Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

New 6 story ( 4story type III-A above 2 story type I-A), 47 affordable

Inspection Activity
Date: 05/30/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 05/29/2019
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 05/30/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 05/30/2019
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 05/29/2019
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 05/31/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 05/30/2019
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 05/31/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 05/31/2019
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 05/31/2019
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 03/27/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 03/27/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 10/24/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/24/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/11/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/14/2019
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 06/11/2019
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 06/14/2019
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 06/11/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/11/2019
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 06/20/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 06/20/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/29/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/11/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/14/2019
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 06/11/2019
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 06/11/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/14/2019
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 06/11/2019
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 06/29/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/29/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/28/2019
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 10/29/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/28/2019
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 07/02/2018
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 07/03/2018
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 07/02/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 07/02/2018
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 07/03/2018
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 07/02/2018
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 03/31/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 03/31/2020
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 03/31/2020
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 07/09/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 07/09/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 07/09/2019
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 07/12/2019
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 07/09/2019
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 07/12/2019
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 08/16/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 08/13/2019
Type: Special/Order Compliance
Result: Corrections Issued
Status: Issued
Date: 08/13/2019
Type: Special/Order Compliance
Result: Corrections Issued
Status: Issued
Date: 08/16/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/30/2018
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 07/30/2018
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 07/30/2018
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 07/30/2018
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 07/19/2019
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 07/19/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 07/19/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 07/19/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 07/19/2019
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 07/19/2019
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 11/06/2019
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 08/15/2018
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 08/15/2018
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 08/15/2018
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 08/15/2018
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 11/08/2019
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 11/08/2019
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 11/06/2019
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 07/22/2019
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/24/2019
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 07/24/2019
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 07/22/2019
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 08/24/2018
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 08/24/2018
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 03/31/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 08/27/2018
Type: METHANE-Subgrade
Result: Partial Approval
Status: Issued
Date: 08/27/2018
Type: METHANE-Subgrade
Result: Partial Approval
Status: Issued
Date: 08/28/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/30/2018
Type: Deputy Methane Barrier
Result: Approved
Status: Issued
Date: 08/31/2018
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 08/27/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 08/28/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/28/2018
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 08/28/2018
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 08/31/2018
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 08/27/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 08/29/2018
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 08/29/2018
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 08/30/2018
Type: Deputy Methane Barrier
Result: Approved
Status: Issued
Date: 04/08/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 04/06/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Cancelled
Status: Issued
Date: 08/02/2019
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 07/29/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 08/01/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 09/04/2018
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 09/06/2018
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 09/07/2018
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 09/06/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 09/04/2018
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 09/06/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 09/05/2018
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 09/06/2018
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 09/07/2018
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 09/05/2018
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 07/29/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 09/14/2018
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 09/14/2018
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 08/02/2019
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 07/31/2019
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 07/31/2019
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 08/01/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 09/20/2018
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 09/20/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 09/18/2018
Type: METHANE-Final
Result: Approved
Status: Issued
Date: 09/18/2018
Type: METHANE-Final
Result: Approved
Status: Issued
Date: 09/20/2018
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 09/20/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 08/07/2019
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 08/08/2019
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 08/07/2019
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 08/08/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 09/27/2018
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 09/27/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 09/27/2018
Type: METHANE-Subgrade
Result: Approved
Status: Issued
Date: 09/27/2018
Type: METHANE-Subgrade
Result: Approved
Status: Issued
Date: 09/27/2018
Type: METHANE-Barrier
Result: Partial Approval
Status: Issued
Date: 09/27/2018
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 09/27/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 09/27/2018
Type: METHANE-Barrier
Result: Partial Approval
Status: Issued
Date: 08/08/2019
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 08/08/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 08/06/2019
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 08/06/2019
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 04/10/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/06/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Cancelled
Status: Issued
Date: 04/08/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/12/2018
Type: METHANE-Barrier
Result: Approved
Status: Issued
Date: 10/12/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 10/11/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 10/12/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 10/11/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 10/12/2018
Type: METHANE-Barrier
Result: Approved
Status: Issued
Date: 04/10/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/19/2018
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 10/19/2018
