Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

Proposed 3-story sfd with attached 7-car garage <sprinklers req'd

Inspection Activity
Date: 05/31/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/31/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 11/13/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/13/2017
Type: Piling/Pier/Caisson
Result: Not Ready for Inspection
Status: Issued
Date: 11/16/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/03/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/30/2017
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/29/2017
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 10/23/2019
Type: Rough-Elec/Plmb/HVAC
Result: Partial Approval
Status: Issued
Date: 10/23/2019
Type: Shower Pan
Result: Partial Approval
Status: Issued
Date: 12/07/2017
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 12/15/2017
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 12/11/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 06/10/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 12/19/2017
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 05/24/2018
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 10/22/2019
Type: Rough-Elec/Plmb/HVAC
Result: Partial Approval
Status: Issued
Date: 05/31/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/29/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/29/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 01/19/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 01/17/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 06/19/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 01/23/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 01/24/2018
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 01/25/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 06/08/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 06/04/2018
Type: Footing/Foundation/Slab
Result: Conditional Approval
Status: Issued
Date: 06/06/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 06/19/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/13/2018
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 06/13/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 02/21/2018
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 02/23/2018
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 03/01/2018
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 10/28/2019
Type: Rough-Elec/Plmb/HVAC
Result: No Access for Inspection
Status: Issued
Date: 06/19/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/20/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/22/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/10/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 03/13/2018
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 06/29/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 03/19/2018
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 06/26/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/02/2019
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 03/27/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 07/02/2018
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 04/05/2018
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 04/06/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 04/03/2020
Type: Interior/Exterior Lathing
Result: Cancelled
Status: Issued
Date: 07/09/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 08/13/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 07/16/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 07/16/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 11/06/2019
Type: BUILDING-Rough-Frame
Result: Partial Approval
Status: Issued
Date: 11/07/2019
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 11/05/2019
Type: Public Counter
Result: Completed
Status: Issued
Date: 11/09/2019
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 11/07/2019
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 11/04/2019
Type: Shower Pan
Result: No Access for Inspection
Status: Issued
Date: 07/22/2019
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 07/22/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 07/22/2019
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 07/22/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 07/31/2019
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 07/29/2019
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 09/20/2018
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 09/17/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/15/2019
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 08/05/2019
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 08/05/2019
Type: HVAC-Rough
Result: Corrections Issued
Status: Issued
Date: 09/28/2018
Type: HVAC-Rough
Result: Partial Inspection
Status: Issued
Date: 08/06/2019
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 08/06/2019
Type: HVAC-Rough
Result: Insp Scheduled
Status: Issued
Date: 10/10/2018
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 10/11/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/07/2020
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 10/17/2018
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 10/16/2018
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 08/20/2019
Type: Footing/Foundation/Slab
Result: Corrections Issued
Status: Issued
Date: 08/22/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/22/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 10/25/2018
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 11/21/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/21/2019
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 08/28/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 11/16/2018
Type: Underground Mechanical
Result: Insp Scheduled
Status: Issued
Date: 11/16/2018
Type: ELECTRICAL-Rough
Result: Insp Scheduled
Status: Issued
Date: 09/06/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 09/03/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 01/10/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/11/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/09/2019
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 01/09/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/26/2019
Type: HVAC-Rough
Result: Corrections Issued
Status: Issued
Date: 11/26/2019
Type: ELECTRICAL-Rough
Result: Corrections Issued
Status: Issued
Date: 01/22/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 09/12/2019
Type: Shower Pan
Result: Partial Approval
Status: Issued
Date: 08/24/2020
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 12/05/2019
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 09/20/2019
Type: Interior/Exterior Lathing
Result: Insp Cancelled
Status: Issued
Date: 09/17/2019
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 09/19/2019
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 09/17/2019
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 09/19/2019
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 12/02/2019
Type: HVAC-Rough
Result: Partial Approval
Status: Issued
Date: 12/02/2019
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 12/05/2019
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 12/02/2019
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 12/05/2019
Type: BUILDING-Rough-Frame
Result: Partial Approval
Status: Issued
Date: 09/25/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 09/25/2019
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 04/21/2020
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 03/19/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Cancelled
Status: Issued
Date: 03/21/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/03/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 03/29/2019
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 03/28/2019
Type: Footing/Foundation/Slab
Result: Corrections Issued
Status: Issued
Date: 10/10/2019
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 04/04/2019
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/01/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 04/04/2019
