Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

NEW 4 STORY MIXED USE BUILDING: 2 STORY TYPE VB, 3-UNIT APARTMENT WITH

Inspection Activity
Date: 05/29/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 10/24/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/21/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/25/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 10/23/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/23/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/25/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/25/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/21/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/14/2019
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 10/25/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 10/24/2019
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 03/26/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/26/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/23/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/23/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 08/18/2020
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 10/31/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/30/2019
Type: Structural Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 10/28/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/30/2019
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 10/30/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/30/2019
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 10/30/2019
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 10/30/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/14/2019
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 10/29/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/28/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/31/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/30/2019
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 10/30/2019
Type: Structural Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 10/29/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/30/2019
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 10/30/2019
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 08/17/2020
Type: Grading Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 07/01/2019
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 07/01/2019
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 08/17/2020
Type: Grading Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 04/01/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/01/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/09/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 07/11/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 07/11/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 07/08/2019
Type: METHANE-Subgrade
Result: Approved
Status: Issued
Date: 07/09/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 07/08/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Approved
Status: Issued
Date: 07/08/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Approved
Status: Issued
Date: 07/11/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 07/11/2019
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 07/12/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 07/10/2019
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 07/09/2019
Type: Deputy Methane Barrier
Result: Approved
Status: Issued
Date: 07/08/2019
Type: METHANE-Subgrade
Result: Approved
Status: Issued
Date: 07/10/2019
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 07/09/2019
Type: Deputy Methane Barrier
Result: Approved
Status: Issued
Date: 07/11/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 07/10/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/10/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/12/2019
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 07/11/2019
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 07/12/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 07/12/2019
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 08/13/2019
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 08/13/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 08/13/2019
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 08/14/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 08/13/2019
Type: METHANE-Rough
Result: Approved
Status: Issued
Date: 08/13/2019
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 08/13/2019
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 08/13/2019
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 08/16/2019
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 08/13/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 08/14/2019
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 08/14/2019
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 08/16/2019
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 07/16/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 07/16/2019
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 11/06/2019
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 11/08/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 11/06/2019
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 11/06/2019
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 11/06/2019
Type: Structural Steel Frame
Result: Corrections Issued
Status: Issued
Date: 11/06/2019
Type: Structural Steel Frame
Result: Corrections Issued
Status: Issued
Date: 11/06/2019
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 11/08/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 07/26/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/23/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 07/26/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 07/26/2019
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 07/26/2019
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 07/24/2019
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 07/26/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/26/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 07/24/2019
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 07/23/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/18/2020
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 07/30/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 07/30/2019
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 07/29/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/30/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 07/29/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/30/2019
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 11/13/2019
Type: Structural Steel Frame
Result: Corrections Issued
Status: Issued
Date: 11/13/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/13/2019
Type: Structural Steel Frame
Result: Corrections Issued
Status: Issued
Date: 11/13/2019
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 11/13/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/13/2019
Type: Insulation
Result: Approved
Status: Issued
Date: 11/13/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/13/2019
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/13/2019
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 11/13/2019
Type: Insulation
Result: Approved
Status: Issued
