Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

NEW MIXED USE BUILDING: APARTMENT (20 LOW INCOME UNITS AND 1 REGULAR U

Inspection Activity
Date: 05/25/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/30/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/29/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/01/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 05/31/2018
Type: Deputy Grading
Result: Partial Approval
Status: Issued
Date: 06/05/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 06/05/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/15/2018
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 06/15/2018
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 06/15/2018
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 06/15/2018
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 06/22/2018
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 06/18/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/29/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/25/2018
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 06/28/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/25/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/27/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/26/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/25/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 06/25/2018
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 07/05/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 07/05/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/05/2018
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 07/03/2018
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 07/05/2018
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 07/11/2018
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 07/12/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 07/10/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 07/11/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 07/13/2018
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 07/09/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 07/17/2018
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 07/17/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 07/20/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 07/17/2018
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 07/16/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 07/19/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 07/18/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 07/20/2018
Type: Deputy Grading
Result: Partial Approval
Status: Issued
Date: 07/17/2018
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 07/08/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 07/08/2019
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 07/26/2018
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 07/26/2018
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 07/25/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 07/27/2018
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 07/23/2018
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 07/27/2018
Type: Reinforced Masonry Frame
Result: Cancelled
Status: Issued
Date: 07/26/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 07/24/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 07/24/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 07/26/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 07/26/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 07/30/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 07/31/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 08/03/2018
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 08/03/2018
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 08/01/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 07/30/2018
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 08/02/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 08/06/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 08/08/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 08/07/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 08/10/2018
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 08/09/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 08/07/2018
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 08/07/2018
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 08/07/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 08/13/2018
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 08/14/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 08/13/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 08/17/2018
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 08/15/2018
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 08/16/2018
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 08/23/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/24/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/22/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/20/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/21/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 09/21/2018
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 09/25/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 09/26/2018
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 09/28/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/27/2018
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 09/26/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 09/24/2018
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 09/24/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 09/24/2018
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 09/24/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/02/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 10/02/2018
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 10/02/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 10/02/2018
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 10/01/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/05/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/11/2018
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 08/30/2019
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 11/07/2018
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 11/07/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/07/2018
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 11/05/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/08/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/07/2018
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 11/09/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/09/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/06/2018
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/29/2019
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/18/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/04/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 12/31/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 09/06/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 01/08/2019
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 01/25/2019
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 01/25/2019
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 01/25/2019
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 01/24/2019
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/01/2019
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 01/28/2019
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 01/30/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 02/01/2019
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 02/01/2019
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 12/05/2019
Type: Elevator Verification
Result: OK for CofO
Status: Issued
Date: 12/05/2019
Type: AIM Verification
Result: Not Applicable
Status: Issued
Date: 02/07/2019
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/07/2019
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/14/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Cancelled
Status: Issued
Date: 12/05/2019
Type: Pressure Vessel Verification
Result: OK for CofO
Status: Issued
Date: 02/21/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 12/05/2019
Type: Plumbing Verification
Result: CofO on Hold
Status: Issued
Date: 12/05/2019
Type: Electrical Verification
Result: CofO on Hold
Status: Issued
Date: 12/05/2019
Type: Heat,Vent,A/C Verification
Result: CofO on Hold
Status: Issued
Date: 12/05/2019
Type: Grading Verification
Result: CofO on Hold
Status: Issued
Date: 12/05/2019
Type: Fire Sprinkler Verification
Result: CofO on Hold
Status: Issued
Date: 03/01/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 03/04/2019
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 03/07/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 03/13/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 12/09/2019
Type: TCO Sprinkler Verification
Result: Completed (special insp)
Status: Issued
Date: 12/09/2019
Type: TCO Electrical Verification
Result: Completed (special insp)
Status: Issued
Date: 12/09/2019
Type: TCO Heat,Vent,A/C Verification
Result: Completed (special insp)
Status: Issued
Date: 12/09/2019
Type: TCO Grading Verification
Result: Completed (special insp)
Status: Issued
Date: 12/09/2019
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Date: 04/04/2019
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 04/02/2019
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 04/09/2019
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 04/09/2019
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 12/18/2019
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 12/18/2019
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 12/18/2019
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 12/18/2019
Type: Green Building Final
Result: Approved
Status: Issued
Date: 12/18/2019
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 12/18/2019
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 12/18/2019
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 12/18/2019
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: Issued
Date: 04/29/2019
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 04/29/2019
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 04/29/2019
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 12/26/2019
Type: Electrical Verification
Result: OK for CofO
Status: Issued
Date: 05/07/2019
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 05/07/2019
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/07/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/15/2019
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/20/2019
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 05/20/2019
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 01/17/2020
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 01/17/2020
Type: Final
Result: OK to Issue CofO
Status: CofO Issued
Date: 01/17/2020
Type: CofO Issuance
Result: CofO in Progress
Status: CofO Issued
Date: 01/14/2020
Type: Plumbing Verification
Result: OK for CofO
Status: CofO Issued
Date: 01/17/2020
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 01/15/2020
Type: Heat,Vent,A/C Verification
Result: OK for CofO
Status: CofO Issued
Date: 01/17/2020
Type: Verify Sprinkler Sign Off
Result: Approved
Status: CofO Issued
Date: 01/17/2020
Type: Reinforced Concrete Frame
Result: Approved
Status: CofO Issued
Date: 01/17/2020
Type: Wood Frame
Result: Approved
Status: CofO Issued
Date: 01/17/2020
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 09/13/2021
Type: Inspection
Result: Permit Finaled
Status: CofO Corrected
Date: 09/13/2021
Type: CofO Issuance
Result: CofO Corrected
Status: CofO Corrected
Date: 09/13/2021
Type: Inspection
Result: Permit Finaled
Status: CofO Corrected
Date: 09/13/2021
Type: Inspection
Result: OK for CofO
Status: CofO Corrected
Date: 09/13/2021
Type: CofO Issuance
Result: CofO in Progress
Status: CofO Corrected
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
UNITED BUILDING COMPANY INC.

License number: 10304972
Type: B
Phone: Speak with a Permit Expert
Location: TORRANCE, CA

Permit Applicant

Principal: MARK LAWRENCE WALTHER

Type:

Address: 8563 VENICE BLVD., LOS ANGELES , CA

Phone:

Experience: years

Applicant: DAVID RIVERA