Electrical Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

Plan check for Power and Energey for (new) 695 units apartment with 24

Inspection Activity
Date: 05/30/2019
Type: Final
Result: Partial Inspection
Status: Issued
Date: 05/30/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 03/26/2020
Type: Rough
Result: Cancelled
Status: Issued
Date: 03/26/2020
Type: Final
Result: Partial Inspection
Status: Issued
Date: 03/25/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 10/23/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 10/22/2019
Type: Green Electrical Final
Result: Not Ready for Inspection
Status: Issued
Date: 06/10/2019
Type: Green Electrical Final
Result: Cancelled
Status: Issued
Date: 06/10/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 06/13/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 06/10/2019
Type: Final
Result: Cancelled
Status: Issued
Date: 06/12/2019
Type: Rough
Result: Corrections Issued
Status: Issued
Date: 06/12/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 06/10/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 10/22/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 10/22/2019
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 10/24/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 03/27/2020
Type: Final
Result: Partial Inspection
Status: Issued
Date: 03/26/2020
Type: Green Electrical Final
Result: Not Ready for Inspection
Status: Issued
Date: 06/17/2019
Type: Underground
Result: Partial Approval
Status: Issued
Date: 06/17/2019
Type: Rough
Result: Cancelled
Status: Issued
Date: 06/17/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 06/21/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 06/20/2019
Type: Underground
Result: Partial Approval
Status: Issued
Date: 06/20/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 06/17/2019
Type: Green Electrical Final
Result: Partial Inspection
Status: Issued
Date: 06/17/2019
Type: Final
Result: Partial Inspection
Status: Issued
Date: 06/19/2019
Type: Underground
Result: Corrections Issued
Status: Issued
Date: 03/23/2020
Type: Underground
Result: Partial Approval
Status: Issued
Date: 06/10/2019
Type: Green Electrical Final
Result: Cancelled
Status: Issued
Date: 06/10/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 06/13/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 06/10/2019
Type: Final
Result: Cancelled
Status: Issued
Date: 06/12/2019
Type: Rough
Result: Corrections Issued
Status: Issued
Date: 06/12/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 06/10/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 11/01/2019
Type: Service/Power Release
Result: Insp Scheduled
Status: Issued
Date: 10/31/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 11/01/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 10/29/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 07/01/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 07/05/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 07/01/2019
Type: Underground
Result: Partial Approval
Status: Issued
Date: 07/06/2019
Type: Service/Power Release
Result: Insp Scheduled
Status: Issued
Date: 07/02/2019
Type: Underground
Result: No Access for Inspection
Status: Issued
Date: 07/05/2019
Type: Green Electrical Final
Result: Insp Scheduled
Status: Issued
Date: 07/05/2019
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 07/01/2019
Type: Final
Result: Partial Inspection
Status: Issued
Date: 07/02/2019
Type: Rough
Result: No Access for Inspection
Status: Issued
Date: 08/19/2020
Type: Rough
Result: Approved
Status: Issued
Date: 04/01/2020
Type: Rough
Result: Cancelled
Status: Issued
Date: 11/07/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 07/10/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 07/11/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 07/11/2019
Type: Special Equipment
Result: Partial Inspection
Status: Issued
Date: 07/08/2019
Type: Public Counter
Result: Completed
Status: Issued
Date: 07/13/2019
Type: Service/Power Release
Result: Partial Approval
Status: Issued
Date: 07/08/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 07/13/2019
Type: Public Counter
Result: Completed
Status: Issued
Date: 07/09/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 07/13/2019
Type: Special Equipment
Result: Partial Approval
Status: Issued
Date: 08/17/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 08/16/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 08/16/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 07/16/2019
Type: Green Electrical Final
Result: Partial Inspection
Status: Issued
Date: 07/16/2019
Type: Final
Result: Partial Inspection
Status: Issued
Date: 07/16/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 07/16/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 07/19/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 07/16/2019
Type: Rough
Result: Cancelled
Status: Issued
Date: 07/19/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 07/17/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 11/04/2019
Type: Rough
Result: Cancelled
Status: Issued
Date: 11/06/2019
Type: Rough
Result: Cancelled
Status: Issued
Date: 11/04/2019
Type: Final
Result: Cancelled
Status: Issued
Date: 11/04/2019
Type: Service/Power Release
Result: Corrections Issued
Status: Issued
Date: 07/25/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 07/26/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 07/24/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 07/23/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 07/23/2019
