Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

NEW 3-STORY DUPLEX WITH ATTACHED GARAGE AT FRONT OF LOT

Inspection Activity
Date: 05/23/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 05/21/2018
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 05/21/2018
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 05/23/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 05/21/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 05/21/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 05/29/2018
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 06/01/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 05/29/2018
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 05/29/2018
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 05/29/2018
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 06/01/2018
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 06/01/2018
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 06/01/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 06/12/2018
Type: Underground Mechanical
Result: Partial Inspection
Status: Issued
Date: 06/12/2018
Type: Underground Mechanical
Result: Partial Inspection
Status: Issued
Date: 06/25/2018
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 06/25/2018
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 04/06/2018
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 07/24/2018
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 07/24/2018
Type: Underground Mechanical
Result: Partial Approval
Status: Issued
Date: 07/24/2018
Type: Underground Mechanical
Result: Partial Approval
Status: Issued
Date: 07/24/2018
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 07/24/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 07/24/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 07/31/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 08/01/2018
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 07/31/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 07/30/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 07/30/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 08/01/2018
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 08/13/2018
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Cancelled
Status: Issued
Date: 08/13/2018
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Cancelled
Status: Issued
Date: 08/28/2018
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 08/28/2018
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/03/2018
Type: Underground Mechanical
Result: Partial Inspection
Status: Issued
Date: 10/03/2018
Type: Underground Mechanical
Result: Partial Inspection
Status: Issued
Date: 10/01/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 10/01/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 10/16/2018
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/16/2018
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 11/06/2018
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 11/06/2018
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 01/10/2019
Type: ELECTRICAL-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/10/2019
Type: PLUMBING-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/10/2019
Type: PLUMBING-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/10/2019
Type: ELECTRICAL-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/14/2019
Type: PLUMBING-Rough
Result: No Access for Inspection
Status: Issued
Date: 01/14/2019
Type: PLUMBING-Rough
Result: No Access for Inspection
Status: Issued
Date: 01/28/2019
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 02/01/2019
Type: PLUMBING-Rough
Result: Approved
Status: Issued
Date: 01/28/2019
Type: PLUMBING-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/28/2019
Type: PLUMBING-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 02/01/2019
Type: PLUMBING-Rough
Result: Approved
Status: Issued
Date: 01/28/2019
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 02/01/2019
Type: ELECTRICAL-Rough
Result: Approved
Status: Issued
Date: 02/01/2019
Type: ELECTRICAL-Rough
Result: Approved
Status: Issued
Date: 12/02/2019
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 12/02/2019
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 02/08/2019
Type: HVAC-Rough
Result: Insp Scheduled
Status: Issued
Date: 02/08/2019
Type: HVAC-Rough
Result: Insp Scheduled
Status: Issued
Date: 02/11/2019
Type: Rough-Elec/Plmb/HVAC
Result: Approved
Status: Issued
Date: 02/11/2019
Type: Rough-Elec/Plmb/HVAC
Result: Approved
Status: Issued
Date: 12/02/2019
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 12/02/2019
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 12/02/2019
Type: Service/Power Release
Result: Not Ready for Inspection
Status: Issued
Date: 12/02/2019
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 12/02/2019
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 12/02/2019
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 12/02/2019
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 12/02/2019
Type: Structural Steel Frame
Result: Approved
Status: Issued
Date: 12/02/2019
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 12/02/2019
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 12/02/2019
Type: Structural Steel Frame
Result: Approved
Status: Issued
Date: 12/02/2019
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 12/02/2019
Type: MERV13>=Final
Result: Not Ready for Inspection
Status: Issued
Date: 12/02/2019
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 12/02/2019
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 12/02/2019
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 12/02/2019
Type: MERV13>=Final
Result: Not Ready for Inspection
Status: Issued
Date: 12/02/2019
Type: Service/Power Release
Result: Not Ready for Inspection
Status: Issued
Date: 02/28/2019
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 02/28/2019
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 02/28/2019
Type: BUILDING-Rough-Frame
Result: Corrections Issued
Status: Issued
Date: 02/28/2019
Type: BUILDING-Rough-Frame
Result: Corrections Issued
Status: Issued
Date: 02/28/2019
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 02/28/2019
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/01/2019
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 02/28/2019
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/01/2019