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 08/19/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 08/19/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/23/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/24/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 10/23/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/24/2018
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/23/2018
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 10/26/2018
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 10/25/2018
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 10/24/2018
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/24/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 10/25/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/22/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 10/22/2018
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 10/22/2018
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 10/23/2018
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 10/22/2018
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 10/22/2018
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 10/22/2018
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 10/25/2018
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 10/22/2018
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 10/22/2018
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 10/26/2018
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 10/22/2018
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 10/22/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 10/25/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/22/2019
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 11/22/2019
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 11/22/2019
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 11/08/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/08/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/09/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 11/09/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 11/08/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/08/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/22/2019
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 12/28/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/28/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/24/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/24/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/24/2018
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 12/27/2018
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 12/27/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/27/2018
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 12/24/2018
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 12/27/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/27/2018
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 12/27/2018
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 12/31/2018
Type: Special/Order Compliance
Result: No Access for Inspection
Status: Issued
Date: 12/31/2018
Type: Special/Order Compliance
Result: No Access for Inspection
Status: Issued
Date: 01/11/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/11/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/26/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/16/2019
Type: Deputy Reinf. Concrete
Result: No Access for Inspection
Status: Issued
Date: 01/14/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/17/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/17/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/14/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/15/2019
Type: Deputy Reinf. Concrete
Result: No Access for Inspection
Status: Issued
Date: 01/15/2019
Type: Deputy Reinf. Concrete
Result: No Access for Inspection
Status: Issued
Date: 01/16/2019
Type: Deputy Reinf. Concrete
Result: No Access for Inspection
Status: Issued
Date: 11/26/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/24/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 01/22/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Conditional Approval
Status: Issued
Date: 01/23/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/23/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/22/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Conditional Approval
Status: Issued
Date: 01/22/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/24/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 01/22/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/23/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/23/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/28/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 01/30/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 02/01/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/01/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 01/28/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/01/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/29/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/31/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 01/30/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 01/28/2019
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 02/01/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 01/31/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 02/01/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 02/01/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 02/01/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 01/31/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 01/29/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 01/30/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/01/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 01/29/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 01/31/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/30/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 01/30/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/29/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 01/29/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/31/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 01/31/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/29/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 01/30/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 01/28/2019
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 02/08/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 02/08/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 09/18/2019
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 09/20/2019
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 02/13/2019
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 02/13/2019
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 09/20/2019
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 09/18/2019
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 09/16/2019
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 09/16/2019
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 09/19/2019
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 09/19/2019
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 02/19/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/19/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/28/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/27/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/27/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/28/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/06/2019
Type: Deputy Other (see comments)
Result: Approved
Status: Issued
Date: 03/08/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 03/07/2019
Type: Deputy Other (see comments)
Result: Approved
Status: Issued
Date: 03/07/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 03/08/2019
Type: Deputy Other (see comments)
Result: Approved
Status: Issued
Date: 03/04/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 03/08/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/08/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/07/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/04/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 03/06/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 03/07/2019
Type: Deputy Other (see comments)
Result: Approved
Status: Issued
Date: 03/06/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/06/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/06/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 03/06/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 03/06/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/06/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/08/2019
Type: Deputy Other (see comments)
Result: Approved
Status: Issued
Date: 03/08/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 03/07/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/06/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 03/08/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 03/07/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 03/06/2019
Type: Deputy Other (see comments)
Result: Approved
Status: Issued
Date: 03/08/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 03/07/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 03/07/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 04/21/2020
Type: Interior/Exterior Lathing
Result: Corrections Issued
Status: Issued
Date: 04/21/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/21/2020
Type: Interior/Exterior Lathing
Result: Corrections Issued
