Bldg-New Permit

PCIS Permit#: 15010-10000-00299

Address: 1002 CHILDS, Los Angeles, 90089

Status: CofO Issued

Status Date: 02/24/2020

Tract: TR 29395

Property Identifier: Block: , Lot: 2, Zone: USC-1A

Assessor Information: Book: 5039, Page: 2, Parcel: 29

Census Tract: 2227

Work Description

NEW OFFICE/RESEARCH AND LABRATORY BUILDING. 4-STORIES WITH BASEMENT.

Inspection Activity
Date: 07/20/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/22/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 07/21/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 07/19/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/21/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 07/22/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 07/22/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/21/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/25/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 07/28/2016
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 07/27/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/27/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 07/26/2016
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 07/27/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 07/25/2016
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 07/28/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/28/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/28/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 07/29/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/26/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 07/28/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 07/26/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 07/25/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 07/27/2016
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 08/04/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/04/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/03/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/03/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/03/2016
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 08/05/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/02/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/04/2016
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 08/09/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 08/10/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 08/09/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/11/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 08/08/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 08/10/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/10/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/11/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/07/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 02/09/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/07/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/08/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 02/08/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/10/2017
Type: Deputy Fireproofing
Result: Insp Scheduled
Status: Issued
Date: 02/09/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 02/07/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 02/10/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 02/10/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 02/08/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 02/09/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 02/15/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/15/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/15/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/15/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/17/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 02/17/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 02/17/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 02/17/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 02/15/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/15/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/15/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/15/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/17/2017
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 02/17/2017
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 02/17/2017
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 02/17/2017
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 02/13/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/13/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/13/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/13/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 02/17/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 02/17/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 02/16/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/17/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 02/17/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 02/16/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/16/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/16/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/17/2017
Type: Deputy Fireproofing
Result: Insp Scheduled
Status: Issued
Date: 02/17/2017
Type: Deputy Fireproofing
Result: Insp Scheduled
Status: Issued
Date: 02/17/2017
Type: Deputy Fireproofing
Result: Insp Scheduled
Status: Issued
Date: 02/17/2017
Type: Deputy Fireproofing
Result: Insp Scheduled
Status: Issued
Date: 02/17/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/17/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/17/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/17/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/16/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/16/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/16/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/16/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/15/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 02/15/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 02/15/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 02/15/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 02/13/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 02/13/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 02/13/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 02/13/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 02/13/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 02/13/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 02/13/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 02/13/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 02/13/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/13/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/13/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/13/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 02/13/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/13/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/13/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/13/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/15/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/15/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/15/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/15/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/16/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/16/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/16/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/16/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/15/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 02/15/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 02/15/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 02/15/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 02/13/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/13/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/13/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/13/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/14/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/13/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 02/13/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 02/13/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 02/13/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 02/16/2017
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 02/16/2017
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 02/16/2017
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 02/16/2017
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 04/06/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 04/06/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 04/04/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 04/05/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/07/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/07/2017
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 04/05/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 04/05/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 04/04/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 04/07/2017
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 04/07/2017
Type: Deputy Steel/Welding
Result: Insp Cancelled
Status: Issued
Date: 04/06/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 04/05/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 04/07/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/07/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 02/08/2016
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 02/16/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/10/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/17/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 03/17/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 09/24/2015
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 10/02/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/21/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/23/2015
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 11/23/2015
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 12/08/2015
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 01/15/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/11/2016
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 01/05/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 01/05/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 12/01/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/16/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 12/07/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 03/03/2016
Type: Pre-Inspection
Result: Insp Cancelled
Status: Issued
Date: 10/26/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 01/12/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/06/2015
Type: METHANE-Barrier
Result: Partial Approval
Status: Issued
Date: 10/20/2015
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 03/16/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/17/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/17/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 01/12/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 01/20/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/20/2015
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 12/09/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/02/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 09/30/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 09/24/2015
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 12/07/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/04/2015
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 12/24/2015
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 10/23/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 12/02/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/30/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 11/30/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 11/03/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/03/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 12/04/2015
