Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

New 49-unit, 5-story apartment with 1 level abv ground parking and 2 l

Inspection Activity
Date: 02/06/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 02/08/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/08/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/07/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/07/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/04/2017
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 04/05/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/05/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/05/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/03/2017
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 04/03/2017
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/04/2017
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/04/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 04/03/2017
Type: Deputy Reinf. Concrete
Result: Insp Cancelled
Status: Issued
Date: 04/07/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/03/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 10/28/2016
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 10/24/2016
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/24/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 10/27/2016
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 10/25/2016
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/26/2016
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/25/2016
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/28/2016
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 10/26/2016
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/28/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 10/26/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/24/2016
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/25/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/27/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 10/27/2016
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 10/28/2016
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 10/24/2016
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/24/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 10/27/2016
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 10/25/2016
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/26/2016
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/25/2016
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/28/2016
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 10/28/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 10/26/2016
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/26/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/24/2016
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/25/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/27/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 10/27/2016
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 10/28/2016
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 10/24/2016
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/24/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 10/25/2016
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/27/2016
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 10/26/2016
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/25/2016
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/28/2016
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 10/26/2016
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/28/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 10/26/2016
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/24/2016
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/25/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/27/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 10/27/2016
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 11/01/2016
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 11/08/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/10/2016
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/23/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 11/22/2016
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 11/22/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 11/21/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 11/29/2016
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 11/29/2016
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/06/2016
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/09/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/09/2016
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/08/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 12/06/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/14/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 12/12/2016
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/21/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 12/20/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/22/2016
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 12/22/2016
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 12/19/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 12/20/2016
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 12/21/2016
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/19/2016
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/30/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 12/29/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/27/2016
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 12/30/2016
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 12/29/2016
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 01/03/2017
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 01/03/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/13/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/13/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 04/13/2017
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 04/18/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/25/2017
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 04/28/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 04/25/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/01/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/19/2017
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 05/19/2017
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 05/15/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Conditional Approval
Status: Issued
Date: 05/16/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 05/24/2017
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 05/22/2017
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 06/06/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 06/05/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 06/14/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 06/16/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 06/30/2017
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 06/30/2017
