Bldg-Alter/Repair Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

Supplemental permit to: 16010-10000-02652. 104 Auger Grouted Piles fo

Inspection Activity
Date: 05/01/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/03/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/01/2017
Type: Piling/Pier/Caisson
Result: Partial Inspection
Status: Issued
Date: 05/05/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/04/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/02/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/10/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/08/2017
Type: Piling/Pier/Caisson
Result: Partial Inspection
Status: Issued
Date: 05/11/2017
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 05/19/2017
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 05/15/2017
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 05/15/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/23/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/24/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/26/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/25/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/24/2017
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/23/2017
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 06/02/2017
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 05/31/2017
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/30/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/01/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/02/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/31/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/30/2017
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 06/09/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/06/2017
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 06/07/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/05/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/06/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/08/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/06/2017
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/12/2017
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/16/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/16/2017
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 06/13/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/12/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/14/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/15/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/16/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 06/27/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/29/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/26/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/26/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/30/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/28/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/26/2017
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 10/06/2017
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 10/05/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/05/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/04/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/03/2017
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 10/03/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/06/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/04/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/06/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/05/2017
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/04/2017
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/04/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 10/02/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/04/2017
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 10/05/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/02/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/04/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/03/2017
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/03/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/03/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/06/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/02/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/03/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/11/2017
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/13/2017
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 10/10/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/11/2017
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 10/12/2017
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/11/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/11/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/12/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/13/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/11/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/11/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/10/2017
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/12/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/12/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/10/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/13/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/11/2017
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 10/10/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/13/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/19/2017
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 10/18/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/20/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/18/2017
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 10/16/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/16/2017
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 10/18/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/19/2017
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 10/16/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/18/2017
Type: Masonry Wall/Backfill
Result: Not Ready for Inspection
Status: Issued
Date: 10/19/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/19/2017
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/16/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/20/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/19/2017
Type: Deputy Pre-Stress Concrete
Result: Partial Approval
Status: Issued
Date: 10/16/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 10/20/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/18/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/17/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/16/2017
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/17/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/17/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/17/2017
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/16/2017
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 10/25/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/26/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/24/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/26/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/26/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/24/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/23/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/23/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/23/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/25/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/27/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/27/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/24/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/27/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/25/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/03/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/30/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/03/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 11/02/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/02/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/03/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/30/2017
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 10/30/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/01/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/01/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/30/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/01/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/02/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/09/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/06/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/09/2017
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/09/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 11/07/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/07/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/06/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/06/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/07/2017
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/14/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/13/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/13/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/16/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/14/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/16/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/15/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/15/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/21/2017
Type: Deputy Reinf. Concrete
Result: No Access for Inspection
Status: Issued
Date: 11/22/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/01/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/30/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/28/2017
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/29/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/28/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/28/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/04/2017
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 12/04/2017
Type: Grading Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 12/14/2017
Type: Final
Result: Partial Inspection
Status: Issued
Date: 12/13/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/14/2017
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 12/12/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/15/2017
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 12/11/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/12/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/13/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/11/2017
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/01/2018
Type: Final
Result: Permit Finaled
Status: Permit Finaled
Date: 02/28/2018
Type: Final
Result: Cancelled
Status: Permit Finaled
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
D P R CONSTRUCTION INC

License number: 599846
Type: B
Phone: Speak with a Permit Expert
Location: REDWOOD CITY, CA

Permit Applicant

Principal: PETER COLE NOSLER

Type:

Address: 8811 RESEARCH DR STE 200, IRVINE, CA

Phone:

Experience: years

Applicant: JAVIER HERNANDEZ