Bldg-New Permit

PCIS Permit#: 16010-10000-00611

Address: 700 MANHATTAN, Los Angeles, 90005

Status: CofO Issued

Status Date: 03/25/2020

Tract: WESTERN WILSHIRE HEIGHTS

Property Identifier: Block: , Lot: 112, Zone: R4-2

Assessor Information: Book: 5093, Page: 4, Parcel: 14

Census Tract: 2126.1

Work Description

NEW 7-STORY, 5 LEVEL TYPE III-A OVER 2 LEVEL TYPE I-A 160 UNIT MIXED

Inspection Activity
Date: 06/12/2017
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/16/2017
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 06/13/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/26/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/02/2017
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/04/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 10/06/2017
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 10/06/2017
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 10/04/2017
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 10/05/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/02/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/05/2017
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/03/2017
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 10/06/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/05/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 10/03/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/03/2017
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/04/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/04/2017
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/06/2017
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 10/03/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 10/10/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/13/2017
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 10/12/2017
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 10/11/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/11/2017
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 10/20/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/20/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/20/2017
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 10/26/2017
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/27/2017
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 10/24/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/02/2017
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/31/2017
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 11/03/2017
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 11/03/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/02/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/03/2017
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 11/01/2017
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 11/01/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/30/2017
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 11/01/2017
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/18/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 11/07/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/08/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 11/09/2017
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 05/31/2019
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 05/29/2019
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 11/16/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/16/2017
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 11/14/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 11/17/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/17/2017
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 03/25/2020
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 04/30/2018
Type: Wood Frame
Result: Corrections Issued
Status: Issued
Date: 11/20/2017
Type: Deputy Shotcrete
Result: No Access for Inspection
Status: Issued
Date: 11/21/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/22/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/21/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 11/22/2017
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 11/21/2017
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 11/20/2017
Type: Deputy Reinf. Concrete
Result: No Access for Inspection
Status: Issued
Date: 11/22/2017
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 12/01/2017
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 11/28/2017
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 11/28/2017
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 11/28/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/30/2017
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 11/28/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 11/30/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 11/29/2017
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 11/29/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/01/2017
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 11/30/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/01/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/25/2019
Type: SGSOV-Seismic Gas S/O Valve
Result: Insp Scheduled
Status: Issued
Date: 10/25/2019
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 10/25/2019
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 10/24/2019
Type: Smoke Detectors
Result: Cancelled
Status: Issued
Date: 10/25/2019
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 10/24/2019
Type: Reinforced Concrete Frame
Result: Cancelled
Status: Issued
Date: 12/08/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/06/2017
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 12/08/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 12/06/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/04/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/09/2017
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 12/06/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/07/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/08/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 12/04/2017
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/07/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/05/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 12/05/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/05/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/07/2017
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 05/14/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 12/15/2017
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 12/13/2017
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 12/15/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/13/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/14/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/19/2017
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 12/19/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/19/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 12/20/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/20/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/19/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/25/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 05/24/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/14/2019
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 01/04/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 10/24/2019
Type: Final
Result: Cancelled
Status: Issued
Date: 10/24/2019
Type: Reinforced Masonry Frame
Result: Cancelled
Status: Issued
Date: 10/24/2019
Type: SGSOV-Seismic Gas S/O Valve
Result: Cancelled
Status: Issued
Date: 10/24/2019
Type: Footing/Foundation/Slab
Result: Cancelled
Status: Issued
Date: 10/25/2019
Type: Smoke Detectors
Result: Insp Scheduled
Status: Issued
Date: 10/25/2019
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 01/12/2018
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 01/11/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/11/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/12/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/11/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/31/2018
Type: Wood Frame
Result: Cancelled
Status: Issued
Date: 05/30/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 01/19/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/16/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/16/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/20/2018
Type: Structural Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 01/16/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 01/19/2018
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 01/17/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/17/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/17/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/18/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/18/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/18/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/16/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/25/2020
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 01/24/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/23/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/23/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/23/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 01/24/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/01/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/29/2018
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 02/02/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/29/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/18/2019
Type: Verify Rec and Parks Fee Memo
Result: Partial Inspection
Status: Issued
Date: 03/25/2020
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 02/08/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/07/2018
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 02/06/2018
Type: Reinforced Concrete Frame
Result: Cancelled
Status: Issued
Date: 02/06/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/05/2018
Type: Reinforced Masonry Frame
Result: Partial Inspection
Status: Issued
Date: 02/08/2018
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 02/07/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/09/2018