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 06/28/2017
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 06/28/2017
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 10/06/2017
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 10/06/2017
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 10/03/2017
Type: Interior/Exterior Lathing
Result: Conditional Approval
Status: Issued
Date: 10/06/2017
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 10/11/2017
Type: T-Bar Ceiling
Result: No Access for Inspection
Status: Issued
Date: 10/12/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/12/2017
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 10/12/2017
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 10/11/2017
Type: Interior/Exterior Lathing
Result: No Access for Inspection
Status: Issued
Date: 10/12/2017
Type: T-Bar Ceiling
Result: Not Ready for Inspection
Status: Issued
Date: 10/16/2017
Type: Interior/Exterior Lathing
Result: Not Ready for Inspection
Status: Issued
Date: 10/19/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/20/2017
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 10/16/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/19/2017
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 10/19/2017
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 10/16/2017
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 10/23/2017
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 10/23/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/27/2017
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 10/27/2017
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 10/31/2017
Type: Interior/Exterior Lathing
Result: No Access for Inspection
Status: Issued
Date: 11/03/2017
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 11/02/2017
Type: Interior/Exterior Lathing
Result: Not Ready for Inspection
Status: Issued
Date: 01/16/2018
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 01/16/2018
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 01/16/2018
Type: Final
Result: Partial Inspection
Status: Issued
Date: 01/16/2018
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 01/16/2018
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 01/16/2018
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 01/16/2018
Type: Reinforced Masonry Frame
Result: Partial Inspection
Status: Issued
Date: 01/16/2018
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 01/16/2018
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 01/16/2018
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 01/16/2018
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 01/22/2018
Type: Final
Result: Partial Inspection
Status: Issued
Date: 01/22/2018
Type: Reinforced Masonry Frame
Result: Partial Inspection
Status: Issued
Date: 01/22/2018
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 01/22/2018
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 01/23/2018
Type: T-Bar Ceiling
Result: Partial Inspection
Status: Issued
Date: 01/22/2018
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 01/22/2018
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 01/22/2018
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 01/22/2018
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 01/22/2018
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 01/29/2018
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: Issued
Date: 01/29/2018
Type: Green Building Final
Result: Partial Inspection
Status: Issued
Date: 01/29/2018
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 01/29/2018
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 01/29/2018
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 01/29/2018
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 01/29/2018
Type: Reinforced Masonry Frame
Result: Partial Inspection
Status: Issued
Date: 01/29/2018
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 01/29/2018
Type: Smoke Detectors
Result: Partial Inspection
Status: Issued
Date: 02/05/2018
Type: Final
Result: Partial Inspection
Status: Issued
Date: 02/05/2018
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 02/05/2018
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 02/05/2018
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 02/05/2018
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 02/05/2018
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 02/05/2018
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 02/05/2018
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 02/20/2018
Type: Verify Sprinkler Sign Off
Result: Cancelled
Status: Issued
Date: 02/20/2018
Type: Reinforced Concrete Frame
Result: Cancelled
Status: Issued
Date: 02/20/2018
Type: Final
Result: Cancelled
Status: Issued
Date: 02/21/2018
Type: T-Bar Ceiling
Result: Approved
Status: Issued
Date: 02/20/2018
Type: Structural Steel Frame
Result: Cancelled
Status: Issued
Date: 02/20/2018
Type: Reinforced Masonry Frame
Result: Cancelled
Status: Issued
Date: 02/20/2018
Type: Wood Frame
Result: Cancelled
Status: Issued
Date: 02/20/2018
Type: Green Building Final
Result: Cancelled
Status: Issued
Date: 02/26/2018
Type: Structural Steel Frame
Result: Approved
Status: CofO Issued
Date: 02/26/2018
Type: Verify Sprinkler Sign Off
Result: Approved
Status: CofO Issued
Date: 03/02/2018
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 03/01/2018
Type: CofO Issuance
Result: CofO in Progress
Status: CofO Issued
Date: 03/02/2018
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 02/27/2018
Type: Fire Sprinkler Verification
Result: OK for CofO
Status: CofO Issued
Date: 02/27/2018
Type: Special/Order Compliance
Result: Conditional Approval
Status: CofO Issued
Date: 02/27/2018
Type: Heat,Vent,A/C Verification
Result: OK for CofO
Status: CofO Issued
Date: 02/26/2018
Type: Reinforced Concrete Frame
Result: Approved
Status: CofO Issued
Date: 02/28/2018
Type: Elevator Verification
Result: OK for CofO
Status: CofO Issued
Date: 02/27/2018
Type: Electrical Verification
Result: OK for CofO
Status: CofO Issued
Date: 03/02/2018
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 02/26/2018
Type: Green Building Final
Result: Approved
Status: CofO Issued
Date: 02/27/2018
Type: Plumbing Verification
Result: Pending
Status: CofO Issued
Date: 02/26/2018
Type: Wood Frame
Result: Approved
Status: CofO Issued
Date: 02/26/2018
Type: Reinforced Masonry Frame
Result: Approved
Status: CofO Issued
Date: 02/28/2018
Type: Special/Order Compliance
Result: Approved
Status: CofO Issued
Date: 02/26/2018
Type: Final
Result: Partial Inspection
Status: CofO Issued
Date: 02/28/2018
Type: Final
Result: OK to Issue CofO
Status: CofO Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
PACIFIC EMPIRE BUILDERS INC

License number: 862568
Type: B
Phone: Speak with a Permit Expert
Location: GLENDALE, CA

Permit Applicant

Principal: JASON BYRON TOLLESON

Type:

Address: 500 N. BRAND BLVD, 2120, GLENDALE, CA

Phone:

Experience: years

Applicant: .