Status: Issued
Date: 03/15/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 03/14/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 03/12/2019
Type: Deputy Other (see comments)
Result: Approved
Status: Issued
Date: 03/12/2019
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 03/11/2019
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 03/12/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 03/14/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 03/12/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/12/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 03/14/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 03/12/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 03/11/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/11/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/15/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Cancelled
Status: Issued
Date: 03/12/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 03/12/2019
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 03/15/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 03/13/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 03/12/2019
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 03/13/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 03/15/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Cancelled
Status: Issued
Date: 03/11/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/11/2019
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 03/12/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 03/11/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/12/2019
Type: Deputy Other (see comments)
Result: Approved
Status: Issued
Date: 03/12/2019
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 03/12/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/11/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 03/12/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 03/11/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 03/14/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 04/21/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/02/2019
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 10/02/2019
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 03/18/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/18/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/04/2019
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 10/04/2019
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 04/05/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 04/05/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 10/11/2019
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 10/08/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/11/2019
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 10/08/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/10/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/12/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/12/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/10/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/15/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 04/15/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 04/27/2020
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 04/24/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/24/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Conditional Approval
Status: Issued
Date: 04/26/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 04/24/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Conditional Approval
Status: Issued
Date: 04/23/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/24/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/26/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 04/23/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/27/2020
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 04/27/2020
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 04/28/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/28/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/08/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 05/08/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 04/27/2020
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 01/27/2020
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 01/27/2020
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 01/28/2020
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 01/28/2020
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 01/06/2021
Type: Special/Order Compliance
Result: Approved
Status: CofO in Progress
Date: 02/13/2020
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 02/13/2020
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 01/06/2021
Type: Special/Order Compliance
Result: Approved
Status: CofO in Progress
Date: 05/28/2020
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 05/28/2020
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 02/18/2020
Type: Masonry Wall/Backfill
Result: Approved
Status: Issued
Date: 02/18/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Approved
Status: Issued
Date: 02/18/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Approved
Status: Issued
Date: 02/18/2020
Type: Masonry Wall/Backfill
Result: Approved
Status: Issued
Date: 09/18/2020
Type: Final
Result: Cancelled
Status: Issued
Date: 09/18/2020
Type: Final
Result: Cancelled
Status: Issued
Date: 02/26/2020
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 02/26/2020
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/09/2020
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 06/10/2020
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 06/10/2020
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 06/10/2020
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 06/10/2020
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 06/10/2020
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 06/10/2020
Type: Reinforced Concrete Frame
Result: Approved
Status: Issued
Date: 06/10/2020
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 06/10/2020
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 06/10/2020
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 06/12/2020
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 06/10/2020
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 06/10/2020
Type: Reinforced Concrete Frame
Result: Approved
Status: Issued
Date: 06/12/2020
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 06/10/2020
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: Issued
Date: 06/10/2020
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: Issued
Date: 06/09/2020
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 06/09/2020
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 06/10/2020
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 03/18/2020
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 03/20/2020
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 03/18/2020
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 03/20/2020
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 03/19/2020
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 03/20/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 03/19/2020
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 03/19/2020
Type: Masonry Wall/Backfill
Result: Not Ready for Inspection
Status: Issued
Date: 03/19/2020
Type: Masonry Wall/Backfill
Result: Not Ready for Inspection
Status: Issued
Date: 03/20/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 06/09/2020
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 06/10/2020
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 06/10/2020
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 07/07/2020
Type: Final
Result: Partial Approval
Status: Issued
Date: 07/07/2020
Type: Final
Result: Partial Approval
Status: Issued
Date: 07/15/2020
Type: Final
Result: Partial Inspection
Status: Issued
Date: 07/15/2020
Type: Final
Result: Partial Inspection
Status: Issued
Date: 07/17/2020
Type: Final
Result: Conditional Approval
Status: Issued
Date: 07/17/2020
Type: Final
Result: Conditional Approval
Status: Issued
Date: 07/29/2020
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 07/29/2020
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 08/05/2020
Type: Final
Result: OK for TCO
Status: Issued
Date: 08/05/2020
Type: Final
Result: OK for TCO
Status: Issued
Date: 01/25/2021
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 01/25/2021
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 01/25/2021
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 01/25/2021
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 01/25/2021
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 01/25/2021
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 11/04/2020
Type: Final
Result: OK to Issue CofO
Status: CofO in Progress
Date: 11/04/2020
Type: Final
Result: OK to Issue CofO
Status: CofO in Progress
Date: 11/05/2020
Type: CofO Issuance
Result: CofO in Progress
Status: CofO in Progress
Date: 11/05/2020
Type: CofO Issuance
Result: CofO in Progress
Status: CofO in Progress
Date: 05/19/2021
Type: Special/Order Compliance
Result: Approved
Status: CofO Issued
Date: 05/19/2021
Type: Special/Order Compliance
Result: Approved
Status: CofO Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
DREYFUSS CONSTRUCTION

License number: 668225
Type: B
Phone: Speak with a Permit Expert
Location: LOS ANGELES, CA

Permit Applicant

Principal: JAMES HENRY DREYFUSS

Type:

Address: 201 S. FIGUEROA, 240, LOS ANGELES

Phone:

Experience: years

Applicant: TAYLOR MILLER