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 04/04/2019
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 04/22/2021
Type: HVAC-Final
Result: Approved
Status: Issued
Date: 04/15/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 04/18/2019
Type: Reinforced Concrete Frame
Result: Conditional Approval
Status: Issued
Date: 04/15/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 10/15/2019
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 10/15/2019
Type: Drywall Nailing
Result: Insp Cancelled
Status: Issued
Date: 04/24/2019
Type: PLUMBING-Rough
Result: Corrections Issued
Status: Issued
Date: 04/26/2019
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 12/19/2019
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 12/16/2019
Type: HVAC-Rough
Result: Corrections Issued
Status: Issued
Date: 05/01/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/03/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Corrections Issued
Status: Issued
Date: 12/16/2019
Type: ELECTRICAL-Rough
Result: Corrections Issued
Status: Issued
Date: 12/19/2019
Type: HVAC-Rough
Result: Partial Approval
Status: Issued
Date: 04/29/2020
Type: Shower Pan
Result: Partial Approval
Status: Issued
Date: 04/29/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/09/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/09/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/29/2020
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 01/02/2020
Type: BUILDING-Rough-Frame
Result: Partial Approval
Status: Issued
Date: 12/30/2019
Type: BUILDING-Rough-Frame
Result: Corrections Issued
Status: Issued
Date: 12/30/2019
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 01/02/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/20/2019
Type: Underground Mechanical
Result: Partial Approval
Status: Issued
Date: 01/08/2020
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 01/10/2020
Type: Rough-Elec/Plmb/HVAC
Result: Corrections Issued
Status: Issued
Date: 05/08/2020
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 04/21/2021
Type: HVAC-Final
Result: Partial Approval
Status: Issued
Date: 01/15/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/15/2020
Type: Rough-Elec/Plmb/HVAC
Result: Partial Approval
Status: Issued
Date: 01/17/2020
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 01/23/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/23/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/29/2020
Type: PLUMBING-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/30/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/30/2020
Type: PLUMBING-Rough
Result: Corrections Issued
Status: Issued
Date: 01/30/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/18/2020
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 05/18/2020
Type: HVAC-Rough
Result: Partial Approval
Status: Issued
Date: 02/06/2020
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 02/04/2020
Type: PLUMBING-Rough
Result: Corrections Issued
Status: Issued
Date: 05/18/2020
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 02/11/2020
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 02/21/2020
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 05/26/2020
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 02/27/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/27/2020
Type: Interior/Exterior Lathing
Result: Partial Inspection
Status: Issued
Date: 02/27/2020
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 06/02/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/02/2020
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 03/02/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/02/2020
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 03/09/2020
Type: ELECTRICAL-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/12/2020
Type: ELECTRICAL-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/09/2020
Type: PLUMBING-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/12/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/12/2020
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 06/12/2020
Type: ELECTRICAL-Rough
Result: Partial Inspection
Status: Issued
Date: 03/18/2020
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 03/18/2020
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 03/18/2020
Type: HVAC-Rough
Result: Partial Approval
Status: Issued
Date: 06/16/2020
Type: HVAC-Rough
Result: Partial Inspection
Status: Issued
Date: 06/17/2020
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 09/25/2020
Type: HVAC-Rough
Result: Approved
Status: Issued
Date: 06/22/2020
Type: Service/Power Release
Result: Approved
Status: Issued
Date: 06/26/2020
Type: HVAC-Rough
Result: Partial Approval
Status: Issued
Date: 09/25/2020
Type: HVAC-Rough
Result: Approved
Status: Issued
Date: 01/23/2021
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 10/01/2020
Type: PLUMBING-Rough
Result: Approved
Status: Issued
Date: 10/01/2020
Type: ELECTRICAL-Rough
Result: Approved
Status: Issued
Date: 08/07/2020
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 01/23/2021
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 10/19/2020
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 10/22/2020
Type: Drywall Nailing
Result: Corrections Issued
Status: Issued
Date: 10/19/2020
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 10/19/2020
Type: Insulation
Result: Approved
Status: Issued
Date: 10/19/2020
Type: BUILDING-Rough-Frame
Result: Approved
Status: Issued
Date: 10/19/2020
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 05/07/2021
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 10/29/2020
Type: Drywall Nailing
Result: Corrections Issued
Status: Issued
Date: 10/26/2020
Type: Drywall Nailing
Result: Corrections Issued
Status: Issued
Date: 05/07/2021
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 05/07/2021
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 11/09/2020
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 11/14/2020
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 05/07/2021
Type: SGSOV-Seismic Gas S/O Valve
Result: Insp Scheduled
Status: Issued
Date: 05/07/2021
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 02/10/2021
Type: PLUMBING-Final
Result: Partial Approval
Status: Issued
Date: 02/08/2021
Type: PLUMBING-Final
Result: Corrections Issued
Status: Issued
Date: 05/07/2021
Type: Smoke Detectors
Result: Insp Scheduled
Status: Issued
Date: 05/07/2021
Type: Structural Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 12/16/2020
Type: Shower Pan
Result: Partial Approval
Status: Issued
Date: 02/25/2021
Type: ELECTRICAL-Final
Result: Corrections Issued
Status: Issued
Date: 03/02/2021
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 03/03/2021
Type: ELECTRICAL-Final
Result: Partial Approval
Status: Issued
Date: 05/17/2021
Type: Final
Result: Conditional Approval
Status: Issued
Date: 03/15/2021
Type: PLUMBING-Final
Result: Cancelled
Status: Issued
Date: 03/17/2021
Type: Gas Test
Result: Approved
Status: Issued
Date: 04/15/2021
Type: ELECTRICAL-Final
Result: Approved
Status: Issued
Date: 04/16/2021
Type: HVAC-Final
Result: Insp Scheduled
Status: Issued
Date: 04/16/2021
Type: ELECTRICAL-Final
Result: Insp Scheduled
Status: Issued
Date: 04/12/2021
Type: PLUMBING-Final
Result: Approved
Status: Issued
Date: 09/20/2021
Type: Final
Result: Conditional Approval
Status: Issued
Date: 10/02/2021
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 10/02/2021
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 09/29/2021
Type: CofO Issuance
Result: CofO in Progress
Status: CofO Issued
Date: 10/02/2021
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 09/29/2021
Type: Inspection
Result: OK for CofO
Status: CofO Issued
Date: 09/29/2021
Type: CofO Issuance
Result: CofO in Progress
Status: CofO Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
HOLZ RICHARD INC

License number: 294504
Type: B
Phone: Speak with a Permit Expert
Location: LOS ANGELES, CA

Permit Applicant

Principal: RICHARD HOLZ

Type:

Address: 11150 W OLYMPIC BLVD, LA, CA

Phone:

Experience: years

Applicant: ALEX WHITEHEAD