Bldg-Alter/Repair Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

SUPPLEMENTAL PERMIT TO #17010-10000-04815 FOR STRUCTURAL CHANGES ONLY

Inspection Activity
Date: 08/10/2021
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 08/09/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/11/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/09/2021
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 08/09/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 08/10/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/11/2021
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 08/13/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 08/16/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 08/20/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/18/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 08/19/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/20/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/16/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/19/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 08/17/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/17/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 08/19/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 08/18/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/20/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 08/19/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/20/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 08/20/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 08/19/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/18/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/25/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/25/2021
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 08/23/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/23/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/24/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 08/27/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 08/23/2021
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 08/26/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/24/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/02/2021
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/03/2021
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/03/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/02/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 09/03/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/02/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/31/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 09/03/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 09/01/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 09/03/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 09/09/2021
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 09/09/2021
Type: Deputy Reinf. Concrete
Result: Insp Cancelled
Status: Issued
Date: 09/07/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 09/08/2021
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 09/09/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 09/07/2021
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 09/08/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 09/08/2021
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 09/09/2021
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 09/07/2021
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 09/08/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/10/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 09/16/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/15/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/17/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/15/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/14/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/17/2021
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/14/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/16/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/20/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 07/23/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/21/2021
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/20/2021
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/23/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 07/20/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/22/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/23/2021
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 07/21/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/22/2021
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 09/20/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 07/30/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 07/26/2021
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 07/29/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 07/26/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 07/26/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 09/20/2021
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 09/20/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/14/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 12/17/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 12/16/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 12/15/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 08/06/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/02/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/06/2021
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/05/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/05/2021
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/28/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/28/2021
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/30/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 09/27/2021
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/29/2021
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 09/30/2021
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 09/29/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 10/01/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/30/2021
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 09/30/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 09/29/2021
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 09/27/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 09/28/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/01/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 10/01/2021
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/01/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 09/27/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/13/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/04/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/06/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/08/2021
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/07/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 10/05/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 10/05/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/05/2021
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 10/05/2021
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 10/08/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/07/2021
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 10/06/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/07/2021
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 10/08/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/06/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/20/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/19/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/18/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/18/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/18/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 10/19/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/20/2021
Type: Deputy Pre-Stress Concrete
Result: Approved
Status: Issued
Date: 10/19/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/20/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/12/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/12/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 11/12/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 11/12/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/17/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/18/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/18/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/17/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/16/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/16/2021
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 11/15/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/17/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/15/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/16/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 11/15/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 11/18/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/18/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/16/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/15/2021
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 11/17/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/20/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 01/21/2022
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 01/21/2022
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 01/21/2022
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 01/26/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 01/25/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 01/24/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 02/10/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 02/11/2022
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 02/15/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 02/16/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 02/18/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 02/14/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 02/22/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 02/23/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 02/25/2022
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 02/24/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 12/14/2023
Type: Inspection
Result: Permit Finaled
Status: Permit Finaled
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
LENDLEASE (US) CONSTRUCTION INC

License number: 483550
Type: B
Phone: Speak with a Permit Expert
Location: NEW YORK, NY

Permit Applicant

Principal: JOSEPH PAUL WATHEN

Type:

Address: 725 S. FIGUEROA STREET, SUITE 1080, LOS ANGELES, CA

Phone:

Experience: years

Applicant: JEFF CHANG