Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

PHASE 4B ( SOUTH TOWER) 45 STORY TYPE I-A , 125 APARTMENT UNITS.

Inspection Activity
Date: 05/29/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 05/28/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 03/23/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 10/21/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 06/14/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 06/14/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 06/14/2019
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/13/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/13/2019
Type: Deputy Fireproofing
Result: Approved
Status: Issued
Date: 06/14/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 06/14/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/13/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 06/14/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/13/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 06/13/2019
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 06/14/2019
Type: Deputy Fireproofing
Result: Insp Scheduled
Status: Issued
Date: 06/13/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/12/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 06/13/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 06/13/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 06/14/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 03/25/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/19/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 06/17/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 06/18/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 06/19/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 06/19/2019
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 06/19/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 06/18/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/19/2019
Type: Deputy Fireproofing
Result: Approved
Status: Issued
Date: 06/21/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 06/17/2019
Type: Deputy Fireproofing
Result: Approved
Status: Issued
Date: 06/17/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 06/17/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 06/18/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 06/19/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/17/2019
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 06/17/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/19/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 06/19/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/17/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 06/18/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 06/18/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/18/2019
Type: Deputy Fireproofing
Result: Approved
Status: Issued
Date: 06/18/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 06/18/2019
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 06/17/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/20/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 10/28/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 11/01/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/01/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 10/28/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 10/29/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/14/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 06/14/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 06/14/2019
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/13/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/13/2019
Type: Deputy Fireproofing
Result: Approved
Status: Issued
Date: 06/14/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 06/14/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/13/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 06/14/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/13/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 06/13/2019
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 06/14/2019
Type: Deputy Fireproofing
Result: Insp Scheduled
Status: Issued
Date: 06/13/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/12/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 06/13/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 06/13/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 06/14/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 10/31/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 10/30/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 07/03/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 07/01/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 07/02/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 03/31/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 11/05/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 07/09/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 07/11/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 07/10/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 07/12/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 07/08/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 08/15/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 08/13/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 08/15/2019
Type: Deputy Grading
Result: Approved
Status: Issued
Date: 08/13/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 08/16/2019
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 08/13/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 08/16/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/14/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 08/14/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 08/13/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/15/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 08/15/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/12/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 08/16/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 08/16/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 08/14/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/16/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 07/16/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 07/17/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 07/19/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 07/15/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 11/04/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 11/06/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 07/26/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 07/24/2019
Type: Deputy Grading
Result: Approved
Status: Issued
Date: 07/25/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 07/23/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 07/26/2019
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 07/24/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 07/26/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 07/23/2019
Type: Deputy Grading
Result: Approved
Status: Issued
Date: 07/23/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 07/22/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 07/23/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 07/26/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 07/25/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 07/25/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 07/24/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 07/25/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 07/23/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 07/24/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 07/25/2019
Type: Deputy Grading
Result: Approved
Status: Issued
Date: 07/26/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/24/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 08/01/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 07/31/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 08/02/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 07/29/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 07/29/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 07/29/2019
Type: Deputy Grading
Result: Approved
Status: Issued
Date: 07/30/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 07/29/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/14/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 11/13/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 11/15/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 08/13/2019
Type: Deputy Grading
Result: Approved
Status: Issued
Date: 08/14/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 08/14/2019
Type: Deputy Grading
Result: Approved
Status: Issued
Date: 08/15/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 08/19/2019
Type: Deputy Grading
Result: Approved
Status: Issued
Date: 08/19/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 08/20/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 08/19/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 08/19/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/21/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 08/22/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 11/22/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/18/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 11/22/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 11/18/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/19/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 11/19/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/30/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 08/30/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 08/26/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 08/28/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 08/29/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 08/28/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 08/29/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 08/29/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 08/27/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 08/28/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 08/27/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 08/27/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 11/20/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/21/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 09/03/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 09/03/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 09/06/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 09/03/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 11/25/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/25/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 11/26/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 09/13/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 09/11/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 09/10/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 09/12/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 09/13/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 09/10/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 09/13/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 09/12/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 09/10/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 09/09/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 09/12/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 09/11/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 09/11/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/17/2020
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 09/20/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 09/18/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 09/16/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 09/20/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 09/18/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 09/19/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 09/19/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 09/20/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 09/16/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 09/17/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 09/19/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 09/16/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 09/17/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 09/17/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 09/18/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 12/03/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 12/04/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 12/05/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 09/27/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 09/23/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 09/26/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 09/26/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 09/24/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 09/25/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 09/25/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 09/24/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 09/27/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/24/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 09/26/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 09/27/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 09/25/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 09/30/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 09/30/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 10/04/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 10/02/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 10/03/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 10/01/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 12/09/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 12/13/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 12/10/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 12/11/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 12/12/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 10/07/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 10/08/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 10/11/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 10/09/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 12/30/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 12/29/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 10/18/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 10/16/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 10/17/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 04/19/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 10/15/2019