Type: Green Electrical Final
Result: Cancelled
Status: Issued
Date: 07/23/2019
Type: Final
Result: Cancelled
Status: Issued
Date: 07/27/2019
Type: Service/Power Release
Result: Insp Scheduled
Status: Issued
Date: 11/08/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 08/21/2020
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 08/02/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 07/29/2019
Type: Final
Result: Partial Inspection
Status: Issued
Date: 08/01/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 07/31/2019
Type: Rough
Result: Partial Inspection
Status: Issued
Date: 07/30/2019
Type: Green Electrical Final
Result: Not Ready for Inspection
Status: Issued
Date: 07/30/2019
Type: Final
Result: Partial Inspection
Status: Issued
Date: 11/13/2019
Type: Service/Power Release
Result: Partial Approval
Status: Issued
Date: 11/12/2019
Type: Green Electrical Final
Result: Cancelled
Status: Issued
Date: 11/15/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 11/12/2019
Type: Final
Result: Cancelled
Status: Issued
Date: 11/12/2019
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 11/13/2019
Type: Rough
Result: Corrections Issued
Status: Issued
Date: 11/14/2019
Type: Final
Result: Partial Inspection
Status: Issued
Date: 08/08/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 09/28/2018
Type: Underground
Result: Insp Scheduled
Status: Issued
Date: 08/07/2019
Type: Final
Result: Partial Inspection
Status: Issued
Date: 08/07/2019
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 08/09/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 08/05/2019
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 10/05/2018
Type: Underground
Result: Insp Scheduled
Status: Issued
Date: 10/01/2018
Type: Rough
Result: Partial Approval
Status: Issued
Date: 10/05/2018
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 10/04/2018
Type: Rough
Result: Partial Approval
Status: Issued
Date: 08/07/2019
Type: Green Electrical Final
Result: Not Ready for Inspection
Status: Issued
Date: 08/06/2019
Type: Service/Power Release
Result: Approved
Status: Issued
Date: 08/12/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 04/06/2020
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 04/07/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 04/06/2020
Type: Green Electrical Final
Result: Insp Cancelled
Status: Issued
Date: 10/10/2018
Type: Rough
Result: Partial Approval
Status: Issued
Date: 10/12/2018
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 10/10/2018
Type: Life Safety
Result: Partial Approval
Status: Issued
Date: 04/06/2020
Type: Final
Result: Insp Cancelled
Status: Issued
Date: 08/21/2019
Type: Underground
Result: Partial Approval
Status: Issued
Date: 08/21/2019
Type: Final
Result: Partial Inspection
Status: Issued
Date: 08/19/2019
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 08/19/2019
Type: Green Electrical Final
Result: Cancelled
Status: Issued
Date: 08/19/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 11/20/2019
Type: Final
Result: Partial Inspection
Status: Issued
Date: 11/23/2019
Type: Green Electrical Final
Result: Insp Scheduled
Status: Issued
Date: 11/19/2019
Type: Rough
Result: Cancelled
Status: Issued
Date: 11/22/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 11/19/2019
Type: Final
Result: Partial Inspection
Status: Issued
Date: 11/23/2019
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 11/09/2018
Type: Underground
Result: Insp Scheduled
Status: Issued
Date: 11/09/2018
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 11/08/2018
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 11/05/2018
Type: Underground
Result: Partial Inspection
Status: Issued
Date: 08/28/2019
Type: Final
Result: Cancelled
Status: Issued
Date: 08/28/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 08/27/2019
Type: Service/Power Release
Result: Partial Inspection
Status: Issued
Date: 08/28/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 08/28/2019
Type: Green Electrical Final
Result: Cancelled
Status: Issued
Date: 08/26/2019
Type: Underground
Result: Partial Approval
Status: Issued
Date: 11/13/2018
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 11/15/2018
Type: Rough
Result: Partial Approval
Status: Issued
Date: 08/26/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 11/22/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 11/23/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 11/18/2019
Type: Final
Result: Corrections Issued
Status: Issued
Date: 11/19/2019
Type: Green Electrical Final
Result: Not Ready for Inspection
Status: Issued
Date: 12/28/2018
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 12/26/2018
Type: Rough
Result: Cancelled
Status: Issued
Date: 08/24/2020
Type: Service/Power Release
Result: Corrections Issued
Status: Issued
Date: 04/17/2020
Type: Service/Power Release
Result: Partial Inspection
Status: Issued
Date: 01/03/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 09/03/2019
Type: Final
Result: Partial Inspection
Status: Issued
Date: 09/04/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 09/03/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 09/04/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 04/15/2020
Type: Service/Power Release
Result: Partial Inspection
Status: Issued
Date: 01/08/2019
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/10/2019
Type: Underground
Result: Partial Inspection
Status: Issued