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 01/25/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/14/2015
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 01/19/2016
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 02/05/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/08/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/13/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/14/2015
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 11/20/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 03/25/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/22/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 01/04/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 01/04/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 09/24/2015
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 11/09/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 12/31/2015
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 12/01/2015
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 03/29/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/20/2015
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 02/12/2016
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 03/23/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 03/23/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/16/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/14/2015
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 10/29/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 11/30/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/19/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 12/21/2015
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 03/18/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/18/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/10/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 01/04/2016
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 12/03/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/27/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 03/02/2016
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 01/28/2016
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 11/19/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/05/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/05/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 03/22/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/02/2015
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 11/18/2015
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 11/20/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 11/20/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 02/26/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/18/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 10/01/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 03/07/2016
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 10/06/2015
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 10/06/2015
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 03/08/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 12/09/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 12/23/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/09/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 12/31/2015
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 11/04/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 01/26/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/11/2016
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 11/18/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/09/2016
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 01/13/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 12/11/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/11/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/09/2015
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 12/23/2015
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 10/28/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 01/06/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 01/07/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 10/27/2015
Type: METHANE-Barrier
Result: Partial Approval
Status: Issued
Date: 01/05/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 10/15/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/28/2015
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 02/29/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 12/31/2015
Type: METHANE-Subgrade
Result: Insp Scheduled
Status: Issued
Date: 12/04/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/06/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 03/30/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 03/02/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/01/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/02/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/02/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 02/10/2016
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 01/04/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 10/08/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/13/2016
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 10/30/2015
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 02/22/2016
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 10/13/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/30/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/06/2015
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 03/01/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/23/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/23/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/23/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 12/21/2015
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 12/22/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/28/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 01/14/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 12/29/2015
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 10/30/2015
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 02/11/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 12/22/2015
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 11/12/2015
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 10/21/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 01/22/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/27/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 11/17/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 12/04/2015
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 01/11/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/22/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/24/2015
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 10/30/2015
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 12/21/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 12/24/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/08/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 02/24/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 01/29/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/12/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/23/2015
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/06/2015
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 01/11/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 11/19/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 10/05/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 03/21/2016
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 11/20/2015
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 11/25/2015
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/22/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 10/28/2015
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 12/21/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/01/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/05/2015
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 01/14/2016
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 10/23/2015
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 01/14/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 02/18/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/26/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 10/09/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 12/03/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 10/07/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/16/2015
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 12/01/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 03/04/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/04/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/04/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/09/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/03/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/19/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 01/15/2016
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 03/09/2016
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 12/24/2015
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 11/19/2015
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 11/25/2015
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/23/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 10/27/2015
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 01/15/2016
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/06/2015
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 11/20/2015
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 10/27/2015
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 02/04/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/28/2015
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 01/07/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 12/08/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/02/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 03/03/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/27/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/29/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/03/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 03/15/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 01/19/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/06/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 03/24/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/24/2015
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 10/20/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 03/17/2016
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 01/08/2016
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 11/05/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 12/11/2015
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 12/10/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 12/10/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 12/10/2015
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 03/14/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 03/31/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 01/28/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/27/2015
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 11/04/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/04/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/25/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/14/2015
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/06/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/06/2015
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/05/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/05/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/08/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/06/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/04/2016
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 04/07/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/27/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/15/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/15/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/11/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/12/2016
