Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

Inspection Activity
Date: 04/06/2017
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 04/20/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/21/2017
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 04/24/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/25/2017
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 04/28/2017
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 04/27/2017
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 04/26/2017
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 04/26/2017
Type: Piling/Pier/Caisson
Result: Not Ready for Inspection
Status: Issued
Date: 05/04/2017
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 05/04/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/02/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/05/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/01/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/10/2017
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 05/12/2017
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 05/15/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/22/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/30/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/02/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/01/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/30/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/31/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/01/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/31/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/02/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 06/05/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/06/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/08/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/07/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/05/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/09/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 06/07/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/06/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/09/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/08/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/15/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/14/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/14/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 06/13/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/15/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/13/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/16/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/16/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 06/26/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/27/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/27/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/26/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/04/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/06/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/02/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/03/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/06/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/05/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/05/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/04/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/03/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/02/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/23/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/25/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/25/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/26/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/23/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/26/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/24/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/24/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/23/2017
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/27/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/27/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/30/2017
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/01/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/31/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/02/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/30/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/03/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 11/15/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/16/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/14/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/16/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/17/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 11/14/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/17/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 11/15/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/21/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/22/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 11/22/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 11/21/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/04/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/05/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/07/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/08/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 12/06/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/08/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 12/06/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/07/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/05/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/04/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/14/2017
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 12/14/2017
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 12/21/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/19/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/18/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/22/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 12/20/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/26/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/29/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 12/27/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/29/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 12/26/2017
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/28/2017
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 12/27/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/08/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/08/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/06/2018
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 06/06/2018
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 06/06/2018
Type: SGSOV-Seismic Gas S/O Valve
Result: Insp Scheduled
Status: Issued
Date: 06/06/2018
Type: Smoke Detectors
Result: Insp Scheduled
Status: Issued
Date: 06/06/2018
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 06/06/2018
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 06/06/2018
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 06/06/2018
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 12/28/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 02/20/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/20/2018
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 06/20/2018
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 06/20/2018
Type: Electrical Verification
Result: CofO on Hold
Status: Issued
Date: 06/20/2018
Type: Green Building Final
Result: Approved
Status: Issued
Date: 06/20/2018
Type: Final
Result: Partial Inspection
Status: Issued
Date: 06/20/2018
Type: Plumbing Verification
Result: CofO on Hold
Status: Issued
Date: 06/21/2018
Type: Heat,Vent,A/C Verification
Result: CofO on Hold
Status: Issued
Date: 06/20/2018
Type: Fire Sprinkler Verification
Result: CofO on Hold
Status: Issued
Date: 07/19/2018
Type: TCO Electrical Verification
Result: Completed (special insp)
Status: Issued
Date: 07/20/2018
Type: TCO Plumbing Verification
Result: Insp Scheduled
Status: Issued
Date: 07/19/2018
Type: TCO Sprinkler Verification
Result: Completed (special insp)
Status: Issued
Date: 07/19/2018
Type: TCO Heat,Vent,A/C Verification
Result: Completed (special insp)
Status: Issued
Date: 07/08/2019
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 07/09/2019
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Date: 07/09/2019
Type: TCO Electrical Verification
Result: Insp Scheduled
Status: Issued
Date: 07/09/2019
Type: TCO Heat,Vent,A/C Verification
Result: Completed (special insp)
Status: Issued
Date: 07/23/2018
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 07/23/2018
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 07/27/2018
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Date: 07/23/2018
Type: TCO Sprinkler Verification
Result: Completed (special insp)
Status: Issued
Date: 07/23/2018
Type: Final
Result: Partial Inspection
Status: Issued
Date: 07/17/2019
Type: Plumbing Verification
Result: OK for CofO
Status: Issued
Date: 07/17/2019
Type: Heat,Vent,A/C Verification
Result: Not Applicable
Status: Issued
Date: 07/17/2019
Type: Electrical Verification
Result: OK for CofO
Status: Issued
Date: 07/23/2019
Type: TCO Electrical Verification
Result: Insp Scheduled
Status: Issued
Date: 12/28/2018
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 01/09/2019
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Date: 01/08/2019
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 01/09/2019
Type: TCO Heat,Vent,A/C Verification
Result: Completed (special insp)
Status: Issued
Date: 01/09/2019
Type: TCO Sprinkler Verification
Result: Completed (special insp)
Status: Issued
Date: 01/09/2019
Type: TCO Electrical Verification
Result: Completed (special insp)
Status: Issued
Date: 01/07/2020
Type: Special/Order Compliance
Result: No Access for Inspection
Status: Issued
Date: 09/17/2020
Type: Final
Result: Insp Cancelled
Status: Issued
Date: 06/12/2020
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 09/21/2020
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 09/21/2020
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 02/04/2021
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 12/10/2020
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 06/09/2021
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 09/13/2021
Type: Final
Result: Conditional Approval
Status: CofO in Progress
Date: 09/13/2021
Type: Inspection
Result: OK for CofO
Status: CofO in Progress
Date: 09/13/2021
Type: CofO Issuance
Result: CofO in Progress
Status: CofO in Progress
Date: 07/15/2021
Type: Final
Result: Conditional Approval
Status: Issued
Date: 10/04/2021
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 10/04/2021
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 10/04/2021
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
VIOLE' T CONSTRUCTION CO INC

License number: 283354
Type: B
Phone: Speak with a Permit Expert
Location: TARZANA, CA

Permit Applicant

Principal: TIMOTHY VIOLE'

Type:

Address: 8557 HIGUERA ST.

Phone:

Experience: years

Applicant: RAUL GARCIA