Date: 01/09/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 11/26/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 11/25/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 01/18/2019
Type: Life Safety
Result: Insp Scheduled
Status: Issued
Date: 01/18/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 01/16/2019
Type: Rough
Result: Corrections Issued
Status: Issued
Date: 11/26/2019
Type: Final
Result: Partial Inspection
Status: Issued
Date: 09/10/2019
Type: Green Electrical Final
Result: Not Ready for Inspection
Status: Issued
Date: 09/10/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 09/09/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 01/22/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 01/24/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 09/10/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 09/10/2019
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 09/12/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 09/12/2019
Type: Final
Result: Corrections Issued
Status: Issued
Date: 04/16/2020
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 04/13/2020
Type: Rough
Result: Cancelled
Status: Issued
Date: 01/30/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 01/30/2019
Type: Life Safety
Result: Cancelled
Status: Issued
Date: 09/21/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 02/08/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 02/08/2019
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 09/18/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 09/20/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 09/21/2019
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 09/20/2019
Type: Green Electrical Final
Result: Insp Scheduled
Status: Issued
Date: 02/15/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 02/13/2019
Type: Underground
Result: Insp Cancelled
Status: Issued
Date: 02/12/2019
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 02/13/2019
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 02/13/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 02/13/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 02/11/2019
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 02/13/2019
Type: Underground
Result: Partial Approval
Status: Issued
Date: 02/15/2019
Type: Life Safety
Result: Insp Scheduled
Status: Issued
Date: 02/11/2019
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 09/16/2019
Type: Rough
Result: No Access for Inspection
Status: Issued
Date: 09/20/2019
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 12/02/2019
Type: Green Electrical Final
Result: Cancelled
Status: Issued
Date: 12/06/2019
Type: Green Electrical Final
Result: Insp Scheduled
Status: Issued
Date: 12/06/2019
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 12/06/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 02/20/2019
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 02/20/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 02/19/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 02/19/2019
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 02/21/2019
Type: Life Safety
Result: Cancelled
Status: Issued
Date: 02/21/2019
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 12/04/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 12/06/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 12/02/2019
Type: Final
Result: Cancelled
Status: Issued
Date: 12/02/2019
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 12/04/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 02/26/2019
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 03/01/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 03/01/2019
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 02/27/2019
Type: Rough
Result: Corrections Issued
Status: Issued
Date: 02/27/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 02/25/2019
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 02/28/2019
Type: Underground
Result: Partial Approval
Status: Issued
Date: 03/01/2019
Type: Underground
Result: Insp Cancelled
Status: Issued
Date: 03/01/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 02/28/2019
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 02/25/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 09/26/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 09/24/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 09/25/2019
Type: Rough
Result: Corrections Issued
Status: Issued
Date: 03/08/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 03/05/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 03/07/2019
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 03/08/2019
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 03/05/2019
Type: Life Safety
Result: Cancelled
Status: Issued
Date: 03/07/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 03/06/2019
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 03/06/2019
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/04/2019
Type: Life Safety
Result: Cancelled
Status: Issued
Date: 03/08/2019
Type: Special Equipment
Result: Not Ready for Inspection
Status: Issued
Date: 03/08/2019
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 03/04/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 08/26/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 08/28/2020
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 04/23/2020
Type: Service/Power Release
Result: Partial Inspection
Status: Issued
Date: 03/11/2019
Type: Service/Power Release