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 04/26/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 04/22/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 04/23/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 04/25/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 04/24/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 12/20/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 12/18/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 12/19/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 04/29/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 04/30/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 05/01/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 05/02/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 04/29/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 05/07/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 05/10/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 05/07/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/08/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/08/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 05/10/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/08/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 05/09/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/07/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 05/06/2019
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 05/09/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 05/09/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 05/07/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 05/08/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 05/09/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 05/10/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 05/10/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 12/24/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 12/27/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 12/23/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 05/17/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/13/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 05/17/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/16/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 05/15/2019
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 05/16/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 05/16/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 05/13/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 05/15/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 05/14/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 05/13/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/15/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 05/14/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 05/17/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 05/15/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 05/13/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 05/17/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 05/15/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 05/15/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/16/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 05/17/2019
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/16/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 05/15/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/14/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/17/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/14/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 05/15/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 05/16/2019
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 05/17/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/15/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 05/16/2019
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 05/17/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 05/16/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/16/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/03/2020
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 01/02/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 12/30/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 12/31/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 05/21/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 05/21/2019
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 05/24/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 05/23/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 05/20/2019
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 05/21/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 05/21/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 05/22/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 05/20/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 05/21/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/20/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 05/20/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 05/20/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 05/21/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 05/20/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/07/2020
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/06/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 01/07/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 01/09/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 01/08/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 01/10/2020
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 01/17/2020
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 01/16/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 01/17/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/14/2020
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/16/2020
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/13/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 01/15/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 01/15/2020
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/14/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 01/21/2020
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/24/2020
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 01/21/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 01/23/2020
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 01/22/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 01/28/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 01/27/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 01/29/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 05/22/2020
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 05/18/2020
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 02/06/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 05/22/2020
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 02/10/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 02/13/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/14/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/11/2020
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/12/2020
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/10/2020
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/26/2020
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 05/29/2020
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 02/18/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 05/29/2020
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 01/07/2021
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 09/17/2020
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 02/28/2020
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 02/24/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 03/05/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 03/04/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 03/06/2020
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 03/03/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/13/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/10/2020
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/10/2020
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 03/11/2020
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/12/2020
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/11/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 03/16/2020
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/16/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 03/19/2020
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 06/15/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/18/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/17/2020
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 09/24/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 06/23/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/25/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/24/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/09/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/08/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/07/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 09/24/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 07/16/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/15/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/01/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 07/30/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/30/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/29/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/29/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/22/2021
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 08/03/2020
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 10/06/2020
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/05/2020
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/09/2020
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/08/2020
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/07/2020
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/14/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 10/15/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 10/19/2020
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/23/2020
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/20/2020
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/21/2020
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/22/2020
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 05/04/2021
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 10/29/2020
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/26/2020
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/27/2020
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/28/2020
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/30/2020
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 11/19/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 12/14/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 03/03/2021
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 03/19/2021
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 04/08/2021
Type: Pre-Inspection
Result: Cancelled
Status: Issued
Date: 04/09/2021
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 04/07/2021
Type: Pre-Inspection
Result: Cancelled
Status: Issued
Date: 04/14/2021
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 04/12/2021
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 09/07/2021
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 12/16/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/17/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/25/2021
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 03/17/2022
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 03/25/2022
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 02/01/2022
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 04/04/2022
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 04/13/2022
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 04/14/2022
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 04/15/2022
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 09/13/2022
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 03/15/2023
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 03/15/2023
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 09/25/2023
Type: Heat,Vent,A/C Verification
Result: OK for CofO
Status: Issued
Date: 09/25/2023
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 10/03/2023
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 10/17/2023
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 10/23/2023
Type: Final
Result: OK to Issue CofO
Status: CofO in Progress
Date: 10/23/2023
Type: CofO Issuance
Result: CofO in Progress
Status: CofO in Progress
Date: 06/30/2023
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 08/01/2023
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 08/01/2023
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 08/01/2023
Type: METHANE-Subgrade
Result: Approved
Status: Issued
Date: 08/01/2023
Type: Reinforced Concrete Frame
Result: Approved
Status: Issued
Date: 08/01/2023
Type: METHANE-Barrier
Result: Approved
Status: Issued
Date: 08/01/2023
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: Issued
Date: 08/01/2023
Type: Green Building Final
Result: Approved
Status: Issued
Date: 08/01/2023
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 08/01/2023
Type: METHANE-Rough
Result: Approved
Status: Issued
Date: 08/01/2023
Type: SUSMP-Std. Urban Storm Water
Result: Approved
Status: Issued
Date: 08/01/2023
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 08/01/2023
Type: METHANE-Final
Result: Approved
Status: Issued
Date: 08/01/2023
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 11/29/2023
Type: Pre-Inspection
Result: No Access for Inspection
Status: CofO in Progress
Date: 09/06/2023
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 09/22/2023
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 01/12/2024
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 01/12/2024
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 01/12/2024
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
WEBCOR CONSTRUCTION L P

License number: 899242
Type: B
Phone: Speak with a Permit Expert
Location: ALAMEDA, CA

Permit Applicant

Principal: ANTHONY DAVID RANGO

Type:

Address:

Phone:

Experience: years

Applicant: YOUNG LEE