Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

4- STORY /WITH LOFT 32 UNIT APT WITH 1-LEVEL SUBTERRANIAN & 1-LEVEL

Inspection Activity
Date: 04/04/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/03/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/03/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/05/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/05/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/05/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/04/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/04/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 05/05/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/04/2017
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 05/12/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 05/09/2017
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 05/12/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/12/2017
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/08/2017
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 05/12/2017
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 05/12/2017
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 05/12/2017
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 05/16/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/18/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/16/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/17/2017
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 05/17/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/19/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/15/2017
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 05/15/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/19/2017
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/22/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/23/2017
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 06/08/2017
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/08/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/09/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 06/08/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/09/2017
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 06/16/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 06/16/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/15/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/16/2017
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 06/28/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/30/2017
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/10/2017
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 10/10/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/24/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/24/2017
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 10/24/2017
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 11/03/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 11/03/2017
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 11/06/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 11/07/2017
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 11/06/2017
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 11/07/2017
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 04/20/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 04/20/2018
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 11/13/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 11/14/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 11/21/2017
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 11/21/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 11/27/2017
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 12/01/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 11/29/2017
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 11/29/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 11/28/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 12/01/2017
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 12/05/2017
Type: Drywall Nailing
Result: Conditional Approval
Status: Issued
Date: 12/07/2017
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 12/08/2017
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 12/05/2017
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 12/06/2017
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 12/06/2017
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 12/06/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 12/07/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 05/18/2018
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 12/14/2017
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 12/14/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 12/14/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 12/13/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 12/14/2017
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 12/11/2017
Type: Drywall Nailing
Result: Corrections Issued
Status: Issued
Date: 12/13/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 12/18/2017
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 12/22/2017
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 12/22/2017
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 12/21/2017
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 12/18/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 12/22/2017
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 12/21/2017
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 12/27/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 12/26/2017
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/02/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/04/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/09/2018
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 01/09/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/01/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 01/16/2018
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/16/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 01/22/2018
Type: Insulation
Result: Cancelled
Status: Issued
Date: 01/25/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/23/2018
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 01/22/2018
Type: Interior/Exterior Lathing
Result: Cancelled
Status: Issued
Date: 01/22/2018
Type: Light Gage Steel Frame
Result: Cancelled
Status: Issued
Date: 12/26/2017
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 02/02/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 02/01/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/02/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/01/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/30/2018
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 01/30/2018
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 02/02/2018
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 01/30/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/05/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/06/2018
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 02/06/2018
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 02/16/2018
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 02/12/2018
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 02/16/2018
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 02/14/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 02/12/2018
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 02/21/2018
Type: Drywall Nailing
Result: No Access for Inspection
Status: Issued
Date: 02/21/2018
Type: Insulation
Result: No Access for Inspection
Status: Issued
Date: 03/01/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/26/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/01/2018
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 02/26/2018
Type: Interior/Exterior Lathing
Result: Not Ready for Inspection
Status: Issued
Date: 03/01/2018
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 03/01/2018
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 03/09/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 03/06/2018
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/06/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/05/2018
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 03/08/2018
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 03/05/2018
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 03/05/2018
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 03/13/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 03/13/2018
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 03/20/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/22/2018
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 03/20/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 03/28/2018
Type: Interior/Exterior Lathing
Result: Not Ready for Inspection
Status: Issued
Date: 03/29/2018
Type: Interior/Exterior Lathing
Result: Not Ready for Inspection
Status: Issued
Date: 03/29/2018
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 02/26/2018
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/06/2018
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 04/06/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 04/03/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 04/04/2018
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 04/04/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/03/2018
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 04/09/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/11/2018
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 04/09/2018
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 04/10/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/09/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/11/2018
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 04/09/2018
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 04/10/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/20/2018
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 07/30/2018
Type: Interior/Exterior Lathing
Result: Approved
Status: Issued
Date: 07/30/2018
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 10/12/2018
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 10/23/2018
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 10/23/2018
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 10/23/2018
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 10/23/2018
Type: Green Building Final
Result: Approved
Status: Issued
Date: 10/23/2018
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 10/23/2018
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 10/23/2018
Type: Reinforced Masonry Frame
Result: Partial Inspection
Status: Issued
Date: 10/23/2018
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 11/15/2018
Type: Heat,Vent,A/C Verification
Result: OK for CofO
Status: Issued
Date: 11/15/2018
Type: Plumbing Verification
Result: Pending
Status: Issued
Date: 11/15/2018
Type: Final
Result: Partial Approval
Status: Issued
Date: 11/15/2018
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 11/15/2018
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: Issued
Date: 11/15/2018
Type: Reinforced Concrete Frame
Result: Approved
Status: Issued
Date: 11/15/2018
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 11/15/2018
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 11/15/2018
Type: Electrical Verification
Result: OK for CofO
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
JASCO ENTERPRISE INC

License number: 871467
Type: B
Phone: Speak with a Permit Expert
Location: VALLEY VILLAGE, CA

Permit Applicant

Principal: SHLOMI ASISS

Type:

Address: 12439 MAGNOLIA BL, 185, VALLEY VILLAGE

Phone:

Experience: years

Applicant: SHLOMI