Result: Corrections Issued
Status: Issued
Date: 03/14/2019
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 03/14/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 03/14/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 03/11/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 03/12/2019
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 03/13/2019
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 03/15/2019
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 03/12/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 03/11/2019
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 03/11/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 03/15/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 04/24/2020
Type: Service/Power Release
Result: Partial Inspection
Status: Issued
Date: 12/13/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 09/30/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 09/30/2019
Type: Rough
Result: Cancelled
Status: Issued
Date: 10/02/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 03/20/2019
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 03/20/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 03/21/2019
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 03/18/2019
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 03/18/2019
Type: Rough
Result: Partial Inspection
Status: Issued
Date: 03/22/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 03/19/2019
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/19/2019
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 03/21/2019
Type: Rough
Result: Corrections Issued
Status: Issued
Date: 03/22/2019
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 03/18/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 10/02/2019
Type: Life Safety
Result: Partial Inspection
Status: Issued
Date: 09/30/2019
Type: Green Electrical Final
Result: Not Ready for Inspection
Status: Issued
Date: 10/03/2019
Type: Life Safety
Result: Partial Approval
Status: Issued
Date: 09/30/2019
Type: Final
Result: Partial Inspection
Status: Issued
Date: 03/29/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 03/27/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 03/29/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 03/28/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 12/10/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 12/10/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 12/13/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 04/05/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 04/03/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 04/01/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 04/03/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 04/05/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 04/05/2019
Type: Underground
Result: Insp Scheduled
Status: Issued
Date: 10/11/2019
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 10/07/2019
Type: Rough
Result: Cancelled
Status: Issued
Date: 10/07/2019
Type: Green Electrical Final
Result: Not Ready for Inspection
Status: Issued
Date: 10/11/2019
Type: Green Electrical Final
Result: Insp Scheduled
Status: Issued
Date: 10/08/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 10/09/2019
Type: Special Equipment
Result: Off-Hour Fees Due
Status: Issued
Date: 10/07/2019
Type: Final
Result: Cancelled
Status: Issued
Date: 10/12/2019
Type: Special Equipment
Result: Insp Scheduled
Status: Issued
Date: 10/08/2019
Type: Special Equipment
Result: Off-Hour Fees Due
Status: Issued
Date: 10/07/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 10/11/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 10/11/2019
Type: Special Equipment
Result: Off-Hour Fees Due
Status: Issued
Date: 10/09/2019
Type: Final
Result: Partial Inspection
Status: Issued
Date: 10/10/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 10/12/2019
Type: Special Equipment
Result: Insp Scheduled
Status: Issued
Date: 10/10/2019
Type: Special Equipment
Result: Off-Hour Fees Due
Status: Issued
Date: 04/20/2020
Type: Service/Power Release
Result: Partial Inspection
Status: Issued
Date: 04/20/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 04/09/2019
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 04/11/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 04/09/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 04/10/2019
Type: Rough
Result: Corrections Issued
Status: Issued
Date: 04/12/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 10/14/2019
Type: Service/Power Release
Result: Partial Inspection
Status: Issued
Date: 10/16/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 10/17/2019
Type: Service/Power Release
Result: Partial Inspection
Status: Issued
Date: 04/15/2019
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 04/16/2019
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 04/18/2019
Type: Construction Power(CTS)
Result: Corrections Issued
Status: Issued
Date: 04/18/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 04/18/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 04/18/2019
Type: Underground
Result: Cancelled
Status: Issued
Date: 04/16/2019
Type: Underground
Result: Cancelled
Status: Issued
Date: 04/19/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 10/14/2019
Type: Final
Result: Partial Inspection
Status: Issued
Date: 10/17/2019
Type: Final
Result: Corrections Issued
Status: Issued