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/12/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/14/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/14/2016
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 04/14/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/13/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/13/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/18/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/19/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/22/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/20/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/21/2016
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 04/21/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/28/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/29/2016
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/29/2016
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/27/2016
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/25/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/29/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/26/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/28/2016
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/28/2016
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/06/2016
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 05/06/2016
Type: METHANE-Subgrade
Result: Insp Scheduled
Status: Issued
Date: 05/03/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/05/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/06/2016
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 05/06/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/02/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/04/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/06/2016
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 05/13/2016
Type: Deputy Reinf. Concrete
Result: No Access for Inspection
Status: Issued
Date: 05/11/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/10/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/10/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/10/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/09/2016
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/12/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/17/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/18/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/20/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/19/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/16/2016
Type: Grading Pre-Inspection
Result: Insp Cancelled
Status: Issued
Date: 05/24/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/24/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/25/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/23/2016
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/26/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/03/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/02/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/02/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/01/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/01/2016
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 06/08/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/09/2016
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/09/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/09/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/09/2016
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/10/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/07/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/16/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/17/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/13/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 06/14/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/15/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/27/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/28/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/28/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/24/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/24/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/23/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/29/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/28/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/30/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/30/2016
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 07/01/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/01/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/29/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/07/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/06/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/08/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/08/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/08/2016
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 07/14/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/14/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/11/2016
Type: Reinforced Concrete Frame
Result: Order to Comply Issued
Status: Issued
Date: 07/13/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/15/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/12/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/12/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/12/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/11/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/27/2016
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/24/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 10/27/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/27/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/25/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/24/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 10/24/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/28/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/27/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/27/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 10/27/2016
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/24/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 10/27/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/27/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/25/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/24/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 10/24/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/27/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 10/27/2016
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/24/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 10/27/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/27/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/25/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/24/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 10/24/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/27/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/28/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/27/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 11/01/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/02/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 11/03/2016
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/03/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 11/01/2016
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 11/01/2016
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/01/2016
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/31/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/31/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/01/2016
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 11/04/2016
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 11/04/2016
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 11/04/2016
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 11/03/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 11/02/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/02/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 11/04/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/04/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/31/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 10/31/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 11/01/2016
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 11/03/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/04/2016
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 11/01/2016
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 11/03/2016
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/08/2016
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/08/2016
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/08/2016
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/07/2016
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 11/09/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 11/09/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 11/10/2016
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 11/08/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/08/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/07/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/07/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/10/2016
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 11/10/2016
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 11/10/2016
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 11/09/2016
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 11/10/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/09/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/07/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 11/10/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/09/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/07/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 11/09/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 11/07/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 11/08/2016
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/17/2016
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 11/14/2016
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 11/14/2016
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/14/2016
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 11/14/2016
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 11/22/2016
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/21/2016
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/02/2016
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 12/02/2016
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 12/01/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 11/30/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 11/29/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 11/30/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 11/29/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/01/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/01/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/02/2016
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 12/05/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/05/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/08/2016
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/07/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/05/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 12/06/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/16/2016
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 12/23/2016
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 12/22/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 12/23/2016
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 12/22/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/30/2016
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 12/29/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 12/28/2016
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 12/28/2016
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/28/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/29/2016
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/30/2016