Date: 08/07/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/09/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 08/07/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/09/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 08/14/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 08/16/2019
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 08/16/2019
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 08/16/2019
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 08/16/2019
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 08/13/2019
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 08/13/2019
Type: METHANE-Rough
Result: Approved
Status: Issued
Date: 08/22/2019
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 08/23/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 08/22/2019
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 08/22/2019
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 08/22/2019
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 08/22/2019
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 08/23/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 08/22/2019
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 11/18/2019
Type: Wood Frame
Result: Corrections Issued
Status: Issued
Date: 11/18/2019
Type: Wood Frame
Result: Corrections Issued
Status: Issued
Date: 08/29/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 08/28/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/29/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/30/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 08/27/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 08/30/2019
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 08/26/2019
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 08/29/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 08/27/2019
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 08/27/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 08/26/2019
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 08/28/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Conditional Approval
Status: Issued
Date: 08/28/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/28/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Conditional Approval
Status: Issued
Date: 08/27/2019
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 08/28/2019
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 08/28/2019
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 08/29/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/30/2019
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 08/30/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 08/27/2020
Type: Green Building Final
Result: Partial Inspection
Status: Issued
Date: 08/27/2020
Type: Smoke Detectors
Result: Partial Inspection
Status: Issued
Date: 04/13/2020
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 09/05/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/04/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 09/05/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/04/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 09/04/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/04/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/04/2019
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/04/2019
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 04/13/2020
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 09/12/2019
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/10/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 09/10/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 09/12/2019
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 08/28/2020
Type: Heat,Vent,A/C Verification
Result: OK for CofO
Status: Issued
Date: 08/27/2020
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 08/28/2020
Type: Heat,Vent,A/C Verification
Result: OK for CofO
Status: Issued
Date: 08/27/2020
Type: Green Building Final
Result: Partial Inspection
Status: Issued
Date: 08/27/2020
Type: Smoke Detectors
Result: Partial Inspection
Status: Issued
Date: 08/28/2020
Type: Plumbing Verification
Result: Pending
Status: Issued
Date: 08/27/2020
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 08/27/2020
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 08/27/2020
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 08/27/2020
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 08/27/2020
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 08/26/2020
Type: Final
Result: Corrections Issued
Status: Issued
Date: 08/27/2020
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 09/16/2019
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 09/18/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 09/16/2019
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/16/2019
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/19/2019
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/18/2019
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 09/19/2019
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/16/2019
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 09/18/2019
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 09/16/2019
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 09/18/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 09/16/2019
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 09/23/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 09/26/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 09/27/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/26/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 09/23/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 09/26/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 09/26/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 09/27/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/27/2020
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 08/27/2020
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 08/26/2020
Type: Final
Result: Corrections Issued
Status: Issued
Date: 04/20/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/20/2020
Type: Masonry Wall/Backfill
Result: Partial Inspection
Status: Issued
Date: 04/20/2020
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 04/20/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/03/2019
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 10/02/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 10/02/2019
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 10/03/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/03/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/03/2019
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 10/02/2019
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 10/02/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 03/28/2019
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 12/13/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 12/13/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 10/08/2019
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 10/09/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 10/08/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 10/08/2019
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 10/08/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 10/09/2019
Type: Deputy Reinf. Concrete
Result: Insp Cancelled
Status: Issued