Date: 10/18/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 10/15/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 10/14/2019
Type: Special Equipment
Result: Partial Inspection
Status: Issued
Date: 12/28/2020
Type: Rough
Result: Off-Hour Fees Due
Status: Issued
Date: 12/30/2020
Type: Rough
Result: Partial Inspection
Status: Issued
Date: 12/19/2019
Type: Public Counter
Result: Completed
Status: Issued
Date: 04/23/2019
Type: Service/Power Release
Result: Partial Inspection
Status: Issued
Date: 04/25/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 04/24/2019
Type: Underground
Result: Cancelled
Status: Issued
Date: 04/24/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 04/24/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 04/23/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 04/26/2019
Type: Underground
Result: Insp Scheduled
Status: Issued
Date: 04/25/2019
Type: Underground
Result: Cancelled
Status: Issued
Date: 12/17/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 12/16/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 12/18/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 12/16/2019
Type: Green Electrical Final
Result: Not Ready for Inspection
Status: Issued
Date: 12/20/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 04/29/2019
Type: Service/Power Release
Result: Partial Inspection
Status: Issued
Date: 05/03/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 05/01/2019
Type: Rough
Result: Cancelled
Status: Issued
Date: 05/02/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 04/30/2019
Type: Rough
Result: Cancelled
Status: Issued
Date: 12/16/2019
Type: Final
Result: Corrections Issued
Status: Issued
Date: 04/30/2020
Type: Green Electrical Final
Result: Not Ready for Inspection
Status: Issued
Date: 05/01/2020
Type: Service/Power Release
Result: Partial Inspection
Status: Issued
Date: 05/09/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 05/07/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 05/10/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 05/06/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 12/26/2019
Type: Final
Result: Insp Cancelled
Status: Issued
Date: 12/26/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 12/26/2019
Type: Green Electrical Final
Result: Insp Cancelled
Status: Issued
Date: 04/30/2020
Type: Service/Power Release
Result: Partial Inspection
Status: Issued
Date: 04/30/2020
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 05/16/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 05/17/2019
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 05/13/2019
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/15/2019
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 05/16/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 09/01/2020
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 12/30/2019
Type: Rough
Result: No Access for Inspection
Status: Issued
Date: 01/03/2020
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 01/02/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 05/23/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 05/22/2019
Type: Rough
Result: Corrections Issued
Status: Issued
Date: 05/21/2019
Type: Rough
Result: Corrections Issued
Status: Issued
Date: 05/24/2019
Type: Rough
Result: Partial Approval
Status: Issued
Date: 05/20/2019
Type: Rough
Result: Corrections Issued
Status: Issued
Date: 05/22/2019
Type: Public Counter
Result: Completed
Status: Issued
Date: 05/20/2019
Type: Final
Result: Corrections Issued
Status: Issued
Date: 08/31/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 05/04/2020
Type: Service/Power Release
Result: Corrections Issued
Status: Issued
Date: 01/10/2020
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 01/09/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 01/07/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 01/06/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 05/08/2020
Type: Service/Power Release
Result: Partial Inspection
Status: Issued
Date: 01/17/2020
Type: Rough
Result: Cancelled
Status: Issued
Date: 01/13/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 01/16/2020
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 01/18/2020
Type: Service/Power Release
Result: Partial Approval
Status: Issued
Date: 01/15/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 01/18/2020
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 01/16/2020
Type: Green Electrical Final
Result: Insp Scheduled
Status: Issued
Date: 01/16/2020
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 05/12/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 01/22/2020
Type: Rough
Result: Corrections Issued
Status: Issued
Date: 01/24/2020
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 01/24/2020
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 01/24/2020
Type: Green Electrical Final
Result: Insp Scheduled
Status: Issued
Date: 01/23/2020
Type: Rough
Result: Corrections Issued
Status: Issued
Date: 05/15/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 05/11/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 05/14/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 09/11/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 09/09/2020
Type: Service/Power Release
Result: Partial Inspection
Status: Issued
Date: 01/29/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 02/01/2020
Type: Service/Power Release
Result: Insp Scheduled
Status: Issued
Date: 02/01/2020
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 01/31/2020
