Nonbldg-New Permit

PCIS Permit#: 17020-10000-02369

Address: 100 WORLD, Los Angeles, 90045

Status: Permit Finaled

Status Date: 10/30/2019

Tract: RANCHO SAUSAL REDONDO

Property Identifier: Block: , Lot: LT 38, Zone: LAX

Assessor Information: Book: 4117, Page: 34, Parcel: 900

Census Tract: 9800.28

Work Description

TEMPORARY EARTH RETAINTION SHORING TO ALLOW REMOVAL OF EXISTING RETAIN

Inspection Activity
Date: 04/20/2018
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/17/2018
Type: Footing/Foundation/Slab
Result: Conditional Approval
Status: Issued
Date: 04/16/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/18/2018
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 04/19/2018
Type: Footing/Foundation/Slab
Result: Conditional Approval
Status: Issued
Date: 04/17/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/17/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Conditional Approval
Status: Issued
Date: 04/16/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/16/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/19/2018
Type: Piling/Pier/Caisson
Result: Conditional Approval
Status: Issued
Date: 04/17/2018
Type: Piling/Pier/Caisson
Result: Conditional Approval
Status: Issued
Date: 04/19/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/19/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 04/18/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Conditional Approval
Status: Issued
Date: 04/18/2018
Type: Piling/Pier/Caisson
Result: Conditional Approval
Status: Issued
Date: 04/20/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/18/2018
Type: Footing/Foundation/Slab
Result: Conditional Approval
Status: Issued
Date: 04/16/2018
Type: Piling/Pier/Caisson
Result: Conditional Approval
Status: Issued
Date: 05/04/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 05/01/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 05/03/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 05/01/2018
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 05/01/2018
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/30/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 05/02/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 05/17/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 05/16/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 05/18/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 05/15/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 05/23/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 05/24/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 05/21/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 05/25/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 05/22/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 05/30/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 05/31/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 06/01/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 06/06/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 06/08/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 06/05/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 06/04/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 06/07/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 06/07/2018
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/15/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 06/12/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 06/14/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/11/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/13/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 06/13/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/14/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/12/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/13/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/11/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/12/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/15/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/15/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/14/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 06/21/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 06/19/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 06/20/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 06/22/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 06/28/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/27/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/29/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 06/26/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 06/27/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/13/2018
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 06/26/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/25/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/26/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/26/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/27/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 06/27/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/29/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/29/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/28/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/28/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 06/29/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/25/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/25/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/28/2018
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/25/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/30/2019
Type: Final
Result: Permit Finaled
Status: Permit Finaled
Date: 03/28/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Conditional Approval
Status: Issued
Date: 07/02/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/05/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 07/05/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/06/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 07/03/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/02/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 07/03/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/06/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/03/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 07/06/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 07/02/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/05/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/01/2019
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 04/12/2018
Type: Piling/Pier/Caisson
Result: Conditional Approval
Status: Issued
Date: 04/12/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 04/13/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 04/09/2018
Type: Footing/Foundation/Slab
Result: Conditional Approval
Status: Issued
Date: 04/12/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Conditional Approval
Status: Issued
Date: 04/09/2018
Type: Piling/Pier/Caisson
Result: Conditional Approval
Status: Issued
Date: 04/10/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 04/09/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Conditional Approval
Status: Issued
Date: 04/13/2018
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 04/13/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 04/11/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 04/10/2018
Type: Piling/Pier/Caisson
Result: Conditional Approval
Status: Issued
Date: 04/10/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Conditional Approval
Status: Issued
Date: 04/12/2018
Type: Footing/Foundation/Slab
Result: Conditional Approval
Status: Issued
Date: 04/13/2018
Type: Piling/Pier/Caisson
Result: Insp Scheduled
Status: Issued
Date: 07/13/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 07/09/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/11/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 04/12/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 04/12/2018
Type: Piling/Pier/Caisson
Result: Conditional Approval
Status: Issued
Date: 04/13/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 04/09/2018
Type: Footing/Foundation/Slab
Result: Conditional Approval
Status: Issued
Date: 04/12/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Conditional Approval
Status: Issued
Date: 04/09/2018
Type: Piling/Pier/Caisson
Result: Conditional Approval
Status: Issued
Date: 04/09/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Conditional Approval
Status: Issued
Date: 04/10/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 04/13/2018
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 04/13/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 04/11/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 04/10/2018
Type: Piling/Pier/Caisson
Result: Conditional Approval
Status: Issued
Date: 04/10/2018
Type: Excavation/Setback/Form/Re-Bar
Result: Conditional Approval
Status: Issued
Date: 04/12/2018
Type: Footing/Foundation/Slab
Result: Conditional Approval
Status: Issued
Date: 04/13/2018
Type: Piling/Pier/Caisson
Result: Insp Scheduled
Status: Issued
Date: 07/09/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/12/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 07/24/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 07/26/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 07/26/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 07/25/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 07/23/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 07/25/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 07/27/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 07/27/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 07/31/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/02/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/31/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/31/2018
Type: Deputy Grading
Result: Approved
Status: Issued
Date: 07/30/2018
Type: Deputy Grading
Result: Approved
Status: Issued
Date: 08/03/2018
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 08/03/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/02/2018
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/01/2018
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 08/01/2018
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/01/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 08/08/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 08/09/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 08/10/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 08/06/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 08/13/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 08/14/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 08/15/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 08/21/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 08/20/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 08/22/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 08/23/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 08/24/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 09/05/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/07/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 09/06/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/14/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 09/11/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/14/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 09/11/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/13/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/13/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/10/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/10/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/12/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/12/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/18/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/19/2018
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 09/21/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/17/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/19/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/20/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/28/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 09/26/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/27/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/24/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/25/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/26/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 10/22/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/26/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 10/23/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/24/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/24/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/23/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/25/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 10/25/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 11/07/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 11/09/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 11/08/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 11/06/2018
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 11/16/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 11/15/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 11/14/2018
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
G G G DEMOLITION INC

License number: 988669
Type: A
Phone: Speak with a Permit Expert
Location: ORANGE, CA

Permit Applicant

Principal: GREGG ANDREW MILLER
Type:
Address: 1439 W. CHAPMAN AVE., STE 178, ORANGE, CA
Phone:
Experience: years
Applicant: GREG MILLER