Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

Proposed 4-tiered Parking Garage with 2 1/2 subterranean tiers

Inspection Activity
Date: 05/31/2019
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 10/23/2019
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/21/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 10/24/2019
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 10/24/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 10/21/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 10/24/2019
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 10/21/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 06/12/2019
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 06/13/2019
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 06/12/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/14/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 06/11/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 10/24/2019
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 10/24/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 03/23/2020
Type: AIM Verification
Result: Not Applicable
Status: Issued
Date: 06/21/2019
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 06/21/2019
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 06/18/2019
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 06/18/2019
Type: Pre-Inspection
Result: Insp Cancelled
Status: Issued
Date: 06/18/2019
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 11/02/2019
Type: Pre-Inspection
Result: Off-Hour Fees Due
Status: Issued
Date: 11/02/2019
Type: Pre-Inspection
Result: Off-Hour Fees Due
Status: Issued
Date: 10/31/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 11/02/2019
Type: Pre-Inspection
Result: Off-Hour Fees Due
Status: Issued
Date: 06/12/2019
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 06/13/2019
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 06/12/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/14/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 06/11/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 11/02/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 11/02/2019
Type: Pre-Inspection
Result: Off-Hour Fees Due
Status: Issued
Date: 11/02/2019
Type: Pre-Inspection
Result: Off-Hour Fees Due
Status: Issued
Date: 11/02/2019
Type: Pre-Inspection
Result: Off-Hour Fees Due
Status: Issued
Date: 07/01/2019
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 07/05/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/02/2019
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 07/05/2019
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/05/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 07/01/2019
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 07/01/2019
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 07/01/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 07/03/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/03/2019
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/02/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/02/2020
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 04/02/2020
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 04/02/2020
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 04/02/2020
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 04/02/2020
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 04/02/2020
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV No Gas
Status: Issued
Date: 04/02/2020
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 04/03/2020
Type: Pre-Inspection
Result: Insp Cancelled
Status: Issued
Date: 07/12/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/11/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 07/11/2019
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 07/12/2019
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 07/11/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 07/11/2019
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 07/10/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 08/12/2019
Type: Pre-Inspection
Result: Cancelled
Status: Issued
Date: 08/13/2019
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 07/30/2018
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 07/30/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 08/15/2019
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 08/16/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 07/15/2019
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 07/18/2019
Type: Interior/Exterior Lathing
Result: Not Ready for Inspection
Status: Issued
Date: 07/16/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/16/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/15/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Conditional Approval
Status: Issued
Date: 07/15/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 07/19/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 07/15/2019
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 07/16/2019
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/04/2019
Type: Pre-Inspection
Result: Cancelled
Status: Issued
Date: 11/08/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 11/06/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 11/08/2019
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 07/22/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/27/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 07/23/2019
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 07/26/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 04/02/2020
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 04/02/2020
Type: Reinforced Concrete Frame
Result: Approved
Status: Issued
Date: 04/06/2020
Type: TCO Heat,Vent,A/C Verification
Result: Completed (special insp)
Status: Issued
Date: 07/30/2019
Type: Pre-Inspection
Result: Insp Cancelled
Status: Issued
Date: 08/02/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 07/29/2019
Type: Pre-Inspection
Result: Cancelled
Status: Issued
Date: 08/01/2019
Type: Pre-Inspection
Result: Insp Cancelled
Status: Issued
Date: 08/02/2019
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/02/2019
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 11/14/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 11/12/2019
Type: Reinforced Concrete Frame
Result: Conditional Approval
Status: Issued
Date: 08/09/2019
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 08/09/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 08/08/2019
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 08/05/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 08/09/2019
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 08/09/2019
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 08/08/2019
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 08/07/2019
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 08/15/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/08/2020
Type: Final
Result: Cancelled
Status: Issued
Date: 04/08/2020
Type: Green Building Final
Result: Cancelled
Status: Issued
Date: 04/06/2020
Type: TCO Elevator Verification
Result: Completed (special insp)
Status: Issued
Date: 04/07/2020
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 04/06/2020
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 04/07/2020
Type: TCO Electrical Verification
Result: Completed (special insp)
Status: Issued
Date: 04/06/2020
Type: TCO Electrical Verification
Result: Not Ready for Inspection
Status: Issued
Date: 08/21/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 08/20/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 08/20/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/19/2019
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 11/18/2019
Type: Reinforced Concrete Frame
Result: Conditional Approval
Status: Issued
Date: 11/18/2019