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 01/30/2020
Type: Final
Result: Corrections Issued
Status: Issued
Date: 09/10/2020
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 05/18/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 02/03/2020
Type: Rough
Result: Corrections Issued
Status: Issued
Date: 02/05/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 02/05/2020
Type: Rough
Result: Cancelled
Status: Issued
Date: 02/06/2020
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/22/2020
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 05/19/2020
Type: Rough
Result: No Access for Inspection
Status: Issued
Date: 05/20/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 05/22/2020
Type: Service/Power Release
Result: Partial Approval
Status: Issued
Date: 02/14/2020
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 02/11/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 02/15/2020
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 02/13/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 02/15/2020
Type: Green Electrical Final
Result: Insp Scheduled
Status: Issued
Date: 02/15/2020
Type: Final
Result: Off-Hour Fees Due
Status: Issued
Date: 02/15/2020
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 02/10/2020
Type: Final
Result: Cancelled
Status: Issued
Date: 02/10/2020
Type: Rough
Result: Corrections Issued
Status: Issued
Date: 02/10/2020
Type: Green Electrical Final
Result: Cancelled
Status: Issued
Date: 02/15/2020
Type: Green Electrical Final
Result: Off-Hour Fees Due
Status: Issued
Date: 01/07/2021
Type: Final
Result: Corrections Issued
Status: Issued
Date: 05/29/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 05/26/2020
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 02/22/2020
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 02/22/2020
Type: Green Electrical Final
Result: Insp Scheduled
Status: Issued
Date: 02/22/2020
Type: Service/Power Release
Result: Off-Hour Fees Due
Status: Issued
Date: 02/19/2020
Type: Final
Result: Partial Inspection
Status: Issued
Date: 02/22/2020
Type: Service/Power Release
Result: Insp Scheduled
Status: Issued
Date: 02/20/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 02/19/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 02/22/2020
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 02/22/2020
Type: Service/Power Release
Result: Insp Scheduled
Status: Issued
Date: 05/27/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 09/16/2020
Type: Service/Power Release
Result: Partial Inspection
Status: Issued
Date: 09/14/2020
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 09/17/2020
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 02/28/2020
Type: Special Equipment
Result: Partial Inspection
Status: Issued
Date: 02/29/2020
Type: Service/Power Release
Result: Insp Scheduled
Status: Issued
Date: 02/24/2020
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 02/26/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 02/27/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 02/28/2020
Type: Public Counter
Result: Completed
Status: Issued
Date: 06/01/2020
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 06/03/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 06/05/2020
Type: Final
Result: Corrections Issued
Status: Issued
Date: 06/04/2020
Type: Final
Result: Corrections Issued
Status: Issued
Date: 03/02/2020
Type: Final
Result: Cancelled
Status: Issued
Date: 03/04/2020
Type: Special Equipment
Result: Conditional Approval
Status: Issued
Date: 03/06/2020
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 03/05/2020
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/02/2020
Type: Green Electrical Final
Result: Cancelled
Status: Issued
Date: 03/04/2020
Type: Underground
Result: Partial Approval
Status: Issued
Date: 03/02/2020
Type: Service/Power Release
Result: Partial Inspection
Status: Issued
Date: 03/10/2020
Type: Final
Result: Corrections Issued
Status: Issued
Date: 03/11/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 03/13/2020
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 03/10/2020
Type: Rough
Result: Cancelled
Status: Issued
Date: 03/10/2020
Type: Green Electrical Final
Result: Not Ready for Inspection
Status: Issued
Date: 06/12/2020
Type: Rough
Result: Partial Inspection
Status: Issued
Date: 06/10/2020
Type: Final
Result: Corrections Issued
Status: Issued
Date: 06/09/2020
Type: Final
Result: Corrections Issued
Status: Issued
Date: 06/11/2020
Type: Rough
Result: Corrections Issued
Status: Issued
Date: 03/16/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 03/17/2020
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 09/23/2020
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 09/22/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 09/24/2020
Type: Service/Power Release
Result: Partial Inspection
Status: Issued
Date: 06/15/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 06/18/2020
Type: Rough
Result: Cancelled
Status: Issued
Date: 06/17/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 09/22/2020
Type: Service/Power Release
Result: Approved
Status: Issued
Date: 06/22/2020
Type: Special/Order Compliance
Result: Corrections Issued
Status: Issued
Date: 06/25/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 06/25/2020
Type: Rough
Result: Partial Inspection
Status: Issued
Date: 06/25/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 06/26/2020
Type: Rough
Result: Insp Scheduled
Status: Issued
Date: 06/22/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 01/11/2021
