Bldg-Alter/Repair Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

FOUNDATION ONLY EARLY START PERMIT PER IB P/BC 2017-097, FOR BILDING P

Inspection Activity
Date: 05/31/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 05/30/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/29/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/29/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/27/2020
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 10/23/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/23/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/22/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/12/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/11/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/14/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/14/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/14/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/11/2019
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 06/12/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 10/25/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/23/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/22/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/24/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/21/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/22/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 03/25/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/18/2019
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 03/26/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 03/26/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/01/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/31/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/30/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/12/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/11/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/14/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/14/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/14/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/11/2019
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 06/12/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 10/31/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/28/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/12/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 07/10/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/11/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 08/14/2019
Type: Deputy Shotcrete
Result: Insp Cancelled
Status: Issued
Date: 08/13/2019
Type: Deputy Shotcrete
Result: Insp Cancelled
Status: Issued
Date: 07/19/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 07/16/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/17/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/19/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 07/16/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/17/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/05/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 11/04/2019
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 11/06/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 11/05/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 11/05/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/07/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/08/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 07/22/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 07/23/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/23/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/23/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/22/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/23/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/22/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/06/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/10/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/01/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/29/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/02/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/02/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 07/30/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/02/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 07/29/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/30/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/31/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/30/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/30/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 08/01/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 08/01/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/29/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/02/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 11/15/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 11/12/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/14/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/15/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 08/08/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/07/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/06/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/12/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 11/14/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 11/13/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/09/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/10/2020
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 04/08/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 08/23/2019
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 08/23/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/21/2019
Type: Deputy Shotcrete
Result: Insp Cancelled
Status: Issued
Date: 08/22/2019
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 08/20/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 08/20/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 11/22/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/21/2019
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 11/18/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/21/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/20/2019
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 11/20/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/20/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 11/19/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/26/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 08/29/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 08/26/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/26/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 08/30/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 11/21/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 11/22/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 09/05/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/15/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 11/26/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/26/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 11/27/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/25/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/25/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 11/27/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 11/27/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 01/17/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/14/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/16/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/16/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 01/18/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 09/13/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/11/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/13/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 09/11/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/11/2019
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 09/12/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 09/11/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/12/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 09/12/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/10/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 01/30/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/29/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/28/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/03/2019
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 09/17/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/18/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/16/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/18/2019
Type: Reinforced Concrete Frame
Result: Conditional Approval
Status: Issued
Date: 09/19/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 09/19/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/20/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 02/11/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/19/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/18/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/06/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 12/03/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/04/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/04/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/03/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/05/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/02/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 12/02/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/28/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 09/24/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/27/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 09/25/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/26/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/04/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/13/2019
Type: Deputy Other (see comments)
Result: Insp Scheduled
Status: Issued
Date: 12/10/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/03/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/03/2019
Type: Deputy Reinf. Concrete
Result: Insp Cancelled
Status: Issued
Date: 10/01/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/04/2019
Type: Deputy Reinf. Concrete
Result: Insp Cancelled
Status: Issued
Date: 10/04/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/02/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/03/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 03/19/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/20/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/03/2019
Type: Structural Steel Frame
Result: Insp Cancelled
Status: Issued
Date: 10/02/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 10/02/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/12/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/12/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/11/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/29/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/29/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 03/26/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/12/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/09/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/13/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/17/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/09/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/02/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/02/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/07/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/08/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/11/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/08/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 10/09/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/09/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/10/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/11/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/17/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/16/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/16/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/15/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/16/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 10/18/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/17/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/15/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/17/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/16/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/24/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/24/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/24/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/19/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/20/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/18/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/19/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/19/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/01/2019
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 05/03/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/03/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/29/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/03/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 05/03/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/09/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/06/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/06/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/10/2019
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 05/07/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/07/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/13/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/16/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/13/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/02/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/30/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/03/2020
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 12/31/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/23/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/22/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/21/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/21/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/06/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 01/09/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/10/2020
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 01/07/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/06/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/07/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/10/2020
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 01/08/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/14/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/17/2020
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 01/17/2020
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 01/14/2020
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 01/15/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/16/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/16/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/15/2020
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 01/13/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/15/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/24/2020
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 01/23/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/23/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/24/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/23/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/24/2020
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 01/21/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/22/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/09/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/28/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/30/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/31/2020
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 02/07/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/06/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 02/06/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 02/07/2020
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 02/04/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 02/07/2020
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 02/05/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/06/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/04/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/05/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 02/14/2020
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 02/19/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/19/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/17/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/26/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 02/24/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/26/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/27/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/27/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/28/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/28/2020
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 02/27/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 02/28/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/02/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/09/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 03/13/2020
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 03/18/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 03/20/2020
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 03/19/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 09/22/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 09/25/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/22/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 09/25/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/14/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/29/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 10/16/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/15/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/29/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/27/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/22/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/29/2020
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 02/12/2021
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 02/11/2021
Type: Deputy Other (see comments)
Result: Insp Scheduled
Status: Issued
Date: 02/11/2021
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 02/12/2021
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/04/2020
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 12/03/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/02/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/03/2020
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 12/01/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/09/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/11/2020
Type: Deputy Other (see comments)
Result: Insp Scheduled
Status: Issued
Date: 12/10/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/11/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/11/2020
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 12/10/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/10/2020
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 05/14/2021
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 05/14/2021
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 03/11/2021
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 03/12/2021
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 03/08/2021
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 03/10/2021
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 03/09/2021
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 05/26/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/02/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/01/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/08/2021
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/09/2021
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/07/2021
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 03/14/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/14/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
HOPKINS GEORGE C CONSTRUCTION CO INC

License number: 397266
Type: B
Phone: Speak with a Permit Expert
Location: GLENDALE, CA

Permit Applicant

Principal: GARY JOSEPH HOPKINS

Type:

Address: 724 S SPRING ST., #501, LOS ANGELES, CA

Phone:

Experience: years

Applicant: MORGAN JAYBUSH