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 11/19/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/20/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/21/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 08/30/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/29/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 08/30/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 08/29/2019
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 08/29/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 08/26/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 08/30/2019
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 08/30/2019
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/30/2019
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 08/29/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 09/04/2019
Type: Pre-Inspection
Result: Conditional Approval
Status: Issued
Date: 01/04/2019
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 01/04/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/03/2019
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 01/11/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/09/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/10/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/26/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 09/14/2019
Type: Pre-Inspection
Result: Pending Review
Status: Issued
Date: 09/12/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 09/09/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 12/07/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 09/19/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 09/17/2019
Type: Pre-Inspection
Result: Off-Hour Fees Due
Status: Issued
Date: 09/16/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 12/03/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/06/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/05/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 12/07/2019
Type: Pre-Inspection
Result: Off-Hour Fees Due
Status: Issued
Date: 12/05/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/06/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 09/25/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 09/27/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 09/24/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 09/27/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 04/21/2020
Type: Final
Result: OK for TCO
Status: Issued
Date: 04/24/2020
Type: Final
Result: OK for TCO
Status: Issued
Date: 10/01/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 03/20/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 03/20/2019
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/20/2019
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 03/20/2019
Type: Reinforced Concrete Frame
Result: Corrections Issued
Status: Issued
Date: 12/09/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 12/13/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 03/29/2019
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 03/29/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/10/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 10/08/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/07/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 10/09/2019
Type: Reinforced Concrete Frame
Result: Conditional Approval
Status: Issued
Date: 04/24/2020
Type: Green Building Final
Result: Approved
Status: Issued
Date: 10/18/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 10/16/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 10/18/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 04/19/2019
Type: Verify Sprinkler Sign Off
Result: Cancelled
Status: Issued
Date: 04/16/2019
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 04/16/2019
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 04/16/2019
Type: Reinforced Concrete Frame
Result: Conditional Approval
Status: Issued
Date: 04/19/2019
Type: Reinforced Concrete Frame
Result: Cancelled
Status: Issued
Date: 04/19/2019
Type: Green Building Rough
Result: Cancelled
Status: Issued
Date: 10/18/2019
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/18/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 04/26/2019
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 04/22/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/24/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 04/23/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 04/24/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 04/25/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 12/18/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/16/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/30/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/30/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/01/2019
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 04/29/2019
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 04/30/2019
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 05/03/2019
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 05/02/2019
Type: Reinforced Concrete Frame
Result: Conditional Approval
Status: Issued
Date: 05/02/2019
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 05/10/2019
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 05/10/2019
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 05/09/2019
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 05/10/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 05/09/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 12/23/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/15/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/16/2019
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 05/14/2019
Type: Deputy Fireproofing
Result: Approved
Status: Issued
Date: 05/13/2019
Type: Deputy Fireproofing
Result: Approved
Status: Issued
Date: 05/15/2019
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 05/04/2020
Type: Electrical Verification
Result: CofO on Hold
Status: Issued
Date: 05/04/2020
Type: Heat,Vent,A/C Verification
Result: OK for CofO
Status: Issued
Date: 01/10/2020
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 01/10/2020
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 01/17/2020
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 01/14/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 01/22/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/05/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 03/11/2020
Type: Masonry Wall/Backfill
Result: Partial Inspection
Status: Issued
Date: 03/13/2020
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 03/12/2020
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 03/11/2020
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 03/10/2020
Type: Masonry Wall/Backfill
Result: Partial Inspection
Status: Issued
Date: 03/20/2020
Type: Plumbing Verification
Result: OK for CofO
Status: Issued
Date: 03/17/2020
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 03/17/2020
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 09/25/2020
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 09/25/2020
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 10/14/2020
Type: TCO Electrical Verification
Result: Completed (special insp)
Status: Issued
Date: 02/19/2021
Type: Inspection
Result: OK for CofO
Status: CofO in Progress
Date: 02/19/2021
Type: CofO Issuance
Result: CofO in Progress
Status: CofO in Progress
Date: 02/25/2021
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 02/25/2021
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 02/25/2021
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
MILLIE AND SEVERSON GENERAL CONTRACTORS

License number: 99031
Type: A
Phone: Speak with a Permit Expert
Location: LOS ALAMITOS, CA

Permit Applicant

Principal: JONATHAN EDWARD SEVERSON

Type:

Address:

Phone:

Experience: years

Applicant: KERRI SIMONS