Type: Rough
Result: Cancelled
Status: Issued
Date: 07/07/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 09/23/2020
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 09/22/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 09/24/2020
Type: Service/Power Release
Result: Partial Inspection
Status: Issued
Date: 09/22/2020
Type: Service/Power Release
Result: Approved
Status: Issued
Date: 07/13/2020
Type: Rough
Result: Corrections Issued
Status: Issued
Date: 07/15/2020
Type: Special/Order Compliance
Result: Cancelled
Status: Issued
Date: 07/15/2020
Type: Final
Result: Insp Cancelled
Status: Issued
Date: 07/15/2020
Type: Green Electrical Final
Result: Insp Cancelled
Status: Issued
Date: 07/15/2020
Type: Final
Result: Partial Inspection
Status: Issued
Date: 07/17/2020
Type: Special Equipment
Result: Partial Approval
Status: Issued
Date: 07/16/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 07/14/2020
Type: Final
Result: Partial Inspection
Status: Issued
Date: 07/17/2020
Type: Public Counter
Result: Completed
Status: Issued
Date: 07/17/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 07/14/2020
Type: Green Electrical Final
Result: Off-Hour Fees Due
Status: Issued
Date: 07/16/2020
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 07/14/2020
Type: Final
Result: Off-Hour Fees Due
Status: Issued
Date: 07/23/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 07/24/2020
Type: Rough
Result: Corrections Issued
Status: Issued
Date: 10/02/2020
Type: Final
Result: Corrections Issued
Status: Issued
Date: 09/30/2020
Type: Rough
Result: Cancelled
Status: Issued
Date: 10/01/2020
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 09/29/2020
Type: Service/Power Release
Result: Partial Approval
Status: Issued
Date: 09/28/2020
Type: Service/Power Release
Result: Partial Approval
Status: Issued
Date: 07/27/2020
Type: Rough
Result: Partial Inspection
Status: Issued
Date: 01/19/2021
Type: Final
Result: Permit Finaled
Status: Permit Finaled
Date: 08/05/2020
Type: Service/Power Release
Result: Cancelled
Status: Issued
Date: 08/04/2020
Type: Service/Power Release
Result: Partial Inspection
Status: Issued
Date: 08/03/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 08/04/2020
Type: Rough
Result: Not Ready for Inspection
Status: Issued
Date: 08/05/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 08/03/2020
Type: Green Electrical Final
Result: Not Ready for Inspection
Status: Issued
Date: 08/03/2020
Type: Final
Result: Cancelled
Status: Issued
Date: 10/09/2020
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 10/09/2020
Type: Special Equipment
Result: Not Ready for Inspection
Status: Issued
Date: 10/05/2020
Type: Service/Power Release
Result: Partial Inspection
Status: Issued
Date: 08/10/2020
Type: Service/Power Release
Result: Partial Inspection
Status: Issued
Date: 08/11/2020
Type: Special Equipment
Result: Partial Approval
Status: Issued
Date: 08/14/2020
Type: Service/Power Release
Result: Partial Inspection
Status: Issued
Date: 08/13/2020
Type: Final
Result: Corrections Issued
Status: Issued
Date: 10/09/2020
Type: Final
Result: Partial Inspection
Status: Issued
Date: 10/17/2020
Type: Final
Result: Partial Inspection
Status: Issued
Date: 10/13/2020
Type: Final
Result: Partial Inspection
Status: Issued
Date: 10/14/2020
Type: Final
Result: Partial Inspection
Status: Issued
Date: 10/16/2020
Type: Final
Result: Partial Inspection
Status: Issued
Date: 10/22/2020
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 10/19/2020
Type: Green Electrical Final
Result: Not Ready for Inspection
Status: Issued
Date: 10/22/2020
Type: Life Safety
Result: Partial Approval
Status: Issued
Date: 10/19/2020
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 10/22/2020
Type: Public Counter
Result: Completed
Status: Issued
Date: 10/23/2020
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 10/23/2020
Type: Rough
Result: Cancelled
Status: Issued
Date: 10/28/2020
Type: Special/Order Compliance
Result: Insp Cancelled
Status: Issued
Date: 10/30/2020
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 10/29/2020
Type: Special/Order Compliance
Result: Cancelled
Status: Issued
Date: 10/28/2020
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 10/26/2020
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 10/28/2020
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 10/28/2020
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 10/29/2020
Type: Life Safety
Result: Insp Cancelled
Status: Issued
Date: 11/02/2020
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 11/04/2020
Type: Special Equipment
Result: Partial Inspection
Status: Issued
Date: 11/17/2020
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 12/11/2020
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 12/09/2020
Type: Rough
Result: Partial Approval
Status: Issued
Date: 12/10/2020
Type: Special Equipment
Result: Partial Approval
Status: Issued
Date: 12/18/2020
Type: Final
Result: Partial Approval
Status: Issued
Date: 12/16/2020
Type: Final
Result: Partial Approval
Status: Issued
Date: 12/16/2020
Type: Green Electrical Final
Result: Approved
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
CAL BUILDING & MAINTENANCE INDUSTRIES INC

License number: 741907
Type: C10
Phone: Speak with a Permit Expert
Location: HAWTHORNE, CA

Permit Applicant

Principal: ISAAC ZAHARONI

Type:

Address: 3 MAC ARTHUR PLACE, #855, SANTA ANA, CA

Phone:

Experience: years

Applicant: MILLIE LEE