Date: 10/09/2019
Type: Deputy Reinf. Concrete
Result: Insp Cancelled
Status: Issued
Date: 10/08/2019
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 10/08/2019
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 10/09/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 04/20/2020
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 04/20/2020
Type: Masonry Wall/Backfill
Result: Partial Inspection
Status: Issued
Date: 08/28/2020
Type: Plumbing Verification
Result: Pending
Status: Issued
Date: 08/27/2020
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 10/18/2019
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 10/18/2019
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 10/18/2019
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 10/18/2019
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 12/18/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 12/19/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 12/19/2019
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 12/19/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 12/19/2019
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 12/18/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/27/2020
Type: Masonry Wall/Backfill
Result: Partial Inspection
Status: Issued
Date: 04/27/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/28/2020
Type: Masonry Wall/Backfill
Result: Partial Inspection
Status: Issued
Date: 05/08/2019
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 04/27/2020
Type: Masonry Wall/Backfill
Result: Partial Inspection
Status: Issued
Date: 04/27/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/28/2020
Type: Masonry Wall/Backfill
Result: Partial Inspection
Status: Issued
Date: 05/15/2019
Type: METHANE-Barrier
Result: Conditional Approval
Status: Issued
Date: 05/15/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 01/03/2020
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 01/03/2020
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 05/24/2019
Type: Piling/Pier/Caisson
Result: Insp Scheduled
Status: Issued
Date: 05/20/2019
Type: METHANE-Barrier
Result: Conditional Approval
Status: Issued
Date: 05/20/2019
Type: METHANE-Subgrade
Result: Partial Approval
Status: Issued
Date: 05/20/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/07/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/06/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 01/06/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/04/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/07/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/04/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/11/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/11/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/11/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/11/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/15/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/22/2020
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 01/22/2020
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 05/15/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/11/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/11/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/20/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/18/2020
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 05/18/2020
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 05/20/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/12/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 02/12/2020
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 02/12/2020
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 02/12/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 02/14/2020
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 02/14/2020
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 05/28/2020
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 02/21/2020
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 02/21/2020
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 05/28/2020
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 02/28/2020
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 02/28/2020
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 03/05/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 03/03/2020
Type: Insulation
Result: Corrections Issued
Status: Issued
Date: 03/03/2020
Type: Insulation
Result: Corrections Issued
Status: Issued
Date: 03/02/2020
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 03/04/2020
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 03/04/2020
Type: Structural Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/05/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 03/02/2020
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 03/04/2020
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 03/04/2020
Type: Structural Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/12/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/12/2020
Type: Insulation
Result: Corrections Issued
Status: Issued
Date: 03/12/2020
Type: Insulation
Result: Corrections Issued
Status: Issued
Date: 03/12/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/17/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 03/17/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/22/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 06/22/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 08/13/2020
Type: Heat,Vent,A/C Verification
Result: Pending
Status: Issued
Date: 08/13/2020
Type: Pressure Vessel Verification
Result: Not Applicable
Status: Issued
Date: 08/12/2020
Type: Green Building Final
Result: Partial Inspection
Status: Issued
Date: 08/13/2020
Type: Elevator Verification
Result: OK for CofO
Status: Issued
Date: 08/13/2020
Type: Electrical Verification
Result: CofO on Hold
Status: Issued
Date: 08/13/2020
Type: Plumbing Verification
Result: Pending
Status: Issued
Date: 08/13/2020
Type: Electrical Verification
Result: CofO on Hold
Status: Issued
Date: 08/13/2020
Type: Fire Sprinkler Verification
Result: OK for CofO
Status: Issued
Date: 08/13/2020
Type: Plumbing Verification
Result: Pending
Status: Issued
Date: 08/13/2020
Type: Grading Verification
Result: CofO on Hold
Status: Issued
Date: 08/13/2020
Type: Heat,Vent,A/C Verification
Result: Pending
Status: Issued
Date: 08/13/2020
Type: Pressure Vessel Verification
Result: Not Applicable
Status: Issued
Date: 08/13/2020
Type: Elevator Verification
Result: OK for CofO
Status: Issued
Date: 08/13/2020
Type: Fire Sprinkler Verification
Result: OK for CofO
Status: Issued
Date: 08/12/2020
Type: Green Building Final
Result: Partial Inspection
Status: Issued
Date: 08/13/2020
Type: Grading Verification
Result: CofO on Hold
Status: Issued
Date: 10/19/2020
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 10/19/2020
Type: Green Building Final
Result: Partial Inspection
Status: Issued
Date: 10/19/2020
Type: Final
Result: Partial Inspection
Status: Issued
Date: 10/19/2020
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 10/19/2020
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 10/19/2020
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 10/19/2020
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 10/19/2020
Type: Green Building Final
Result: Partial Inspection
Status: Issued
Date: 10/19/2020
Type: Smoke Detectors