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 02/28/2019
Type: MERV13>=Rough
Result: Approved
Status: Issued
Date: 02/28/2019
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 02/28/2019
Type: MERV13>=Rough
Result: Approved
Status: Issued
Date: 03/05/2019
Type: Insulation
Result: Corrections Issued
Status: Issued
Date: 03/05/2019
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 03/05/2019
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 03/05/2019
Type: Insulation
Result: Corrections Issued
Status: Issued
Date: 03/12/2019
Type: Interior/Exterior Lathing
Result: Not Ready for Inspection
Status: Issued
Date: 03/12/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/12/2019
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 03/12/2019
Type: Interior/Exterior Lathing
Result: Not Ready for Inspection
Status: Issued
Date: 03/12/2019
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 03/12/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/26/2019
Type: BUILDING-Rough-Frame
Result: Partial Inspection
Status: Issued
Date: 03/26/2019
Type: BUILDING-Rough-Frame
Result: Partial Inspection
Status: Issued
Date: 04/05/2019
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 04/01/2019
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 04/05/2019
Type: BUILDING-Rough-Frame
Result: Insp Scheduled
Status: Issued
Date: 04/05/2019
Type: BUILDING-Rough-Frame
Result: Insp Scheduled
Status: Issued
Date: 04/05/2019
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 04/01/2019
Type: BUILDING-Rough-Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/01/2019
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 04/01/2019
Type: BUILDING-Rough-Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/08/2019
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 04/08/2019
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 12/18/2019
Type: PLUMBING-Final
Result: Corrections Issued
Status: Issued
Date: 12/16/2019
Type: ELECTRICAL-Final
Result: Insp Cancelled
Status: Issued
Date: 12/16/2019
Type: ELECTRICAL-Final
Result: Insp Cancelled
Status: Issued
Date: 12/18/2019
Type: PLUMBING-Final
Result: Corrections Issued
Status: Issued
Date: 05/13/2019
Type: BUILDING-Rough-Frame
Result: Approved
Status: Issued
Date: 05/13/2019
Type: BUILDING-Rough-Frame
Result: Approved
Status: Issued
Date: 05/13/2019
Type: Wood Frame
Result: Approved
Status: Issued
Date: 05/13/2019
Type: Wood Frame
Result: Approved
Status: Issued
Date: 01/07/2020
Type: PLUMBING-Final
Result: Not Ready for Inspection
Status: Issued
Date: 01/07/2020
Type: PLUMBING-Final
Result: Not Ready for Inspection
Status: Issued
Date: 01/13/2020
Type: Final
Result: Corrections Issued
Status: Issued
Date: 01/16/2020
Type: PLUMBING-Final
Result: Insp Cancelled
Status: Issued
Date: 01/13/2020
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 01/16/2020
Type: ELECTRICAL-Final
Result: Insp Cancelled
Status: Issued
Date: 01/14/2020
Type: Fire Sprinkler Verification
Result: OK for CofO
Status: Issued
Date: 01/14/2020
Type: Fire Sprinkler Verification
Result: OK for CofO
Status: Issued
Date: 01/16/2020
Type: HVAC-Final
Result: Insp Cancelled
Status: Issued
Date: 01/16/2020
Type: PLUMBING-Final
Result: Insp Cancelled
Status: Issued
Date: 01/13/2020
Type: MERV13>=Final
Result: Not Ready for Inspection
Status: Issued
Date: 01/13/2020
Type: Service/Power Release
Result: Not Ready for Inspection
Status: Issued
Date: 01/13/2020
Type: Service/Power Release
Result: Not Ready for Inspection
Status: Issued
Date: 01/13/2020
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: Issued
Date: 01/13/2020
Type: Green Building Final
Result: Approved
Status: Issued
Date: 01/16/2020
Type: HVAC-Final
Result: Insp Cancelled
Status: Issued
Date: 01/13/2020
Type: MERV13>=Final
Result: Not Ready for Inspection
Status: Issued
Date: 01/13/2020
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 01/13/2020
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: Issued
Date: 01/16/2020
Type: ELECTRICAL-Final
Result: Insp Cancelled
Status: Issued
Date: 01/13/2020
Type: Green Building Final
Result: Approved
Status: Issued
Date: 01/13/2020
Type: Final
Result: Corrections Issued
Status: Issued
Date: 01/24/2020
Type: ELECTRICAL-Final
Result: Insp Scheduled
Status: Issued
Date: 01/21/2020
Type: PLUMBING-Final
Result: Approved
Status: Issued
Date: 01/21/2020
Type: PLUMBING-Final
Result: Approved
Status: Issued
Date: 01/24/2020
Type: HVAC-Final
Result: Insp Scheduled
Status: Issued
Date: 01/24/2020
Type: ELECTRICAL-Final
Result: Insp Scheduled
Status: Issued
Date: 01/21/2020
Type: Service/Power Release
Result: Not Ready for Inspection
Status: Issued
Date: 01/24/2020
Type: HVAC-Final
Result: Insp Scheduled
Status: Issued
Date: 01/21/2020
Type: MERV13>=Final
Result: Approved
Status: Issued
Date: 01/21/2020
Type: Service/Power Release
Result: Not Ready for Inspection
Status: Issued
Date: 01/21/2020
Type: MERV13>=Final
Result: Approved
Status: Issued
Date: 01/29/2020
Type: Final
Result: Conditional Approval
Status: Issued
Date: 01/29/2020
Type: Service/Power Release
Result: Approved
Status: Issued
Date: 01/29/2020
Type: Final
Result: Conditional Approval
Status: Issued
Date: 01/29/2020
Type: Service/Power Release
Result: Approved
Status: Issued
Date: 02/05/2020
Type: Public Counter
Result: Completed
Status: Issued
Date: 02/05/2020
Type: Public Counter
Result: Completed
Status: Issued
Date: 02/12/2020
Type: Inspection
Result: OK for CofO
Status: CofO in Progress
Date: 02/12/2020
Type: CofO Issuance
Result: CofO in Progress
Status: CofO in Progress
Date: 02/12/2020
Type: CofO Issuance
Result: CofO in Progress
Status: CofO in Progress
Date: 02/12/2020
Type: Inspection
Result: OK for CofO
Status: CofO in Progress
Date: 03/04/2020
Type: CofO Issuance
Result: CofO in Progress
Status: CofO in Progress
Date: 03/04/2020
Type: CofO Issuance
Result: CofO in Progress
Status: CofO in Progress
Date: 03/14/2020
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 03/14/2020
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 03/14/2020
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
V C CONSTRUCTION & DEVELOPMENT

License number: 959583
Type: B
Phone: Speak with a Permit Expert
Location: DIAMOND BAR, CA

Permit Applicant

Principal: VICENTE HORACIO CHUNG

Type:

Address: 326 N BREED ST, LOS ANGELES CA

Phone:

Experience: years

Applicant: LORENZO VARELA