Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

New SFD 2-story with basement and attached garage

Inspection Activity
Date: 03/23/2020
Type: Verify Sprinkler Sign Off
Result: No Access for Inspection
Status: Issued
Date: 03/24/2020
Type: ELECTRICAL-Rough
Result: Partial Inspection
Status: Issued
Date: 03/24/2020
Type: PLUMBING-Rough
Result: Partial Inspection
Status: Issued
Date: 10/24/2019
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 06/15/2019
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 10/22/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/23/2020
Type: Reinforced Concrete Frame
Result: No Access for Inspection
Status: Issued
Date: 03/23/2020
Type: Green Building Rough
Result: No Access for Inspection
Status: Issued
Date: 06/22/2019
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 06/15/2019
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 07/12/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 11/19/2019
Type: PLUMBING-Rough
Result: Insp Cancelled
Status: Issued
Date: 08/26/2019
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 08/27/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/26/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 09/04/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/03/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 09/06/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 09/10/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/27/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 09/24/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 09/30/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/08/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/07/2020
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 05/08/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 05/07/2020
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 05/06/2020
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 05/06/2020
Type: Reinforced Concrete Frame
Result: Corrections Issued
Status: Issued
Date: 05/06/2020
Type: PLUMBING-Rough
Result: Corrections Issued
Status: Issued
Date: 05/08/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/06/2020
Type: ELECTRICAL-Rough
Result: Partial Inspection
Status: Issued
Date: 05/06/2020
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 01/18/2020
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 01/15/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 01/15/2020
Type: Footing/Foundation/Slab
Result: Corrections Issued
Status: Issued
Date: 01/21/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 05/15/2020
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 01/31/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 01/30/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/07/2020
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 02/03/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 01/08/2021
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 02/10/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 02/14/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/14/2020
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 01/06/2021
Type: Piling/Pier/Caisson
Result: Corrections Issued
Status: Issued
Date: 05/26/2020
Type: Reinforced Concrete Frame
Result: Corrections Issued
Status: Issued
Date: 05/26/2020
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 05/26/2020
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 02/24/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 02/25/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 02/26/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 03/02/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 03/04/2020
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 03/03/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 03/06/2020
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 08/12/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/09/2020
Type: Masonry Wall/Backfill
Result: Corrections Issued
Status: Issued
Date: 03/17/2020
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 07/07/2020
Type: Green Building Rough
Result: Cancelled
Status: Issued
Date: 07/07/2020
Type: Structural Steel Frame
Result: Cancelled
Status: Issued
Date: 07/08/2020
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 07/07/2020
Type: Verify Sprinkler Sign Off
Result: Cancelled
Status: Issued
Date: 07/29/2020
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 07/29/2020
Type: Reinforced Concrete Frame
Result: Corrections Issued
Status: Issued
Date: 07/29/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/29/2020
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 01/21/2021
Type: Deputy Other (see comments)
Result: Partial Approval
Status: Issued
Date: 01/21/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/26/2021
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 04/26/2021
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 01/25/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/26/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/28/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 10/28/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 10/28/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 10/29/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/01/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 02/03/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 02/02/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 02/11/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/17/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/10/2020
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 02/26/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Cancelled
Status: Issued
Date: 02/26/2021
Type: Footing/Foundation/Slab
Result: Cancelled
Status: Issued
Date: 05/21/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/20/2021
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 05/20/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/18/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/20/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 05/20/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 03/08/2021
Type: Footing/Foundation/Slab
Result: Cancelled
Status: Issued
Date: 03/10/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 08/25/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 03/15/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/18/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Cancelled
Status: Issued
Date: 03/18/2021
Type: Footing/Foundation/Slab
Result: Cancelled
Status: Issued
Date: 08/23/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/26/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 03/22/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 08/26/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 03/30/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/30/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/11/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/15/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/10/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 07/29/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 09/29/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/10/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/10/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/08/2022
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 11/15/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 11/15/2021
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/15/2021
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 11/15/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 03/16/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/16/2022
Type: Reinforced Concrete Frame
Result: Corrections Issued
Status: Issued
Date: 03/16/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 03/25/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/08/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/29/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/29/2022
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 03/29/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 06/21/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/22/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 06/22/2022
Type: Structural Steel Frame
Result: Corrections Issued
Status: Issued
Date: 04/06/2022
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 04/06/2022
Type: BUILDING-Rough-Frame
Result: Insp Cancelled
Status: Issued
Date: 04/06/2022
Type: Structural Steel Frame
Result: Insp Cancelled
Status: Issued
Date: 04/04/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/06/2022
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 04/06/2022
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 06/22/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 04/13/2022
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 04/13/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 04/13/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 06/27/2022
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 04/25/2022
Type: Wood Frame
Result: Corrections Issued
Status: Issued
Date: 07/06/2022
Type: Structural Steel Frame
Result: Cancelled
Status: Issued
Date: 07/08/2022
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 07/08/2022
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 07/08/2022
Type: Structural Steel Frame
Result: Insp Cancelled
Status: Issued
Date: 07/07/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 07/06/2022
Type: Verify Sprinkler Sign Off
Result: Cancelled
Status: Issued
Date: 07/06/2022
Type: Green Building Rough
Result: Cancelled
Status: Issued
Date: 07/05/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/11/2022
Type: Masonry Wall/Backfill
Result: Insp Cancelled
Status: Issued
Date: 05/11/2022
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 05/18/2022
Type: Structural Steel Frame
Result: Insp Cancelled
Status: Issued
Date: 05/18/2022
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 05/18/2022
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 07/12/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 07/22/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 07/22/2022
Type: BUILDING-Rough-Frame
Result: Not Ready for Inspection
Status: Issued
Date: 07/22/2022
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 08/01/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 08/01/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 08/01/2022
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 08/09/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 08/09/2022
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 08/09/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 08/25/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 08/25/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 08/25/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 01/20/2023
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 01/20/2023
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 01/20/2023
Type: Structural Steel Frame
Result: Insp Cancelled
Status: Issued
Date: 01/30/2023
Type: Pre-Gunite
Result: Insp Cancelled
Status: Issued
Date: 05/08/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/08/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/08/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/08/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/15/2023
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 05/17/2023
Type: Pre-Inspection
Result: Cancelled
Status: Issued
Date: 05/15/2023
Type: BUILDING-Rough-Frame
Result: Not Ready for Inspection
Status: Issued
Date: 05/15/2023
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/19/2023
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/15/2023
Type: Structural Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 05/19/2023
Type: BUILDING-Rough-Frame
Result: Corrections Issued
Status: Issued
Date: 05/19/2023
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 06/01/2023
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 06/01/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Corrections Issued
Status: Issued
Date: 06/03/2024
Type: PLUMBING-Rough
Result: Corrections Issued
Status: Issued
Date: 06/20/2023
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 06/28/2023
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 06/28/2023
Type: Special/Order Compliance
Result: Insp Cancelled
Status: Issued
Date: 06/28/2023
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 07/12/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Approved
Status: Issued
Date: 06/10/2024
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 06/10/2024
Type: PLUMBING-Rough
Result: Corrections Issued
Status: Issued
Date: 06/10/2024
Type: ELECTRICAL-Final
Result: Not Ready for Inspection
Status: Issued
Date: 08/02/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/30/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Approved
Status: Issued
Date: 12/08/2023
Type: HVAC-Rough
Result: Corrections Issued
Status: Issued
Date: 06/28/2024
Type: ELECTRICAL-Rough
Result: Insp Cancelled
Status: Issued
Date: 03/15/2024
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 03/13/2024
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 03/15/2024
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 03/15/2024
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 03/15/2024
Type: Reinforced Masonry Frame
Result: Insp Cancelled
Status: Issued
Date: 03/15/2024
Type: BUILDING-Rough-Frame
Result: Corrections Issued
Status: Issued
Date: 03/15/2024
Type: Pre-Gunite
Result: Partial Approval
Status: Issued
Date: 03/13/2024
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 03/26/2024
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
CORR CONTEMPORARY HOMES LLC

License number: 913500
Type: B
Phone: Speak with a Permit Expert
Location: MARINA DEL REY, CA

Permit Applicant

Principal: JAMES CORR

Type:

Address:

Phone:

Experience: years

Applicant: DEREK WOLF