Result: Partial Inspection
Status: Issued
Date: 10/19/2020
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 10/19/2020
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 10/19/2020
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 10/19/2020
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 10/19/2020
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 10/19/2020
Type: Smoke Detectors
Result: Partial Inspection
Status: Issued
Date: 10/19/2020
Type: Final
Result: Partial Inspection
Status: Issued
Date: 10/27/2020
Type: Final
Result: Partial Inspection
Status: Issued
Date: 10/27/2020
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 10/27/2020
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 10/27/2020
Type: Final
Result: Partial Inspection
Status: Issued
Date: 10/27/2020
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 10/27/2020
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 10/27/2020
Type: Green Building Final
Result: Partial Inspection
Status: Issued
Date: 10/27/2020
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 10/27/2020
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 10/27/2020
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 10/28/2020
Type: Electrical Verification
Result: OK for CofO
Status: Issued
Date: 10/27/2020
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 10/27/2020
Type: Smoke Detectors
Result: Partial Inspection
Status: Issued
Date: 10/28/2020
Type: Electrical Verification
Result: OK for CofO
Status: Issued
Date: 10/27/2020
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 10/27/2020
Type: Green Building Final
Result: Partial Inspection
Status: Issued
Date: 10/27/2020
Type: Smoke Detectors
Result: Partial Inspection
Status: Issued
Date: 10/27/2020
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 12/15/2020
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 12/15/2020
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 12/15/2020
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 12/15/2020
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 12/15/2020
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 12/15/2020
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 12/15/2020
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 12/15/2020
Type: Final
Result: Partial Inspection
Status: Issued
Date: 12/15/2020
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 12/15/2020
Type: Green Building Final
Result: Approved
Status: Issued
Date: 12/15/2020
Type: Smoke Detectors
Result: Partial Inspection
Status: Issued
Date: 12/15/2020
Type: Green Building Final
Result: Approved
Status: Issued
Date: 12/15/2020
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 12/15/2020
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 12/15/2020
Type: Smoke Detectors
Result: Partial Inspection
Status: Issued
Date: 12/15/2020
Type: Final
Result: Partial Inspection
Status: Issued
Date: 02/02/2023
Type: Smoke Detectors
Result: Insp Cancelled
Status: Issued
Date: 02/02/2023
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 02/02/2023
Type: SGSOV-Seismic Gas S/O Valve
Result: Insp Cancelled
Status: Issued
Date: 02/02/2023
Type: Structural Steel Frame
Result: Insp Cancelled
Status: Issued
Date: 02/02/2023
Type: Final
Result: Insp Cancelled
Status: Issued
Date: 02/02/2023
Type: Drywall Nailing
Result: Insp Cancelled
Status: Issued
Date: 02/02/2023
Type: Wood Frame
Result: Insp Cancelled
Status: Issued
Date: 02/02/2023
Type: SGSOV-Seismic Gas S/O Valve
Result: Insp Cancelled
Status: Issued
Date: 02/02/2023
Type: Structural Steel Frame
Result: Insp Cancelled
Status: Issued
Date: 02/02/2023
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 02/02/2023
Type: Wood Frame
Result: Insp Cancelled
Status: Issued
Date: 02/02/2023
Type: Final
Result: Insp Cancelled
Status: Issued
Date: 02/02/2023
Type: Smoke Detectors
Result: Insp Cancelled
Status: Issued
Date: 02/02/2023
Type: Drywall Nailing
Result: Insp Cancelled
Status: Issued
Date: 06/07/2023
Type: Public Counter
Result: Completed
Status: Issued
Date: 06/07/2023
Type: Public Counter
Result: Completed
Status: Issued
Date: 11/08/2023
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 11/08/2023
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 01/26/2024
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 01/26/2024
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 02/06/2024
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 02/06/2024
Type: Structural Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 02/06/2024
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 02/06/2024
Type: Final
Result: Corrections Issued
Status: Issued
Date: 02/06/2024
Type: Structural Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 02/06/2024
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 02/06/2024
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 02/06/2024
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 02/06/2024
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 02/06/2024
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 02/06/2024
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 02/06/2024
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 02/06/2024
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 02/06/2024
Type: Final
Result: Corrections Issued
Status: Issued
Date: 04/24/2024
Type: Wood Frame
Result: Approved
Status: CofO in Progress
Date: 04/24/2024
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: CofO in Progress
Date: 04/24/2024
Type: Structural Steel Frame
Result: Approved
Status: CofO in Progress
Date: 04/24/2024
Type: Drywall Nailing
Result: Approved
Status: CofO in Progress
Date: 04/24/2024
Type: Reinforced Concrete Frame
Result: Approved
Status: CofO in Progress
Date: 04/25/2024
Type: CofO Issuance
Result: CofO in Progress
Status: CofO in Progress
Date: 04/24/2024
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: CofO in Progress
Date: 04/24/2024
Type: Smoke Detectors
Result: Approved
Status: CofO in Progress
Date: 04/24/2024
Type: Structural Steel Frame
Result: Approved
Status: CofO in Progress
Date: 04/24/2024
Type: Drywall Nailing
Result: Approved
Status: CofO in Progress
Date: 04/24/2024
Type: Reinforced Concrete Frame
Result: Approved
Status: CofO in Progress
Date: 04/24/2024
Type: Final
Result: OK to Issue CofO
Status: CofO in Progress
Date: 04/24/2024
Type: Wood Frame
Result: Approved
Status: CofO in Progress
Date: 04/25/2024
Type: CofO Issuance
Result: CofO in Progress
Status: CofO in Progress
Date: 04/24/2024
Type: Final
Result: OK to Issue CofO
Status: CofO in Progress
Date: 04/24/2024
Type: Smoke Detectors
Result: Approved
Status: CofO in Progress
Date: 05/02/2024
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 05/02/2024
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 05/02/2024
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 05/02/2024
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 05/02/2024
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 05/02/2024
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
SHAWMUT WOODWORKING & SUPPLY INC

License number: 747583
Type: B
Phone: Speak with a Permit Expert
Location: BOSTON, MA

Permit Applicant

Principal: MATTHEW KOLIN TRIPP

Type:

Address: 1310 MONTANA AVE, 2ND FL, SANTA MONICA, CA

Phone:

Experience: years

Applicant: BLAKE FOGEL