05/17/2019
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 05/14/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/16/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/04/2020
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 01/08/2020
Type: Final
Result: Corrections Issued
Status: Issued
Date: 01/17/2020
Type: Final
Result: Cancelled
Status: Issued
Date: 01/24/2020
Type: Final
Result: Cancelled
Status: Issued
Date: 01/23/2020
Type: Final
Result: Insp Cancelled
Status: Issued
Date: 01/22/2020
Type: Light Gage Steel Frame
Result: Cancelled
Status: Issued
Date: 02/04/2020
Type: Pre-Inspection
Result: Corrections Issued
Status: Issued
Date: 05/20/2020
Type: Final
Result: No Access for Inspection
Status: Issued
Date: 01/07/2021
Type: Final
Result: Partial Inspection
Status: Issued
Date: 02/12/2020
Type: Light Gage Steel Frame
Result: Corrections Issued
Status: Issued
Date: 02/10/2020
Type: Light Gage Steel Frame
Result: Cancelled
Status: Issued
Date: 02/20/2020
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 02/27/2020
Type: TCO Electrical Verification
Result: Completed (special insp)
Status: Issued
Date: 02/27/2020
Type: TCO Heat,Vent,A/C Verification
Result: Completed (special insp)
Status: Issued
Date: 02/27/2020
Type: TCO Plumbing Verification
Result: Not Ready for Inspection
Status: Issued
Date: 02/25/2020
Type: Final
Result: Partial Inspection
Status: Issued
Date: 02/28/2020
Type: TCO Plumbing Verification
Result: Not Ready for Inspection
Status: Issued
Date: 02/27/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/28/2020
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Date: 06/01/2020
Type: Final
Result: Cancelled
Status: Issued
Date: 06/03/2020
Type: Final
Result: Partial Inspection
Status: Issued
Date: 03/05/2020
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 03/05/2020
Type: Final
Result: Partial Inspection
Status: Issued
Date: 08/13/2021
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 08/09/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/11/2020
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 03/18/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 08/11/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/30/2020
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 07/29/2020
Type: Final
Result: Insp Cancelled
Status: Issued
Date: 07/31/2020
Type: Final
Result: Partial Approval
Status: Issued
Date: 10/29/2020
Type: Special/Order Compliance
Result: Corrections Issued
Status: Issued
Date: 10/27/2020
Type: Final
Result: Partial Inspection
Status: Issued
Date: 02/03/2021
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 08/18/2021
Type: Special/Order Compliance
Result: Cancelled
Status: Issued
Date: 08/16/2021
Type: Interior/Exterior Lathing
Result: Not Ready for Inspection
Status: Issued
Date: 12/10/2020
Type: Final
Result: Partial Approval
Status: Issued
Date: 08/20/2021
Type: Final
Result: Cancelled
Status: Issued
Date: 08/23/2021
Type: Final
Result: Partial Inspection
Status: Issued
Date: 08/24/2021
Type: Structural Steel Frame
Result: Insp Cancelled
Status: Issued
Date: 08/23/2021
Type: Final
Result: Insp Cancelled
Status: Issued
Date: 03/25/2021
Type: TCO Electrical Verification
Result: Completed (special insp)
Status: Issued
Date: 03/23/2021
Type: TCO Heat,Vent,A/C Verification
Result: Completed (special insp)
Status: Issued
Date: 03/23/2021
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Date: 06/04/2021
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 09/01/2021
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 06/23/2021
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 06/23/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/25/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/25/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/25/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/30/2021
Type: Interior/Exterior Lathing
Result: Not Ready for Inspection
Status: Issued
Date: 07/02/2021
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 06/30/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/30/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/22/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 07/23/2021
Type: Drywall Nailing
Result: Insp Cancelled
Status: Issued
Date: 07/30/2021
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 07/26/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/28/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/30/2021
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 07/27/2021
Type: Light Gage Steel Frame
Result: No Access for Inspection
Status: Issued
Date: 07/28/2021
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 09/24/2021
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 09/29/2021
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 07/02/2024
Type: Electrical Verification
Result: Pending
Status: Issued
Date: 07/02/2024
Type: Plumbing Verification
Result: OK for CofO
Status: Issued
Date: 07/02/2024
Type: Special/Order Compliance
Result: No Access for Inspection
Status: Issued
Date: 07/02/2024
Type: Final
Result: No Access for Inspection
Status: Issued
Date: 07/02/2024
Type: Heat,Vent,A/C Verification
Result: OK for CofO
Status: Issued
Date: 03/06/2024
Type: Final
Result: Not Ready for Inspection
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
PRESTIGE HOMES INC

License number: 313423
Type: B
Phone: Speak with a Permit Expert
Location: CULVER CITY, CA

Permit Applicant

Principal: JONA GOLDRICH

Type:

Address: 1990 S. BUNDY DR., # 400, LOS ANGELES, CA

Phone:

Experience: years

Applicant: