Bldg-Addition Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

ADDITION OFFICE SPACE TO 1ST AND 2ND FLOOR OF THE EXISTING (office an

Inspection Activity
Date: 05/30/2019
Type: Final
Result: OK for TCO
Status: Issued
Date: 05/03/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/03/2018
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 05/03/2018
Type: METHANE-Rough
Result: Partial Inspection
Status: Issued
Date: 05/18/2018
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 05/14/2018
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 05/18/2018
Type: METHANE-Subgrade
Result: Insp Scheduled
Status: Issued
Date: 05/14/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/14/2018
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 05/14/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/18/2018
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 05/18/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 05/18/2018
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 05/23/2018
Type: Grading Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 05/23/2018
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 05/25/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 06/06/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 06/06/2018
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 06/06/2018
Type: METHANE-Rough
Result: Partial Inspection
Status: Issued
Date: 06/08/2018
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 06/11/2018
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 06/12/2018
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 06/13/2018
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 06/11/2018
Type: METHANE-Subgrade
Result: Partial Inspection
Status: Issued
Date: 06/14/2018
Type: Deputy Methane Barrier
Result: Approved
Status: Issued
Date: 06/18/2018
Type: METHANE-Subgrade
Result: Partial Approval
Status: Issued
Date: 06/21/2018
Type: METHANE-Subgrade
Result: Partial Approval
Status: Issued
Date: 06/21/2018
Type: Deputy Methane Barrier
Result: Approved
Status: Issued
Date: 06/18/2018
Type: METHANE-Barrier
Result: Partial Approval
Status: Issued
Date: 06/20/2018
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 06/21/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/18/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/21/2018
Type: METHANE-Barrier
Result: Partial Approval
Status: Issued
Date: 06/18/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/29/2018
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 06/29/2018
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 06/29/2018
Type: METHANE-Subgrade
Result: Insp Scheduled
Status: Issued
Date: 06/25/2018
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 07/03/2018
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 07/05/2018
Type: Deputy Methane Barrier
Result: Approved
Status: Issued
Date: 07/13/2018
Type: METHANE-Subgrade
Result: Insp Scheduled
Status: Issued
Date: 07/12/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/13/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 07/11/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 07/13/2018
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 07/13/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 07/13/2018
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 07/20/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 07/16/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/16/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/18/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/18/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/27/2018
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 07/27/2018
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 07/27/2018
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 07/27/2018
Type: METHANE-Subgrade
Result: Insp Scheduled
Status: Issued
Date: 07/27/2018
Type: METHANE-Rough
Result: Insp Scheduled
Status: Issued
Date: 07/27/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 07/25/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/27/2018
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 07/23/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/31/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 08/03/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 08/03/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 08/02/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 08/09/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 08/10/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 08/07/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 08/08/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 08/16/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 08/13/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 08/17/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 08/15/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 08/14/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/04/2019
Type: Special/Order Compliance
Result: Approved
Status: CofO in Progress
Date: 08/21/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 08/22/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/20/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 08/20/2018
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 08/23/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 08/24/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 08/20/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 08/24/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 08/21/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 08/21/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/20/2018
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 08/20/2018
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 08/29/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 08/27/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 08/31/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 08/30/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 09/04/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/14/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 09/13/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/18/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 09/18/2018
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 09/19/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/18/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 09/18/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/21/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 09/24/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/24/2018
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 09/24/2018
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 09/24/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 09/28/2018
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 09/24/2018
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 09/28/2018
Type: Structural Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 09/28/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 09/24/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 10/03/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/04/2018
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 10/01/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/04/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/04/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/05/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/09/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 10/09/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 10/10/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/11/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/16/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/17/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/18/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/18/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/18/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/19/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/24/2018
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 10/23/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/24/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/24/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/23/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 11/22/2019
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 11/22/2019
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 11/06/2018
Type: Special/Order Compliance
Result: Corrections Issued
Status: Issued
Date: 11/09/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/05/2018
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/05/2018
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/05/2018
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 11/16/2018
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 11/16/2018
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 11/15/2018
Type: T-Bar Ceiling
Result: Not Ready for Inspection
Status: Issued
Date: 11/16/2018
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 11/15/2018
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 11/16/2018
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 11/15/2018
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 11/15/2018
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 11/15/2018
Type: Light Gage Steel Frame
Result: Corrections Issued
Status: Issued
Date: 11/22/2019
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 01/03/2019
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 01/09/2019
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 01/09/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 01/14/2019
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 01/14/2019
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 01/14/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/24/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 02/01/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 09/18/2019
Type: Final
Result: Conditional Approval
Status: Issued
Date: 02/11/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 02/20/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/22/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 02/21/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/25/2019
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/28/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 03/01/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 02/27/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/27/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/25/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 02/25/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 02/26/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/26/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/04/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/07/2019
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/08/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/08/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/06/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/06/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/05/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 03/07/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 03/05/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 03/07/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/07/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 03/05/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 03/05/2019
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/13/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/13/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/15/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/15/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/11/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/14/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/14/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/12/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/12/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/03/2019
Type: Final
Result: Partial Approval
Status: Issued
Date: 03/18/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/20/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/20/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/22/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/21/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/21/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/19/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/26/2019
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/26/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 10/11/2019
Type: Fire Sprinkler Verification
Result: OK for CofO
Status: Issued
Date: 04/19/2019
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 04/18/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 04/18/2019
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 04/19/2019
Type: Smoke Detectors
Result: Insp Scheduled
Status: Issued
Date: 04/19/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 10/16/2019
Type: CofO Issuance
Result: CofO in Progress
Status: CofO in Progress
Date: 10/15/2019
Type: Final
Result: OK to Issue CofO
Status: CofO in Progress
Date: 04/23/2019
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/07/2019
Type: Light Gage Steel Frame
Result: Approved
Status: Issued
Date: 05/06/2019
Type: Light Gage Steel Frame
Result: Approved
Status: Issued
Date: 05/13/2019
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/17/2019
Type: Wood Frame
Result: Insp Cancelled
Status: Issued
Date: 05/17/2019
Type: Structural Steel Frame
Result: Insp Cancelled
Status: Issued
Date: 05/13/2019
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 05/14/2019
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/23/2019
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 05/23/2019
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 05/23/2019
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 05/23/2019
Type: SGSOV-Seismic Gas S/O Valve
Result: Insp Scheduled
Status: Issued
Date: 05/22/2019
Type: Heat,Vent,A/C Verification
Result: OK for CofO
Status: Issued
Date: 05/22/2019
Type: Fire Sprinkler Verification
Result: CofO on Hold
Status: Issued
Date: 05/22/2019
Type: Elevator Verification
Result: OK for CofO
Status: Issued
Date: 05/23/2019
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 05/22/2019
Type: Electrical Verification
Result: OK for CofO
Status: Issued
Date: 05/22/2019
Type: Plumbing Verification
Result: CofO on Hold
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
KPRS CONSTRUCTION SERVICES INC

License number: 751130
Type: B
Phone: Speak with a Permit Expert
Location: BREA, CA

Permit Applicant

Principal: PAUL DAVID BUSE

Type:

Address: 724 SOUTH SPRING ST, 1002, LA CA

Phone:

Experience: years

Applicant: HANSONLA