Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

NEW SINGLE FAMILY DWELLING WITH ATTACHED GARAGE. (SEE COMMENT)

Inspection Activity
Date: 10/19/2017
Type: Deputy Grading
Result: Approved
Status: Issued
Date: 10/20/2017
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 05/31/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 04/20/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 04/16/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/18/2018
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 04/18/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/09/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/06/2017
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 04/18/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/18/2018
Type: PLUMBING-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 11/15/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/15/2017
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/13/2017
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 11/14/2017
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 05/01/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 05/03/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/04/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/02/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 05/03/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 12/01/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 11/29/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/25/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/15/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/11/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/20/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/25/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Cancelled
Status: Issued
Date: 01/05/2018
Type: PLUMBING-Rough
Result: Partial Inspection
Status: Issued
Date: 05/30/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/31/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/30/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/31/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/31/2018
Type: ELECTRICAL-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/31/2018
Type: PLUMBING-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/30/2018
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 05/31/2018
Type: HVAC-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 06/18/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 01/23/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 01/24/2018
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 06/04/2018
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 06/04/2018
Type: HVAC-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 06/04/2018
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 01/29/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 01/31/2018
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 06/04/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/18/2019
Type: Deputy Other (see comments)
Result: Partial Approval
Status: Issued
Date: 06/20/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/06/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/07/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/06/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 02/06/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/14/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 06/13/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/15/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Approved
Status: Issued
Date: 02/16/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/14/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 02/14/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/14/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/19/2020
Type: HVAC-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 02/20/2018
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 02/20/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 02/20/2018
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 02/20/2018
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 06/22/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Approved
Status: Issued
Date: 03/02/2018
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 03/02/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 02/27/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 02/27/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/27/2018
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 06/22/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 03/09/2018
Type: Underground Mechanical
Result: Partial Approval
Status: Issued
Date: 03/05/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/11/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/13/2018
Type: Underground Mechanical
Result: Approved
Status: Issued
Date: 03/14/2018
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 03/14/2018
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 06/29/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 06/29/2018
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 06/26/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/23/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 03/22/2018
Type: Excavation/Setback/Form/Re-Bar
Result: No Access for Inspection
Status: Issued
Date: 10/31/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/28/2018
Type: Underground Mechanical
Result: Partial Approval
Status: Issued
Date: 03/28/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 07/02/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 07/06/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 07/02/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/06/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 07/02/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/12/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/09/2018
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 04/09/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/13/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 04/12/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 04/13/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/13/2018
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 07/12/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/12/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/09/2018
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 04/09/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/13/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 04/12/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 04/13/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/12/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 07/20/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 07/20/2018
Type: PLUMBING-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 07/27/2018
