Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

36 UNIT MULTI FAMILY APARTMENT BUILDING OVER 1,000 SF OF GROUND FLOOR

Inspection Activity
Date: 08/01/2016
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 08/03/2016
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 08/02/2016
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/02/2016
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/03/2016
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 08/03/2016
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 08/01/2016
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 08/01/2016
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 08/11/2016
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 08/12/2016
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 08/10/2016
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 08/11/2016
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 08/09/2016
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 08/12/2016
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 08/11/2016
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 08/12/2016
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 08/11/2016
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 08/11/2016
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 02/16/2017
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 02/16/2017
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 02/16/2017
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 02/16/2017
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 02/16/2017
Type: METHANE-Rough
Result: Approved
Status: Issued
Date: 02/16/2017
Type: METHANE-Rough
Result: Approved
Status: Issued
Date: 02/16/2017
Type: METHANE-Rough
Result: Approved
Status: Issued
Date: 02/16/2017
Type: METHANE-Rough
Result: Approved
Status: Issued
Date: 02/16/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 02/16/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 02/16/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 02/16/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 02/16/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/16/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/16/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/16/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/16/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 02/16/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 02/16/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 02/16/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 04/03/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 04/04/2017
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 04/04/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/31/2016
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 10/27/2016
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 10/24/2016
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 10/27/2016
Type: Reinforced Concrete Frame
Result: Conditional Approval
Status: Issued
Date: 10/27/2016
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 10/28/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/28/2016
Type: Structural Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 10/27/2016
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 10/27/2016
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 10/24/2016
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 10/27/2016
Type: Reinforced Concrete Frame
Result: Conditional Approval
Status: Issued
Date: 10/27/2016
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 10/28/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/28/2016
Type: Structural Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 10/27/2016
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 10/27/2016
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 10/24/2016
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 10/27/2016
Type: Reinforced Concrete Frame
Result: Conditional Approval
Status: Issued
Date: 10/27/2016
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 10/28/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/28/2016
Type: Structural Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 10/27/2016
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 11/02/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 11/01/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 11/04/2016
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 11/03/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 11/09/2016
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/09/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 11/07/2016
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 11/07/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 11/07/2016
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 11/07/2016
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 11/08/2016
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 11/08/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 11/07/2016
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 11/10/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/07/2016
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 11/10/2016
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 11/17/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 11/16/2016
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 11/15/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 11/16/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 11/22/2016
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 11/23/2016
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 11/23/2016
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 11/22/2016
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 11/23/2016
Type: METHANE-Rough
Result: Insp Scheduled
Status: Issued
Date: 11/23/2016
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 11/22/2016
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 11/28/2016
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/29/2016
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 11/29/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 11/30/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 12/07/2016
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 12/07/2016
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 12/07/2016
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/07/2016
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 12/07/2016
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 12/16/2016
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 12/16/2016
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 12/16/2016
Type: METHANE-Rough
Result: Insp Scheduled
Status: Issued
Date: 12/16/2016
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 12/23/2016
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 12/20/2016
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 12/20/2016
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 12/23/2016
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 12/22/2016
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 12/20/2016
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 12/23/2016
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 12/20/2016
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 12/23/2016
Type: METHANE-Rough
Result: Insp Scheduled
Status: Issued
Date: 12/27/2016
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 12/29/2016
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/29/2016
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/27/2016
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/11/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Conditional Approval
Status: Issued
Date: 04/19/2017
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 04/18/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 04/20/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 04/19/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 04/19/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 04/19/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 04/19/2017
