Nonbldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

SUPPLEMENTAL TO PERMIT # 15020-10000-03413 TO REVISE SHORING PLANS:

Inspection Activity
Date: 10/06/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/12/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 10/11/2017
Type: Deputy Grading
Result: Approved
Status: Issued
Date: 10/11/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 10/12/2017
Type: Deputy Grading
Result: Approved
Status: Issued
Date: 10/13/2017
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 10/13/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/23/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 10/31/2017
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 11/02/2017
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 11/03/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 11/01/2017
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/20/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/20/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/18/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/18/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/20/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/18/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/16/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/16/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/16/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 11/06/2017
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/19/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/19/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/17/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/19/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/17/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/17/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 11/14/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/16/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/16/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/16/2017
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 11/15/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/15/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/17/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/17/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/13/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/14/2017
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 11/17/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 11/15/2017
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 11/13/2017
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 05/01/2018
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 05/03/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 05/04/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 05/02/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 05/01/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 05/01/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 05/01/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 05/01/2018
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 04/30/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 11/29/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/29/2017
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 06/11/2019
Type: Deputy Other (see comments)
Result: Approved
Status: Issued
Date: 06/14/2019
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/15/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 12/12/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/13/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 06/14/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 06/10/2019
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 06/11/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 06/12/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/13/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/14/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/10/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 06/11/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 06/12/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 06/10/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/13/2019
Type: Deputy Other (see comments)
Result: Approved
Status: Issued
Date: 06/13/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 06/14/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 06/12/2019
Type: Deputy Other (see comments)
Result: Insp Scheduled
Status: Issued
Date: 12/19/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/20/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 06/11/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/21/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 05/25/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 05/23/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 05/24/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 12/29/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 12/28/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 05/22/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/10/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 06/10/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 06/14/2019
Type: Deputy Other (see comments)
Result: Insp Scheduled
Status: Issued
Date: 06/12/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 01/04/2018
Type: Piling/Pier/Caisson
Result: Insp Scheduled
Status: Issued
Date: 01/02/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Conditional Approval
Status: Issued
Date: 06/01/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 05/30/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 05/30/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 05/29/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 05/31/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/17/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/17/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 06/18/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 06/21/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 06/21/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/21/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/18/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/19/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 06/20/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/20/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 06/05/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/06/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/05/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/08/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/07/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 01/29/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/31/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 02/01/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 01/30/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 01/31/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 02/02/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/20/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 06/21/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 06/17/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 06/19/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/17/2019
Type: Deputy Other (see comments)
Result: Approved
Status: Issued
Date: 06/19/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 06/18/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 02/06/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 02/08/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 02/05/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 02/07/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 02/09/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/15/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 02/15/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 02/12/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 02/12/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 02/13/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 02/14/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/28/2019
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 02/22/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/22/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/20/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 02/23/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 02/21/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 02/22/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/11/2019
Type: Deputy Other (see comments)
Result: Approved
Status: Issued
Date: 06/14/2019
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/10/2019
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 06/13/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 06/14/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 06/11/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 06/20/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/21/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/18/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/19/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/18/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/12/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/14/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/10/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 06/13/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/11/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 06/12/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 06/10/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/13/2019
Type: Deputy Other (see comments)
Result: Approved
Status: Issued
Date: 06/13/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 06/14/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 06/12/2019
Type: Deputy Other (see comments)
Result: Insp Scheduled
Status: Issued
Date: 06/11/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/10/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 06/10/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 06/14/2019
Type: Deputy Other (see comments)
Result: Insp Scheduled
Status: Issued
Date: 06/12/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 03/15/2018
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 06/28/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/29/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/26/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/27/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/25/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/29/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/21/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 03/23/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 03/23/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 03/22/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 03/27/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 03/28/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 03/30/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/29/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 07/03/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/05/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/03/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/06/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/04/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/09/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/10/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/09/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/12/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/11/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/10/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/13/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/09/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/10/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/09/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/12/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/11/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/10/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/13/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 07/18/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 07/17/2018
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 07/18/2018
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 07/16/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 07/17/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 07/16/2018
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 08/10/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/08/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/09/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/16/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/17/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/17/2018
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 08/16/2018
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 08/23/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 08/24/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 08/20/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 07/26/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/23/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 07/23/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 08/30/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 10/12/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/18/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/19/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/17/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 08/19/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 08/21/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/25/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/24/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/23/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/26/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 11/09/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 01/14/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/23/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/01/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/31/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 01/31/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 02/01/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 01/31/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/01/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 02/05/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 02/05/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 02/06/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 02/06/2019
Type: Deputy Steel/Welding
Result: Insp Cancelled
Status: Issued
Date: 02/05/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/04/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/07/2019
Type: Deputy Steel/Welding
Result: Insp Cancelled
Status: Issued
Date: 02/04/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 02/05/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 02/06/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 02/08/2019
Type: Deputy Steel/Welding
Result: Insp Cancelled
Status: Issued
Date: 02/06/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/04/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 02/04/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 02/28/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 03/01/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/04/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 03/06/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 03/05/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 03/15/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/11/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/18/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/20/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/05/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/03/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/04/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/11/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/12/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/12/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/12/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/11/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/12/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 04/10/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/12/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/10/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/12/2019
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/17/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/24/2019
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 04/22/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/22/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/23/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 04/23/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 04/22/2019
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 04/24/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 04/24/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 04/26/2019
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/25/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/25/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/26/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/23/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/25/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 04/23/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/25/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 04/26/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/25/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 04/26/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/22/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 04/23/2019
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 04/23/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 04/26/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/24/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/26/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 04/22/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 04/24/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/25/2019
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 04/22/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 04/24/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 05/02/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/06/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/08/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/13/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/30/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/23/2019
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 05/23/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 05/23/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 05/24/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/24/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 05/24/2019
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/24/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/23/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/04/2020
Type: Final
Result: Permit Finaled
Status: Permit Finaled
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
WEBCOR CONSTRUCTION L P

License number: 899242
Type: B
Phone: Speak with a Permit Expert
Location: ALAMEDA, CA

Permit Applicant

Principal: ANTHONY DAVID RANGO

Type:

Address: 1999 AVE OF THE STARS

Phone:

Experience: years

Applicant: LYNDA HAAS