Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

New 5-story 60-unit apartment (6-unit very low income) over 2-levels o

Inspection Activity
Date: 12/22/2020
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 11/06/2017
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 11/07/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/06/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 11/13/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/14/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/14/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/13/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 11/17/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 05/03/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/21/2017
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 11/20/2017
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 11/20/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/21/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/03/2018
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 05/02/2018
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 11/27/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/28/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/27/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/30/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 11/28/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/30/2017
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 11/28/2017
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 12/05/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Pending Review
Status: Issued
Date: 12/04/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/04/2017
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 12/21/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/20/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/21/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/28/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/29/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/27/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/27/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 01/03/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 01/04/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/03/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/05/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/04/2018
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 01/02/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 10/22/2019
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 06/01/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/31/2018
Type: Deputy Reinf. Concrete
Result: Insp Cancelled
Status: Issued
Date: 05/31/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/26/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/26/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/25/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/25/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Conditional Approval
Status: Issued
Date: 06/05/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/04/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/02/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/29/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/02/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 02/01/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 01/30/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 06/04/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/16/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 02/12/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/16/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/12/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/21/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/21/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/20/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/20/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/01/2018
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 02/27/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/28/2018
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 02/26/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/01/2018
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 02/27/2018
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 02/26/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/20/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 06/19/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 06/19/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/21/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 03/06/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/05/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/08/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 03/05/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/05/2018
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 03/05/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/06/2018
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/27/2018
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 03/16/2018
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 03/13/2018
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 03/16/2018
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 03/15/2018
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 03/14/2018
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 03/15/2018
Type: Masonry Wall/Backfill
Result: Partial Inspection
Status: Issued
Date: 06/28/2018
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 06/28/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/28/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/27/2018
Type: Masonry Wall/Backfill
Result: Not Ready for Inspection
Status: Issued
Date: 03/19/2018
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 06/26/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 07/03/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 07/05/2018
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 07/05/2019
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 07/01/2019
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 07/19/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 07/19/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/20/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 07/08/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 07/16/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/16/2019
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 11/07/2019
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 11/07/2019
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 08/12/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 01/09/2019
Type: Drywall Nailing
Result: Corrections Issued
Status: Issued
Date: 01/09/2019
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/15/2019
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/15/2019
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 01/22/2019
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/22/2019
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 02/12/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 02/12/2019
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 02/12/2019
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 02/12/2019
Type: Wall Anchors
Result: Not Ready for Inspection
Status: Issued
Date: 02/12/2019
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 02/20/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 02/20/2019
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 02/28/2019
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 02/28/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/04/2019
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/04/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/15/2019
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 03/15/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 04/03/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 04/09/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/09/2019
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 04/15/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 04/22/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/22/2019
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 12/17/2019
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 12/17/2019
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 12/17/2019
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 05/09/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/21/2019
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 09/04/2020
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 04/19/2021
Type: Interior/Exterior Lathing
Result: Insp Cancelled
Status: Issued
Date: 04/19/2021
Type: Special/Order Compliance
Result: Insp Cancelled
Status: Issued
Date: 01/06/2021
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 05/28/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/28/2020
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 05/26/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/26/2020
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 06/01/2020
Type: Wood Frame
Result: Cancelled
Status: Issued
Date: 06/01/2020
Type: Green Building Rough
Result: Cancelled
Status: Issued
Date: 06/05/2020
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 06/02/2020
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 03/11/2020
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 03/11/2020
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 06/12/2020
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 09/23/2020
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 06/22/2020
Type: Wood Frame
Result: Cancelled
Status: Issued
Date: 06/24/2020
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 09/23/2020
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 04/26/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/22/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 07/21/2020
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 09/30/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 10/07/2020
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 10/20/2020
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 10/21/2020
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 02/02/2021
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 11/04/2020
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 11/12/2020
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 11/17/2020
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 11/23/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 12/03/2020
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 12/03/2020
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 12/18/2020
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 12/17/2020
Type: Interior/Exterior Lathing
Result: Not Ready for Inspection
Status: Issued
Date: 04/17/2021
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 04/17/2021
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 06/07/2021
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 07/12/2021
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 12/23/2021
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 11/08/2021
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 11/08/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/24/2022
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 04/19/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/12/2022
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 05/27/2022
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 01/04/2023
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 01/04/2023
Type: Verify Rec and Parks Fee Memo
Result: Not Ready for Inspection
Status: Issued
Date: 10/05/2023
Type: Electrical Verification
Result: CofO on Hold
Status: Issued
Date: 10/05/2023
Type: Fire Sprinkler Verification
Result: OK for CofO
Status: Issued
Date: 10/05/2023
Type: Plumbing Verification
Result: CofO on Hold
Status: Issued
Date: 10/16/2023
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 10/16/2023
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 10/23/2023
Type: Green Code Verification
Result: OK for CofO
Status: CofO in Progress
Date: 10/23/2023
Type: Green Building Final
Result: Approved
Status: CofO in Progress
Date: 10/23/2023
Type: CofO Issuance
Result: CofO in Progress
Status: CofO in Progress
Date: 10/23/2023
Type: Final
Result: OK to Issue CofO
Status: CofO in Progress
Date: 11/13/2023
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 11/13/2023
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 11/13/2023
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 08/31/2023
Type: Pressure Vessel Verification
Result: Not Applicable
Status: Issued
Date: 08/30/2023
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 08/30/2023
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 09/01/2023
Type: Green Code Verification
Result: Insp Scheduled
Status: Issued
Date: 08/30/2023
Type: Reinforced Concrete Frame
Result: Approved
Status: Issued
Date: 08/30/2023
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 08/31/2023
Type: Heat,Vent,A/C Verification
Result: OK for CofO
Status: Issued
Date: 08/30/2023
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 08/31/2023
Type: Fire Sprinkler Verification
Result: CofO on Hold
Status: Issued
Date: 08/31/2023
Type: Grading Verification
Result: OK for CofO
Status: Issued
Date: 08/30/2023
Type: Structural Steel Frame
Result: Approved
Status: Issued
Date: 08/30/2023
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: Issued
Date: 08/30/2023
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 08/31/2023
Type: Elevator Verification
Result: OK for CofO
Status: Issued
Date: 08/31/2023
Type: Electrical Verification
Result: CofO on Hold
Status: Issued
Date: 08/30/2023
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 08/31/2023
Type: Plumbing Verification
Result: CofO on Hold
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
FOCUS BUILDERS INC

License number: 990023
Type: B
Phone: Speak with a Permit Expert
Location: LOS ANGELES, CA

Permit Applicant

Principal: NORMAN JOEL SALTER

Type:

Address: 1544 20TH ST., SANTA MONICA, CA

Phone:

Experience: years

Applicant: SANDRA LOZANO