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 07/24/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 07/26/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 07/24/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 07/23/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 08/02/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 07/15/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/15/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 08/09/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 07/16/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 07/22/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/25/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/23/2018
Type: Excavation/Setback/Form/Re-Bar
Result: No Access for Inspection
Status: Issued
Date: 08/19/2020
Type: PLUMBING-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 08/19/2020
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 08/19/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 07/29/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 09/13/2018
Type: ELECTRICAL-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 09/13/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/08/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/09/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 08/08/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/02/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 10/05/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/04/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/02/2018
Type: ELECTRICAL-Rough
Result: Insp Scheduled
Status: Issued
Date: 04/10/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/10/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/09/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 12/22/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/26/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 11/22/2019
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 11/22/2019
Type: HVAC-Rough
Result: Partial Approval
Status: Issued
Date: 08/29/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 11/22/2019
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 11/22/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 12/27/2018
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 01/09/2019
Type: ELECTRICAL-Rough
Result: Partial Inspection
Status: Issued
Date: 01/09/2019
Type: PLUMBING-Rough
Result: Partial Inspection
Status: Issued
Date: 01/09/2019
Type: Sewer
Result: Partial Inspection
Status: Issued
Date: 01/25/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/25/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 02/04/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 02/12/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/11/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/06/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 02/28/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/20/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/20/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 03/13/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/18/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/28/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/29/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/01/2019
Type: Sewer
Result: Partial Approval
Status: Issued
Date: 04/01/2019
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 12/31/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 12/31/2020
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/15/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/25/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/26/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/03/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/03/2019
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 05/08/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/15/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/17/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/24/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 01/07/2020
Type: Underground Mechanical
Result: Partial Approval
Status: Issued
Date: 01/22/2020
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 01/22/2020
Type: Gas Test
Result: Partial Approval
Status: Issued
Date: 01/22/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 09/08/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 01/29/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 09/11/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 02/06/2020
Type: Underground Mechanical
Result: Partial Approval
Status: Issued
Date: 02/06/2020
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 01/07/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/10/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/10/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/26/2020
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 05/26/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/28/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/05/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/05/2020
Type: Sewer
Result: Not Ready for Inspection
Status: Issued
Date: 03/05/2020
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 03/05/2020
Type: ELECTRICAL-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 08/11/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 03/09/2020
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 03/09/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/11/2021
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 06/26/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 06/26/2020
Type: ELECTRICAL-Rough
Result: Insp Scheduled
Status: Issued
Date: 07/10/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 07/20/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 07/20/2020
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 07/20/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 09/29/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/01/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/07/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 10/09/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/11/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 11/23/2021
Type: Sewer
Result: Approved
Status: Issued
Date: 10/22/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/04/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/17/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/02/2020
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 12/02/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 12/07/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/18/2021
Type: HVAC-Rough
Result: Partial Approval
Status: Issued
Date: 12/02/2021
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 11/30/2021
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 03/05/2021
Type: Deputy Wood Construction
Result: No Access for Inspection
Status: Issued
Date: 03/09/2021
Type: BUILDING-Rough-Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/09/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 03/09/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 03/09/2021
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 06/30/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 09/16/2021
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 09/17/2021
