Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

NEW 103'-4" X 231'-0" IRREGULAR FOUR STORY (TOTAL 38 UNITS) APARTMENT

Inspection Activity
Date: 12/31/2020
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 04/21/2021
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 12/28/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/30/2020
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/22/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/21/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/21/2021
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 08/13/2021
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 08/10/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/27/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/27/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/27/2021
Type: METHANE-Subgrade
Result: Partial Approval
Status: Issued
Date: 04/27/2021
Type: METHANE-Barrier
Result: Partial Approval
Status: Issued
Date: 05/05/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/03/2021
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 05/03/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/07/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 05/06/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 05/03/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/03/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/05/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/03/2021
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 05/06/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/17/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 08/17/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/18/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 05/11/2021
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 05/10/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 05/12/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 12/15/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 05/11/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 05/14/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/14/2021
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 05/13/2021
Type: Reinforced Masonry Frame
Result: Cancelled
Status: Issued
Date: 05/13/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/24/2021
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 02/24/2021
Type: FLOOD-Elevation Certificate
Result: Not Ready for Inspection
Status: Issued
Date: 02/24/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 02/24/2021
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 11/29/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/30/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/30/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/03/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 11/29/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/18/2021
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/19/2021
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 05/21/2021
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 05/18/2021
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 05/21/2021
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 05/17/2021
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 05/21/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 05/18/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/18/2021
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/18/2021
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 05/18/2021
Type: FLOOD-Proofing Certificate
Result: Approved
Status: Issued
Date: 05/20/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 05/25/2021
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 05/27/2021
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/24/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/28/2021
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 05/25/2021
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 05/25/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/27/2021
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/26/2021
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 05/25/2021
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 05/25/2021
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 05/24/2021
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/22/2021
Type: METHANE-Subgrade
Result: Partial Approval
Status: Issued
Date: 03/22/2021
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 03/22/2021
Type: FLOOD-Elevation Certificate
Result: Approved
Status: Issued
Date: 03/22/2021
Type: METHANE-Barrier
Result: Partial Approval
Status: Issued
Date: 03/22/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/25/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/24/2021
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/27/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 08/25/2021
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 12/03/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/02/2021
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 12/02/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 12/02/2021
Type: METHANE-Rough
Result: Approved
Status: Issued
Date: 06/01/2021
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 06/04/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 06/03/2021
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 06/03/2021
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 06/02/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/03/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 06/02/2021
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 08/31/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 09/03/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/30/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/08/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 06/11/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 06/07/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 06/10/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 06/09/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 08/31/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/31/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/08/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 09/08/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 09/08/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/24/2021
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 06/24/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/24/2021
Type: METHANE-Subgrade
Result: Partial Approval
Status: Issued
Date: 06/25/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/24/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 09/08/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/07/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 07/01/2021
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 12/08/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 09/17/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 09/16/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 07/07/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 07/06/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 09/14/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 09/13/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 09/14/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 09/16/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 09/13/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 09/16/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 09/15/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 07/13/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 07/13/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 07/23/2021
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 07/23/2021
Type: METHANE-Subgrade
Result: Insp Scheduled
Status: Issued
Date: 07/23/2021
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 03/09/2022
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 08/06/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/06/2021
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 08/05/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 10/01/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 09/28/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/01/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/11/2022
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/07/2021
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 10/07/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/23/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 10/21/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/18/2021
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 09/02/2022
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 11/12/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 03/16/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 11/15/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/17/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/18/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/15/2022
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/15/2022
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 03/18/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 03/16/2022
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 03/16/2022
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/18/2022
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/21/2022
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/16/2022
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 02/11/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 02/07/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 02/15/2022
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 02/15/2022
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 03/31/2022
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 02/23/2022
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/23/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 09/06/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/19/2022
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 04/26/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 12/23/2022
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 09/16/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 09/16/2022
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 05/17/2022
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 07/15/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 07/11/2022
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/31/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 09/23/2022
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 08/04/2022
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 08/01/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 09/30/2022
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/23/2022
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 10/13/2022
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 01/20/2023
Type: Interior/Exterior Lathing
Result: Approved
Status: Issued
Date: 01/17/2023
Type: Drywall Nailing
Result: No Access for Inspection
Status: Issued
Date: 01/17/2023
Type: Insulation
Result: No Access for Inspection
Status: Issued
Date: 01/19/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/19/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 10/25/2022
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 11/02/2022
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 01/25/2023
Type: Masonry Wall/Backfill
Result: Not Ready for Inspection
Status: Issued
Date: 11/23/2022
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 11/23/2022
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 11/23/2022
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 02/02/2023
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 11/29/2022
Type: Interior/Exterior Lathing
Result: Approved
Status: Issued
Date: 12/16/2022
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 12/16/2022
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 12/16/2022
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 02/13/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/23/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 04/21/2023
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 09/26/2023
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 05/03/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/22/2023
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 06/21/2023
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 06/21/2023
Type: Interior/Exterior Lathing
Result: Approved
Status: Issued
Date: 07/17/2023
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 09/01/2023
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 09/08/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 02/20/2024
Type: Interior/Exterior Lathing
Result: Approved
Status: Issued
Date: 04/11/2024
Type: Footing/Foundation/Slab
Result: Corrections Issued
Status: Issued
Date: 04/26/2024
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 04/23/2024
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
P AND N CONSTRUCTION INC

License number: 800653
Type: B
Phone: Speak with a Permit Expert
Location: BEVERLY HILLS, CA

Permit Applicant

Principal: NASSER MEHDIZADEH

Type:

Address: 9049 ALCOTT ST, 205, L A

Phone:

Experience: years

Applicant: SAM