Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

<TOC-TIER 2>7 story mixed-use 67 units apartment with Cafe (core and s

Inspection Activity
Date: 08/20/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 08/21/2020
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 08/25/2020
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 08/25/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 08/25/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 04/29/2020
Type: Piling/Pier/Caisson
Result: Conditional Approval
Status: Issued
Date: 05/15/2020
Type: METHANE-Subgrade
Result: Insp Scheduled
Status: Issued
Date: 05/15/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/15/2020
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 05/15/2020
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 09/10/2020
Type: Piling/Pier/Caisson
Result: Not Ready for Inspection
Status: Issued
Date: 09/11/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/28/2020
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 09/09/2020
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 05/18/2020
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 05/19/2020
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 05/29/2020
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 05/29/2020
Type: METHANE-Subgrade
Result: Insp Scheduled
Status: Issued
Date: 05/29/2020
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 05/29/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/17/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/03/2020
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 06/03/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/04/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/10/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/11/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 06/11/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/11/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/09/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/23/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/19/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/16/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/18/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/17/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/18/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/16/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 06/16/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 06/16/2020
Type: METHANE-Rough
Result: Approved
Status: Issued
Date: 06/16/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 06/15/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/15/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/15/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/18/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/19/2020
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 06/17/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/22/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/22/2020
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 09/24/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 06/26/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 06/26/2020
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 06/26/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 06/25/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 06/26/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 06/22/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/23/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 06/24/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 06/26/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/09/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 07/09/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/10/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/23/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/22/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/22/2020
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 09/24/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 07/16/2020
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 07/16/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 07/17/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/16/2020
Type: Deputy Reinf. Concrete
Result: Insp Cancelled
Status: Issued
Date: 07/16/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 07/17/2020
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 04/29/2021
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 01/22/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/20/2020
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 07/22/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/29/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/21/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 01/21/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/07/2020
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 10/08/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/08/2020
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 10/08/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 10/06/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 08/12/2020
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 08/13/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/14/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/13/2020
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 08/14/2020
Type: Piling/Pier/Caisson
Result: Insp Scheduled
Status: Issued
Date: 10/07/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/08/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/08/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 10/09/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/07/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/09/2020
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 04/30/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/14/2020
Type: Reinforced Concrete Frame
Result: Cancelled
Status: Issued
Date: 10/14/2020
Type: Green Building Rough
Result: Cancelled
Status: Issued
Date: 10/15/2020
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 10/14/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/15/2020
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 10/14/2020
Type: Verify Sprinkler Sign Off
Result: Cancelled
Status: Issued
Date: 10/14/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 01/25/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/19/2020
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 10/19/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/23/2020
Type: Piling/Pier/Caisson
Result: Insp Scheduled
Status: Issued
Date: 10/19/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/21/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/21/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/21/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/22/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/26/2020
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 10/26/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/29/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 10/29/2020
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 10/29/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/26/2020
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 10/29/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 02/05/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/02/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 02/02/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/02/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 02/02/2021
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 02/02/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 02/11/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 11/17/2020
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 11/16/2020
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 11/17/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/17/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/19/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/18/2020
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/19/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 11/16/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/19/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 11/19/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 11/18/2020
Type: Piling/Pier/Caisson
Result: Not Ready for Inspection
Status: Issued
Date: 02/10/2021
Type: Footing/Foundation/Slab
Result: Cancelled
Status: Issued
Date: 02/11/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/09/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/12/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/12/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 11/25/2020
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 11/24/2020
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 12/01/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 12/02/2020
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 08/17/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 12/09/2020
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 12/10/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 12/10/2020
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 12/10/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/11/2020
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 12/09/2020
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 12/09/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 12/09/2020
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 12/09/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 12/08/2020
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 12/17/2020
Type: Deputy Reinf. Concrete
Result: Insp Cancelled
Status: Issued
Date: 12/15/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 12/17/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/15/2020
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 05/13/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 08/16/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 03/01/2021
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 03/01/2021
Type: Verify Sprinkler Sign Off
Result: Partial Approval
Status: Issued
Date: 03/01/2021
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 05/20/2021
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 05/21/2021
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 03/10/2021
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 03/10/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 08/24/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 03/19/2021
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 03/18/2021
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 03/18/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Cancelled
Status: Issued
Date: 03/19/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/26/2021
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 05/26/2021
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 05/25/2021
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 05/26/2021
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 05/26/2021
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 12/02/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 04/07/2021
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 04/07/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 06/03/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 09/02/2021
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 09/01/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 06/25/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 09/10/2021
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 09/14/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 09/15/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 07/14/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 12/09/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 08/03/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 08/05/2021
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 10/01/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 10/06/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/22/2021
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 10/22/2021
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 11/16/2021
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 11/16/2021
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 03/15/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/28/2022
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 06/16/2022
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 02/10/2022
Type: Wood Frame
Result: Approved
Status: Issued
Date: 02/10/2022
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 02/10/2022
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 02/17/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/30/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/08/2022
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 04/08/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/26/2022
Type: Interior/Exterior Lathing
Result: Conditional Approval
Status: Issued
Date: 09/15/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/18/2022
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 05/25/2022
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 08/02/2022
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 10/21/2022
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 10/21/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/25/2022
Type: Interior/Exterior Lathing
Result: Not Ready for Inspection
Status: Issued
Date: 11/09/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/09/2022
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/07/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 12/07/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/08/2022
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 12/06/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/06/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 09/29/2023
Type: Reinforced Concrete Frame
Result: Approved
Status: Issued
Date: 09/29/2023
Type: Final
Result: Partial Inspection
Status: Issued
Date: 09/29/2023
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 09/29/2023
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: Issued
Date: 09/29/2023
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 09/29/2023
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 09/29/2023
Type: Green Building Final
Result: Approved
Status: Issued
Date: 09/29/2023
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 05/10/2023
Type: Masonry Wall/Backfill
Result: Partial Inspection
Status: Issued
Date: 05/10/2023
Type: Masonry Wall/Backfill
Result: Partial Inspection
Status: Issued
Date: 05/10/2023
Type: Masonry Wall/Backfill
Result: Partial Inspection
Status: Issued
Date: 10/11/2023
Type: Final
Result: OK for TCO
Status: Issued
Date: 05/10/2023
Type: Masonry Wall/Backfill
Result: Partial Inspection
Status: Issued
Date: 10/11/2023
Type: T-Bar Ceiling
Result: Approved
Status: Issued
Date: 04/01/2024
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 04/18/2024
Type: Final
Result: Partial Inspection
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
HY-MAX BUILDING CORP

License number: 702339
Type: B
Phone: Speak with a Permit Expert
Location: VALENCIA, CA

Permit Applicant

Principal: MICHAEL DAVID BLAHA

Type:

Address: 800 S. FIGUEROA ST., SUITE #960, LOS ANGELES, CA

Phone:

Experience: years

Applicant: HIRO KOBYASHI