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 04/24/2017
Type: Special/Order Compliance
Result: Corrections Issued
Status: Issued
Date: 05/11/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/16/2017
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 05/17/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Conditional Approval
Status: Issued
Date: 05/17/2017
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/19/2017
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 05/17/2017
Type: Verify Sprinkler Sign Off
Result: Conditional Approval
Status: Issued
Date: 05/23/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 05/25/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Corrections Issued
Status: Issued
Date: 05/23/2017
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 05/23/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 05/25/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 06/02/2017
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 06/02/2017
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 06/12/2017
Type: Special/Order Compliance
Result: Cancelled
Status: Issued
Date: 10/02/2017
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 10/02/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/06/2017
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 10/02/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 10/13/2017
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 10/11/2017
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 10/11/2017
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 10/10/2017
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 10/18/2017
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 10/18/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/18/2017
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 10/27/2017
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 10/27/2017
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 10/27/2017
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 11/09/2017
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 11/06/2017
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 11/09/2017
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 11/06/2017
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 11/06/2017
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 11/17/2017
Type: T-Bar Ceiling
Result: Insp Scheduled
Status: Issued
Date: 11/16/2017
Type: T-Bar Ceiling
Result: Not Ready for Inspection
Status: Issued
Date: 05/02/2018
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 04/30/2018
Type: Posting Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 11/21/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/30/2018
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 05/01/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/28/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/28/2017
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 05/17/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/21/2018
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 05/24/2018
Type: Grading Verification
Result: CofO on Hold
Status: Issued
Date: 05/25/2018
Type: Plumbing Verification
Result: Insp Scheduled
Status: Issued
Date: 05/24/2018
Type: Electrical Verification
Result: CofO on Hold
Status: Issued
Date: 05/24/2018
Type: Heat,Vent,A/C Verification
Result: CofO on Hold
Status: Issued
Date: 05/23/2018
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 05/24/2018
Type: Fire Sprinkler Verification
Result: CofO on Hold
Status: Issued
Date: 05/24/2018
Type: Elevator Verification
Result: CofO on Hold
Status: Issued
Date: 05/29/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/26/2018
Type: T-Bar Ceiling
Result: Insp Scheduled
Status: Issued
Date: 06/04/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/02/2018
Type: T-Bar Ceiling
Result: Insp Scheduled
Status: Issued
Date: 02/16/2018
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 06/28/2018
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 03/20/2018
Type: Masonry Wall/Backfill
Result: Partial Inspection
Status: Issued
Date: 03/23/2018
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 03/23/2018
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 03/20/2018
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 04/11/2018
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/11/2018
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/16/2018
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 11/09/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 01/09/2019
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 01/25/2019
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 01/25/2019
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 01/24/2019
Type: Heat,Vent,A/C Verification
Result: OK for CofO
Status: Issued
Date: 01/25/2019
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 01/25/2019
Type: Electrical Verification
Result: OK for CofO
Status: Issued
Date: 01/25/2019
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 01/23/2019
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 01/24/2019
Type: Pressure Vessel Verification
Result: OK for CofO
Status: Issued
Date: 01/23/2019
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 01/25/2019
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 01/23/2019
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 01/23/2019
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 01/23/2019
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 01/24/2019
Type: Plumbing Verification
Result: OK for CofO
Status: Issued
Date: 01/25/2019
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 01/24/2019
Type: Fire Sprinkler Verification
Result: OK for CofO
Status: Issued
Date: 01/25/2019
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 01/23/2019
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 01/23/2019
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 01/25/2019
Type: Smoke Detectors
Result: Insp Scheduled
Status: Issued
Date: 01/24/2019
Type: Elevator Verification
Result: OK for CofO
Status: Issued
Date: 01/23/2019
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 01/25/2019
Type: SGSOV-Seismic Gas S/O Valve
Result: Insp Scheduled
Status: Issued
Date: 01/23/2019
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 01/30/2019
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 01/30/2019
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 01/30/2019
Type: Final
Result: Partial Inspection
Status: Issued
Date: 01/30/2019
Type: Reinforced Concrete Frame
Result: Approved
Status: Issued
Date: 01/30/2019
Type: Green Building Final
Result: Partial Approval
Status: Issued
Date: 02/01/2019
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 01/30/2019
Type: Wood Frame
Result: Approved
Status: Issued
Date: 02/01/2019
Type: SGSOV-Seismic Gas S/O Valve
Result: Insp Scheduled
Status: Issued
Date: 01/30/2019
Type: Smoke Detectors
Result: Partial Approval
Status: Issued
Date: 01/30/2019
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 02/01/2019
Type: Smoke Detectors
Result: Insp Scheduled
Status: Issued
Date: 01/30/2019
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 02/01/2019
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 02/04/2019
Type: Final
Result: OK to Issue CofO
Status: CofO Issued
Date: 02/04/2019
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 02/04/2019
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 02/04/2019
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 02/04/2019
Type: CofO Issuance
Result: CofO in Progress
Status: CofO Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
HY-MAX BUILDING CORP

License number: 702339
Type: B
Phone: Speak with a Permit Expert
Location: VALENCIA, CA

Permit Applicant

Principal: MICHAEL DAVID BLAHA

Type:

Address: 1535 6TH ST, 101, SANTA MONICA, CA

Phone:

Experience: years

Applicant: CESAR VERGARA