Type: PLUMBING-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 09/15/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/15/2021
Type: Sewer
Result: Partial Approval
Status: Issued
Date: 06/10/2022
Type: ELECTRICAL-Rough
Result: Insp Scheduled
Status: Issued
Date: 09/23/2021
Type: PLUMBING-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 09/20/2021
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 09/22/2021
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 09/20/2021
Type: Sewer
Result: Not Ready for Inspection
Status: Issued
Date: 09/24/2021
Type: PLUMBING-Rough
Result: Insp Scheduled
Status: Issued
Date: 09/21/2021
Type: PLUMBING-Rough
Result: Insp Cancelled
Status: Issued
Date: 03/10/2022
Type: HVAC-Rough
Result: Partial Approval
Status: Issued
Date: 12/16/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 12/16/2021
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 12/16/2021
Type: BUILDING-Rough-Frame
Result: Not Ready for Inspection
Status: Issued
Date: 12/17/2021
Type: HVAC-Rough
Result: Insp Cancelled
Status: Issued
Date: 08/05/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 12/16/2021
Type: HVAC-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 09/27/2021
Type: PLUMBING-Rough
Result: Corrections Issued
Status: Issued
Date: 09/30/2021
Type: PLUMBING-Rough
Result: Partial Inspection
Status: Issued
Date: 09/28/2021
Type: PLUMBING-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 10/07/2021
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 10/05/2021
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 10/05/2021
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 10/07/2021
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 12/22/2021
Type: BUILDING-Rough-Frame
Result: Insp Cancelled
Status: Issued
Date: 12/22/2021
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 12/20/2021
Type: HVAC-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 12/22/2021
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 11/15/2021
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 06/15/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 06/15/2022
Type: BUILDING-Rough-Frame
Result: Conditional Approval
Status: Issued
Date: 06/13/2022
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 06/14/2022
Type: HVAC-Rough
Result: Partial Approval
Status: Issued
Date: 02/03/2022
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 02/03/2022
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/13/2022
Type: HVAC-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 06/15/2022
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 12/23/2022
Type: Public Counter
Result: Completed
Status: Issued
Date: 12/20/2022
Type: ELECTRICAL-Rough
Result: Partial Inspection
Status: Issued
Date: 02/17/2022
Type: Service/Power Release
Result: Not Ready for Inspection
Status: Issued
Date: 02/24/2022
Type: Shower Pan
Result: Approved
Status: Issued
Date: 02/24/2022
Type: Service/Power Release
Result: Partial Inspection
Status: Issued
Date: 02/25/2022
Type: Shower Pan
Result: Approved
Status: Issued
Date: 06/23/2022
Type: HVAC-Rough
Result: Partial Approval
Status: Issued
Date: 06/23/2022
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 06/27/2022
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/30/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/10/2023
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 05/03/2022
Type: Shower Pan
Result: Approved
Status: Issued
Date: 12/29/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/05/2023
Type: Service/Power Release
Result: Approved
Status: Issued
Date: 01/05/2023
Type: ELECTRICAL-Rough
Result: Approved
Status: Issued
Date: 10/06/2022
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 10/20/2022
Type: HVAC-Rough
Result: Partial Approval
Status: Issued
Date: 10/19/2022
Type: HVAC-Rough
Result: Partial Approval
Status: Issued
Date: 12/06/2022
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 12/06/2022
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 12/15/2022
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 02/16/2023
Type: HVAC-Rough
Result: Insp Scheduled
Status: Issued
Date: 02/16/2023
Type: ELECTRICAL-Rough
Result: Insp Scheduled
Status: Issued
Date: 02/13/2023
Type: HVAC-Rough
Result: Corrections Issued
Status: Issued
Date: 05/09/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/09/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/09/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/09/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/26/2023
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 10/26/2023
Type: HVAC-Final
Result: Not Ready for Inspection
Status: Issued
Date: 10/25/2023
Type: PLUMBING-Final
Result: Partial Approval
Status: Issued
Date: 10/26/2023
Type: PLUMBING-Final
Result: Not Ready for Inspection
Status: Issued
Date: 10/25/2023
Type: HVAC-Final
Result: Partial Approval
Status: Issued
Date: 10/26/2023
Type: ELECTRICAL-Final
Result: Not Ready for Inspection
Status: Issued
Date: 10/25/2023
Type: ELECTRICAL-Final
Result: Partial Approval
Status: Issued
Date: 06/21/2023
Type: SUSMP-Std. Urban Storm Water
Result: Approved
Status: Issued
Date: 07/17/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Approved
Status: Issued
Date: 11/20/2023
Type: PLUMBING-Final
Result: Partial Inspection
Status: Issued
Date: 11/20/2023
Type: ELECTRICAL-Final
Result: Partial Inspection
Status: Issued
Date: 11/20/2023
Type: HVAC-Final
Result: Partial Inspection
Status: Issued
Date: 08/31/2023
Type: Final
Result: Partial Inspection
Status: Issued
Date: 08/31/2023
Type: Smoke Detectors
Result: Partial Inspection
Status: Issued
Date: 08/31/2023
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 09/01/2023
Type: Elevator Verification
Result: CofO on Hold
Status: Issued
Date: 08/31/2023
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 08/31/2023
Type: BUILDING-Rough-Frame
Result: Approved
Status: Issued
Date: 09/01/2023
Type: Fire Sprinkler Verification
Result: CofO on Hold
Status: Issued
Date: 08/31/2023
Type: Reinforced Concrete Frame
Result: Approved
Status: Issued
Date: 08/31/2023
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 09/01/2023
Type: Grading Verification
Result: Insp Scheduled
Status: Issued
Date: 08/31/2023
Type: Green Building Final
Result: Partial Inspection
Status: Issued
Date: 01/04/2024
Type: PLUMBING-Final
Result: Approved
Status: Issued
Date: 01/04/2024
Type: ELECTRICAL-Final
Result: Approved
Status: Issued
Date: 01/04/2024
Type: HVAC-Final
Result: Approved
Status: Issued
Date: 01/08/2024
Type: ELECTRICAL-Final
Result: Approved
Status: Issued
Date: 01/08/2024
Type: HVAC-Final
Result: Approved
Status: Issued
Date: 01/08/2024
Type: PLUMBING-Final
Result: Approved
Status: Issued
Date: 03/14/2024
Type: Grading Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
GIBSON CONSTRUCTION

License number: 524012
Type: B
Phone: Speak with a Permit Expert
Location: SANTA MONICA, CA

Permit Applicant

Principal: GORDON SANFORD GIBSON

Type:

Address: 11150 W OLYMPIC BL, 700, L A

Phone:

Experience: years

Applicant: JASON SOMERS