Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

PROPOSED 3-STORY W/ MEZZ MIXED-USE BUILDING W/ 19 APARTMENT UNITS O

Inspection Activity
Date: 04/16/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 04/20/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/20/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 04/20/2018
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 04/20/2018
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 04/20/2018
Type: METHANE-Subgrade
Result: Insp Scheduled
Status: Issued
Date: 11/17/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 03/25/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/25/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/02/2018
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 05/04/2018
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 05/01/2018
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 05/03/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/04/2018
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 05/04/2018
Type: METHANE-Rough
Result: Insp Scheduled
Status: Issued
Date: 05/04/2018
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 05/04/2018
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 10/22/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/20/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/27/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/05/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/04/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 01/04/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/04/2018
Type: METHANE-Barrier
Result: Partial Inspection
Status: Issued
Date: 01/02/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/04/2018
Type: METHANE-Subgrade
Result: Partial Inspection
Status: Issued
Date: 10/22/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/10/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 01/17/2018
Type: METHANE-Barrier
Result: Partial Inspection
Status: Issued
Date: 01/17/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 01/17/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/17/2018
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 03/25/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 01/25/2018
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 01/25/2018
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 01/25/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 01/25/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/25/2020
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/25/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 02/06/2018
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 02/05/2018
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 02/14/2018
Type: METHANE-Barrier
Result: Partial Approval
Status: Issued
Date: 02/14/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/14/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 02/14/2018
Type: METHANE-Subgrade
Result: Partial Approval
Status: Issued
Date: 02/23/2018
Type: METHANE-Rough
Result: Insp Scheduled
Status: Issued
Date: 02/23/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/23/2018
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 02/23/2018
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 02/23/2018
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 03/01/2018
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 02/28/2018
Type: METHANE-Rough
Result: No Access for Inspection
Status: Issued
Date: 02/28/2018
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 02/28/2018
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 02/28/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 03/07/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 03/07/2018
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/07/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/09/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/07/2018
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/07/2018
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 03/15/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/12/2018
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 03/15/2018
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/15/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 03/15/2018
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 03/15/2018
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 06/25/2018
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 06/26/2018
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 06/29/2018
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 03/20/2018
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 03/20/2018
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/27/2018
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 06/28/2018
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 03/27/2018
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 03/27/2018
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/06/2018
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 07/06/2018
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 07/05/2018
Type: METHANE-Subgrade
Result: Approved
Status: Issued
Date: 07/05/2018
Type: METHANE-Barrier
Result: Partial Approval
Status: Issued
Date: 07/05/2018
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 07/05/2019
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 07/03/2019
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 07/03/2019
Type: METHANE-Barrier
Result: Partial Approval
Status: Issued
Date: 07/05/2019
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 07/09/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/03/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/08/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/23/2018
Type: Drywall Nailing
Result: No Access for Inspection
Status: Issued
Date: 08/13/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/23/2018
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 08/23/2018
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 08/23/2018
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 08/23/2018
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 08/23/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/28/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 08/28/2018
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 08/28/2018
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 08/28/2018
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 11/15/2019
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 11/15/2019
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 11/15/2019
Type: METHANE-Rough
Result: Insp Scheduled
Status: Issued
Date: 11/15/2019
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 11/13/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/07/2020
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 08/27/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/13/2020
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 04/15/2020
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 04/17/2020
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 11/26/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/17/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 04/23/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 04/23/2020
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/23/2020
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/23/2020
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 04/22/2020
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 04/21/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/10/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/05/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/23/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 04/08/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/29/2020
Type: Special/Order Compliance
Result: Corrections Issued
Status: Issued
Date: 04/27/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 04/27/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 04/27/2020
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 04/27/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 12/26/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/10/2019
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 05/10/2019
Type: METHANE-Rough
Result: Insp Scheduled
Status: Issued
Date: 05/10/2019
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 05/10/2019
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 05/10/2019
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 05/10/2019
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 12/27/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/14/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/22/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/07/2020
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/07/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 01/09/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/09/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/07/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 01/07/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/10/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/04/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/06/2020
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 01/13/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 01/15/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 01/13/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/17/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/13/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/13/2020
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/17/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/13/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/13/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 01/17/2020
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 05/12/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/23/2020
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/21/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 01/23/2020
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 01/23/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/23/2020
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 01/23/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 01/23/2020
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/28/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/28/2020
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 02/28/2020
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 02/27/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/28/2020
Type: METHANE-Rough
Result: Insp Scheduled
Status: Issued
Date: 02/28/2020
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 03/06/2020
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 03/02/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/06/2020
Type: METHANE-Rough
Result: Insp Scheduled
Status: Issued
Date: 03/06/2020
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 03/06/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/06/2020
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 06/10/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 06/17/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 06/17/2020
Type: Special/Order Compliance
Result: Corrections Issued
Status: Issued
Date: 06/18/2020
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 06/26/2020
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 06/26/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 07/06/2020
Type: Insulation
Result: Cancelled
Status: Issued
Date: 07/07/2020
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 07/08/2020
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 07/10/2020
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 07/06/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Cancelled
Status: Issued
Date: 07/15/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 12/16/2020
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 06/23/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/29/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/09/2022
Type: Heat,Vent,A/C Verification
Result: OK for CofO
Status: Issued
Date: 03/09/2022
Type: Elevator Verification
Result: CofO on Hold
Status: Issued
Date: 12/14/2021
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 03/09/2022
Type: Electrical Verification
Result: CofO on Hold
Status: Issued
Date: 03/09/2022
Type: Plumbing Verification
Result: CofO on Hold
Status: Issued
Date: 03/11/2022
Type: Grading Verification
Result: Insp Scheduled
Status: Issued
Date: 03/09/2022
Type: Pressure Vessel Verification
Result: OK for CofO
Status: Issued
Date: 03/17/2022
Type: Pre-Inspection
Result: Corrections Issued
Status: Issued
Date: 06/16/2022
Type: Reinforced Concrete Frame
Result: Approved
Status: Issued
Date: 06/16/2022
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 06/16/2022
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 06/16/2022
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 06/16/2022
Type: Structural Steel Frame
Result: Approved
Status: Issued
Date: 06/13/2022
Type: Plumbing Verification
Result: OK for CofO
Status: Issued
Date: 06/16/2022
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 06/16/2022
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: Issued
Date: 06/16/2022
Type: METHANE-Final
Result: Approved
Status: Issued
Date: 06/16/2022
Type: Green Building Final
Result: Approved
Status: Issued
Date: 06/16/2022
Type: METHANE-Barrier
Result: Approved
Status: Issued
Date: 06/16/2022
Type: SUSMP-Std. Urban Storm Water
Result: Approved
Status: Issued
Date: 06/16/2022
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 06/16/2022
Type: METHANE-Rough
Result: Approved
Status: Issued
Date: 06/16/2022
Type: Final
Result: Corrections Issued
Status: Issued
Date: 04/06/2022
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 04/14/2022
Type: Elevator Verification
Result: OK for CofO
Status: Issued
Date: 09/27/2022
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 05/10/2023
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 03/14/2024
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 03/19/2024
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 03/19/2024
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 03/19/2024
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 03/18/2024
Type: CofO Issuance
Result: CofO in Progress
Status: CofO Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
HY-MAX BUILDING CORP

License number: 702339
Type: B
Phone: Speak with a Permit Expert
Location: VALENCIA, CA

Permit Applicant

Principal: MICHAEL DAVID BLAHA

Type:

Address: 1733 S. LA CIENEGA BLVD, LOS ANGELES, CA

Phone:

Experience: years

Applicant: .