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 02/09/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/13/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 02/13/2018
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 02/14/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/31/2019
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 11/01/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 02/21/2018
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 06/22/2018
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 03/05/2018
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/06/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 06/14/2019
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 10/29/2019
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 10/31/2019
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 10/31/2019
Type: Reinforced Concrete Frame
Result: Approved
Status: Issued
Date: 06/29/2018
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 03/12/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 03/14/2018
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 06/26/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 06/28/2018
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 03/19/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 06/25/2018
Type: Footing/Foundation/Slab
Result: Cancelled
Status: Issued
Date: 10/31/2019
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: Issued
Date: 10/31/2019
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 10/30/2019
Type: Wood Frame
Result: Cancelled
Status: Issued
Date: 11/02/2019
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 07/03/2018
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 07/05/2018
Type: Wood Frame
Result: Cancelled
Status: Issued
Date: 04/04/2018
Type: Wood Frame
Result: Cancelled
Status: Issued
Date: 04/09/2018
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/13/2018
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 04/10/2018
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 04/11/2018
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 04/12/2018
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 07/13/2018
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 07/13/2018
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 04/09/2018
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/10/2018
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 04/13/2018
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 04/11/2018
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 04/12/2018
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 07/10/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 07/19/2018
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 07/16/2018
Type: Insulation
Result: Cancelled
Status: Issued
Date: 07/24/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 07/26/2018
Type: Masonry Wall/Backfill
Result: Not Ready for Inspection
Status: Issued
Date: 08/01/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 08/03/2018
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 08/10/2018
Type: Piling/Pier/Caisson
Result: Insp Scheduled
Status: Issued
Date: 08/06/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 08/09/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 11/07/2019
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 08/13/2018
Type: Wood Frame
Result: Cancelled
Status: Issued
Date: 08/15/2018
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 11/06/2019
Type: Verify Rec and Parks Fee Memo
Result: Partial Inspection
Status: Issued
Date: 11/04/2019
Type: Final
Result: Partial Inspection
Status: Issued
Date: 11/05/2019
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 07/26/2019
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 07/26/2019
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 07/26/2019
Type: Smoke Detectors
Result: Insp Scheduled
Status: Issued
Date: 07/26/2019
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 07/26/2019
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 08/20/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 08/20/2018
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 07/26/2019
Type: SGSOV-Seismic Gas S/O Valve
Result: Insp Scheduled
Status: Issued
Date: 07/26/2019
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 08/27/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 08/29/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 08/28/2018
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 07/30/2019
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 07/30/2019
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 07/30/2019
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 07/30/2019
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 09/13/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 09/14/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 09/13/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/11/2018
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 09/11/2018
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 07/30/2019
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 07/30/2019
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 07/30/2019
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 07/30/2019
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 09/21/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 09/19/2018
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 11/15/2019
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 10/05/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 10/11/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/11/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/22/2018
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 11/18/2019
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 11/13/2018
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 11/16/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 09/06/2019
Type: Heat,Vent,A/C Verification
Result: CofO on Hold
Status: Issued
Date: 01/02/2019
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 01/02/2019
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 01/02/2019
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 01/03/2019
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 01/04/2019
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 01/02/2019
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 01/03/2019
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 01/02/2019
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 09/06/2019
Type: Plumbing Verification
Result: Insp Scheduled
Status: Issued
Date: 09/06/2019
Type: Fire Sprinkler Verification
Result: CofO on Hold
Status: Issued
Date: 09/06/2019
Type: Electrical Verification
Result: CofO on Hold
Status: Issued
Date: 01/08/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/08/2019
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 11/25/2019
Type: Final
Result: Partial Approval
Status: Issued
Date: 01/14/2019
Type: Green Building Rough
Result: Cancelled
Status: Issued
Date: 01/18/2019
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 01/18/2019
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 01/16/2019
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 01/14/2019
Type: Verify Sprinkler Sign Off
Result: Cancelled
Status: Issued
Date: 01/18/2019
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 01/14/2019
Type: Reinforced Concrete Frame
Result: Cancelled
Status: Issued
Date: 09/10/2019
Type: Fire Sprinkler Verification
Result: CofO on Hold
Status: Issued
Date: 09/10/2019
Type: Electrical Verification
Result: CofO on Hold
Status: Issued
Date: 09/09/2019
Type: Pressure Vessel Verification
Result: OK for CofO
Status: Issued
Date: 09/09/2019
Type: Elevator Verification
Result: CofO on Hold
Status: Issued
Date: 01/28/2019
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 01/31/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/08/2019
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 02/20/2019
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 02/20/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 02/20/2019
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 02/20/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/25/2019
Type: Green Building Final
Result: Approved
Status: Issued
Date: 03/07/2019
Type: Light Gage Steel Frame
Result: Conditional Approval
Status: Issued
Date: 03/18/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/01/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/12/2019
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 04/08/2019
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/10/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/17/2019
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/18/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/26/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/24/2019
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/23/2019
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 05/02/2019
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/30/2019
Type: Light Gage Steel Frame
Result: Approved
Status: Issued
Date: 05/08/2019
Type: Elevator Verification
Result: CofO on Hold
Status: Issued
Date: 05/08/2019
Type: Heat,Vent,A/C Verification
Result: CofO on Hold
Status: Issued
Date: 05/08/2019
Type: Plumbing Verification
Result: CofO on Hold
Status: Issued
Date: 05/08/2019
Type: Pressure Vessel Verification
Result: Pending
Status: Issued
Date: 05/08/2019
Type: Electrical Verification
Result: CofO on Hold
Status: Issued
Date: 05/08/2019
Type: Fire Sprinkler Verification
Result: CofO on Hold
Status: Issued
Date: 05/14/2019
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 05/21/2019
Type: Verify Rec and Parks Fee Memo
Result: Partial Inspection
Status: Issued
Date: 03/02/2020
Type: CofO Issuance
Result: CofO in Progress
Status: CofO in Progress
Date: 03/02/2020
Type: Inspection
Result: OK for CofO
Status: CofO in Progress
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
WILSHIRE CONSTRUCTION LP

License number: 986095
Type: B
Phone: Speak with a Permit Expert
Location: LOS ANGELES, CA

Permit Applicant

Principal: YONG HEE HAHN
Type:
Address: 3470 WILSHIRE BLVD, 700, LOS ANGELES, CA
Phone:
Experience: years
Applicant: NIKKI JAZVEC