Bldg-Alter/Repair Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

ADAPTIVE REUSE CONVERSION OF AN EXISTING 13-STORY OFFICE BUILDING TO A

Inspection Activity
Date: 10/23/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/22/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/21/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/24/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/25/2019
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 10/28/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/31/2019
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 11/01/2019
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 10/30/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/29/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 11/07/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 11/04/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 11/05/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 11/06/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 11/08/2019
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 08/19/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 11/15/2019
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 11/14/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 11/13/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 11/12/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 11/20/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 11/22/2019
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 11/19/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 11/18/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 11/21/2019
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 11/23/2021
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 04/13/2020
Type: METHANE-Rough
Result: Approved
Status: Issued
Date: 11/25/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 11/26/2019
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 11/27/2019
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 01/15/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 01/15/2019
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 01/15/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 01/15/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 04/13/2020
Type: Reinforced Concrete Frame
Result: Conditional Approval
Status: Issued
Date: 04/13/2020
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 08/27/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 08/25/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 08/26/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/02/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/20/2019
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 09/19/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/18/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/17/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 12/04/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 12/03/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 12/05/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 12/06/2019
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 09/26/2019
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 09/27/2019
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 09/24/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/24/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/24/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/23/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/25/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/03/2019
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 10/03/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/02/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/01/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/04/2019
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 10/02/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/03/2019
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 09/30/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/03/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/10/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/07/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/09/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/08/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/11/2019
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 04/08/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/12/2019
Type: Deputy Other (see comments)
Result: Insp Scheduled
Status: Issued
Date: 04/11/2019
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 12/31/2020
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 10/15/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/16/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 04/15/2019
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 04/16/2019
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 04/17/2019
Type: Deputy Other (see comments)
Result: Insp Cancelled
Status: Issued
Date: 10/17/2019
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/18/2019
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 05/06/2020
Type: Reinforced Concrete Frame
Result: Conditional Approval
Status: Issued
Date: 04/21/2021
Type: T-Bar Ceiling
Result: Conditional Approval
Status: Issued
Date: 01/22/2020
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 01/23/2020
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 09/08/2020
Type: Reinforced Concrete Frame
Result: Conditional Approval
Status: Issued
Date: 01/29/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/31/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/30/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/28/2020
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 05/21/2020
Type: Reinforced Concrete Frame
Result: Conditional Approval
Status: Issued
Date: 02/04/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/06/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/14/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/10/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 02/13/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/13/2020
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 01/08/2021
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 06/02/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 06/12/2020
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 08/11/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/21/2020
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 07/08/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 09/21/2020
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 07/17/2020
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 01/19/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/20/2020
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 01/21/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 01/21/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 08/04/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 08/05/2020
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 10/05/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 01/28/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 10/22/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/24/2021
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 05/04/2021
Type: Drywall Nailing
Result: Insp Cancelled
Status: Issued
Date: 02/04/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/02/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/02/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/05/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/03/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/05/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/03/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/12/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/10/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 11/19/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 11/24/2020
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 11/25/2020
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 03/02/2022
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 08/17/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 12/02/2020
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 02/17/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/18/2021
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 12/08/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 12/08/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 12/10/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 08/17/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 08/20/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/16/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/23/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/21/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 03/03/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 03/03/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/01/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/17/2021
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 05/19/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/10/2021
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 03/10/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/18/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/16/2021
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 05/27/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/25/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/24/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/24/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 03/31/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 12/01/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/01/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/02/2022
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 04/13/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/15/2021
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 04/13/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 09/01/2021
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 09/01/2021
Type: T-Bar Ceiling
Result: Conditional Approval
Status: Issued
Date: 06/08/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/11/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/07/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/30/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 08/31/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/30/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/18/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 06/14/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/17/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/08/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/22/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/25/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/09/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/07/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/06/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/01/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/28/2021
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 07/01/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/28/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/08/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/09/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 07/12/2021
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 12/08/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 12/08/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/20/2021
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 07/20/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/23/2021
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 09/21/2021
Type: T-Bar Ceiling
Result: Not Ready for Inspection
Status: Issued
Date: 07/29/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/23/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/30/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 09/30/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/30/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/11/2022
Type: T-Bar Ceiling
Result: Insp Scheduled
Status: Issued
Date: 10/25/2021
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 11/10/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/16/2021
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 11/18/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/19/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/16/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/14/2022
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 03/23/2022
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/21/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/02/2022
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 02/14/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/06/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/12/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/14/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/13/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/08/2022
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 04/22/2022
Type: AIM Verification
Result: Insp Scheduled
Status: Issued
Date: 04/20/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/21/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/18/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/27/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/26/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/27/2022
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/29/2022
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 05/04/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/17/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/18/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/16/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 05/26/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 07/21/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/21/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/22/2022
Type: Public Counter
Result: Completed
Status: Issued
Date: 10/20/2022
Type: Posting Pre-Inspection
Result: Approved
Status: Issued
Date: 10/28/2022
Type: SGSOV-Seismic Gas S/O Valve
Result: Insp Scheduled
Status: Issued
Date: 10/28/2022
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 10/28/2022
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 10/28/2022
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 10/28/2022
Type: Smoke Detectors
Result: Insp Scheduled
Status: Issued
Date: 10/31/2022
Type: Posting Pre-Inspection
Result: Insp Cancelled
Status: Issued
Date: 10/11/2023
Type: CofO Issuance
Result: CofO in Progress
Status: CofO Issued
Date: 10/11/2023
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 10/11/2023
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 10/11/2023
Type: Inspection
Result: OK for CofO
Status: CofO Issued
Date: 10/11/2023
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 06/05/2023
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 07/10/2023
Type: Electrical Verification
Result: OK for CofO
Status: Issued
Date: 07/10/2023
Type: Heat,Vent,A/C Verification
Result: Insp Scheduled
Status: Issued
Date: 07/10/2023
Type: Plumbing Verification
Result: CofO on Hold
Status: Issued
Date: 07/10/2023
Type: Pressure Vessel Verification
Result: OK for CofO
Status: Issued
Date: 07/18/2023
Type: Heat,Vent,A/C Verification
Result: OK for CofO
Status: Issued
Date: 07/27/2023
Type: Final
Result: Insp Cancelled
Status: Issued
Date: 08/10/2023
Type: Plumbing Verification
Result: OK for CofO
Status: Issued
Date: 08/08/2023
Type: Final
Result: Conditional Approval
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
PHILMONT MANAGEMENT INC

License number: 808686
Type: B
Phone: Speak with a Permit Expert
Location: LOS ANGELES, CA

Permit Applicant

Principal: BOM SUNG PARK

Type:

Address: 3470 WILSHIRE BLVD, 700, LOS ANGELES, CA

Phone:

Experience: years

Applicant: NIKKI JAZVEC