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/14/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/14/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/14/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/13/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 04/11/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 04/10/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 04/12/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 04/19/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 04/20/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/18/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 04/19/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 04/17/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 04/17/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 04/18/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 04/25/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 04/26/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 04/27/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/27/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 04/27/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 04/28/2017
Type: Deputy Fireproofing
Result: Insp Scheduled
Status: Issued
Date: 04/26/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 04/27/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 04/25/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 04/25/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 04/26/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 04/28/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/28/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 05/04/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 05/01/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 05/01/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 05/01/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/02/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 05/03/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 05/03/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 05/03/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 05/04/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/04/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 05/04/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/04/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 05/02/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/05/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/05/2017
Type: Deputy Fireproofing
Result: Insp Scheduled
Status: Issued
Date: 05/05/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/02/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 05/03/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/01/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 05/02/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 05/05/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 05/12/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/09/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 05/08/2017
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 05/11/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 05/11/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 05/10/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 05/08/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 05/12/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 05/08/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 05/09/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 05/10/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 05/24/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/18/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/19/2017
Type: T-Bar Ceiling
Result: Insp Scheduled
Status: Issued
Date: 05/18/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/25/2017
Type: T-Bar Ceiling
Result: Not Ready for Inspection
Status: Issued
Date: 05/26/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 05/23/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 05/25/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 05/22/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 05/24/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 05/24/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 05/23/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 05/22/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 05/26/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/26/2017
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 05/25/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 06/01/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/02/2017
Type: Deputy Reinf. Masonry
Result: Insp Cancelled
Status: Issued
Date: 06/01/2017
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 05/30/2017
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 05/31/2017
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 06/08/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/07/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 06/05/2017
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 06/06/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 06/09/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 06/06/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 06/07/2017
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 06/07/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/09/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/05/2017
Type: T-Bar Ceiling
Result: Insp Cancelled
Status: Issued
Date: 06/08/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/13/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/13/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 06/12/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 06/13/2017
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 06/14/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 06/12/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 06/12/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 06/12/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/13/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 06/15/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 06/15/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 06/16/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/16/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/14/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 06/16/2017
Type: Deputy Fireproofing
Result: Insp Scheduled
Status: Issued
Date: 06/13/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 06/16/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 06/14/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 06/14/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/15/2017
Type: Deputy Fireproofing
Result: Partial Approval
Status: Issued
Date: 06/26/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 06/28/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 06/29/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/29/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 06/28/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/30/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/27/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/30/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 06/30/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/28/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 06/27/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 06/26/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/26/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 06/27/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 06/29/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 10/03/2017
Type: TCO Elevator Verification
Result: Completed (special insp)
Status: Issued
Date: 10/06/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/05/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 10/03/2017
Type: TCO Heat,Vent,A/C Verification
Result: Completed (special insp)
Status: Issued
Date: 10/03/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 10/04/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 10/02/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 10/03/2017
Type: Elevator Verification
Result: OK for CofO
Status: Issued
Date: 10/11/2017
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 10/17/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/17/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 10/18/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/20/2017
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 10/19/2017
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 10/18/2017
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 01/08/2018
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 03/08/2018
Type: TCO Heat,Vent,A/C Verification
Result: Completed (special insp)
Status: Issued
Date: 03/08/2018
Type: TCO Grading Verification
Result: Completed (special insp)
Status: Issued
Date: 03/08/2018
Type: TCO Electrical Verification
Result: Completed (special insp)
Status: Issued
Date: 03/07/2018
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 03/08/2018
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Date: 03/08/2018
Type: TCO Sprinkler Verification
Result: Completed (special insp)
Status: Issued
Date: 03/23/2018
Type: Grading Verification
Result: OK for CofO
Status: Issued
Date: 03/23/2018
Type: Plumbing Verification
Result: Insp Scheduled
Status: Issued
Date: 03/23/2018
Type: Heat,Vent,A/C Verification
Result: Insp Scheduled
Status: Issued
Date: 03/29/2018
Type: Heat,Vent,A/C Verification
Result: CofO on Hold
Status: Issued
Date: 03/27/2018
Type: Electrical Verification
Result: CofO on Hold
Status: Issued
Date: 09/05/2018
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 09/11/2019
Type: TCO Electrical Verification
Result: Completed (special insp)
Status: Issued
Date: 09/09/2019
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 09/11/2019
Type: TCO Heat,Vent,A/C Verification
Result: Completed (special insp)
Status: Issued
Date: 02/26/2019
Type: Verify Sprinkler Sign Off
Result: Cancelled
Status: Issued
Date: 02/26/2019
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 12/11/2019
Type: Heat,Vent,A/C Verification
Result: OK for CofO
Status: Issued
Date: 03/20/2019
Type: TCO Electrical Verification
Result: Completed (special insp)
Status: Issued
Date: 03/20/2019
Type: TCO Heat,Vent,A/C Verification
Result: Completed (special insp)
Status: Issued
Date: 02/24/2020
Type: Verify Sprinkler Sign Off
Result: Approved
Status: CofO Issued
Date: 02/24/2020
Type: Green Building Rough
Result: Approved
Status: CofO Issued
Date: 02/24/2020
Type: Reinforced Concrete Frame
Result: Approved
Status: CofO Issued
Date: 02/24/2020
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 02/24/2020
Type: Drywall Nailing
Result: Approved
Status: CofO Issued
Date: 02/24/2020
Type: METHANE-Barrier
Result: Approved
Status: CofO Issued
Date: 02/24/2020
Type: Green Building Final
Result: Approved
Status: CofO Issued
Date: 02/24/2020
Type: METHANE-Subgrade
Result: Approved
Status: CofO Issued
Date: 02/24/2020
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 02/24/2020
Type: Final
Result: OK to Issue CofO
Status: CofO Issued
Date: 02/24/2020
Type: METHANE-Rough
Result: Approved
Status: CofO Issued
Date: 02/24/2020
Type: Footing/Foundation/Slab
Result: Approved
Status: CofO Issued
Date: 02/24/2020
Type: METHANE-Final
Result: Approved
Status: CofO Issued
Date: 02/24/2020
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: CofO Issued
Date: 02/24/2020
Type: CofO Issuance
Result: CofO in Progress
Status: CofO Issued
Date: 02/24/2020
Type: Smoke Detectors
Result: Approved
Status: CofO Issued
Date: 02/24/2020
Type: Special/Order Compliance
Result: Approved
Status: CofO Issued
Date: 02/24/2020
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
D P R CONSTRUCTION A GENERAL PARTNERSHIP

License number: 953749
Type: B
Phone: Speak with a Permit Expert
Location: REDWOOD CITY, CA

Permit Applicant

Principal: JO ALYSON QUINTON
Type:
Address: 533 S FREMONT AVE #803, LA, CA
Phone:
Experience: years
Applicant: BRUCE MILLER & ASSOC