Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

New 7 Story 81-unit Apartment Building with 2-Story Subterranean Parki

Inspection Activity
Date: 08/17/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/20/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/18/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 08/21/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 08/21/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/19/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/18/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/22/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 08/28/2020
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 04/23/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 08/24/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 04/29/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/01/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 08/31/2020
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 05/07/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/06/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 01/16/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 04/20/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 04/23/2021
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 05/12/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 05/13/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/12/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/12/2020
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 05/11/2020
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 04/23/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 04/19/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/06/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 01/08/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/06/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/04/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/29/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 09/15/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 08/13/2021
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 08/13/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 08/11/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 09/25/2020
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 09/21/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 09/25/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 01/12/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 01/12/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/14/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/25/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 09/25/2020
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 07/07/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 07/09/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 09/21/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 09/25/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 07/17/2020
Type: Masonry Wall/Backfill
Result: Insp Cancelled
Status: Issued
Date: 07/16/2020
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 07/15/2020
Type: Reinforced Masonry Frame
Result: Corrections Issued
Status: Issued
Date: 07/15/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 07/16/2020
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 08/11/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/26/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 04/29/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/02/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/02/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/02/2020
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 09/28/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/30/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/29/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/30/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/01/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/28/2020
Type: Masonry Wall/Backfill
Result: Partial Inspection
Status: Issued
Date: 07/31/2020
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 10/06/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/11/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 08/14/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/11/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/12/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/13/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/05/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/05/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/29/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 08/13/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/29/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 01/25/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Cancelled
Status: Issued
Date: 01/28/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Cancelled
Status: Issued
Date: 01/28/2021
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 05/03/2021
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 05/03/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/01/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 02/04/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Conditional Approval
Status: Issued
Date: 02/01/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 02/04/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/02/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 11/04/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/04/2020
Type: Pre-Inspection
Result: Insp Cancelled
Status: Issued
Date: 11/04/2020
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 11/02/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/02/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 02/02/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/04/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/04/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 11/12/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 11/13/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/12/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/03/2021
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 05/06/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/05/2021
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 05/07/2021
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 05/03/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 02/08/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/19/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/20/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 11/17/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/10/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/05/2021
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 05/03/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 08/16/2021
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 08/20/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/02/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 02/17/2021
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/19/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 02/18/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/09/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Conditional Approval
Status: Issued
Date: 12/07/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 12/09/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 08/20/2021
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 08/18/2021
Type: Light Gage Steel Frame
Result: Cancelled
Status: Issued
Date: 05/11/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/11/2021
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 05/12/2021
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 05/14/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 05/14/2021
Type: Wall Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/14/2021
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 05/12/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 08/20/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 08/20/2021
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 08/16/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 02/23/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 02/22/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 02/22/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/25/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 02/25/2021
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 02/24/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/23/2021
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 11/30/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 05/21/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 05/21/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/19/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/18/2021
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 03/01/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 03/04/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/20/2021
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 05/18/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/19/2021
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 05/18/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/20/2021
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 05/21/2021
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 03/09/2021
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 08/23/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 08/23/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 08/24/2021
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 08/27/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/15/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 08/27/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/25/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/25/2021
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 05/26/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/27/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/24/2021
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 05/25/2021
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 05/24/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/28/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 05/27/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/24/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 03/22/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 03/23/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 03/24/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Conditional Approval
Status: Issued
Date: 03/25/2021
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 03/25/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 03/24/2021
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 05/26/2021
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 05/25/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 08/24/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/30/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/01/2021
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 03/31/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 11/30/2021
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 11/30/2021
Type: Wood Frame
Result: Insp Cancelled
Status: Issued
Date: 06/01/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/01/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 04/05/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 06/03/2021
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 06/04/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/03/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 06/04/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/01/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 04/12/2021
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 04/12/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 04/16/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 06/07/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/11/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/08/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/08/2021
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 06/10/2021
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 06/07/2021
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 06/09/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/10/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/10/2021
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 06/10/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/08/2021
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 08/31/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/16/2021
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 06/15/2021
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 06/15/2021
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 06/16/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/15/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 06/14/2021
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 12/06/2021
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 12/06/2021
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 09/10/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 09/10/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/22/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/24/2021
Type: Wood Frame
Result: Insp Cancelled
Status: Issued
Date: 06/23/2021
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 06/21/2021
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 06/24/2021
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 06/24/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/29/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/01/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/30/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/01/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/30/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 07/02/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 07/01/2021
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 06/30/2021
Type: Wood Frame
Result: Insp Cancelled
Status: Issued
Date: 06/29/2021
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 12/06/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/06/2021
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 07/07/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/08/2021
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 07/07/2021
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 07/07/2021
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 07/09/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 07/06/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/09/2021
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 07/09/2021
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 07/09/2021
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 09/13/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/13/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/12/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/12/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/15/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/07/2022
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 07/20/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/22/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/20/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 07/23/2021
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 07/20/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/10/2022
Type: Drywall Nailing
Result: Insp Cancelled
Status: Issued
Date: 03/10/2022
Type: SGSOV-Seismic Gas S/O Valve
Result: Insp Cancelled
Status: Issued
Date: 03/10/2022
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 09/22/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/29/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/26/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/26/2021
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 07/26/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/26/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 08/05/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 08/02/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/10/2022
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 03/07/2022
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 03/10/2022
Type: Final
Result: Partial Inspection
Status: Issued
Date: 03/07/2022
Type: Smoke Detectors
Result: Insp Cancelled
Status: Issued
Date: 03/10/2022
Type: Green Building Final
Result: Insp Cancelled
Status: Issued
Date: 03/10/2022
Type: Wood Frame
Result: Insp Cancelled
Status: Issued
Date: 03/07/2022
Type: Drywall Nailing
Result: Insp Cancelled
Status: Issued
Date: 03/07/2022
Type: Green Building Final
Result: Insp Cancelled
Status: Issued
Date: 03/07/2022
Type: Wood Frame
Result: Insp Cancelled
Status: Issued
Date: 03/07/2022
Type: Reinforced Masonry Frame
Result: Insp Cancelled
Status: Issued
Date: 10/07/2021
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 10/07/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 03/07/2022
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 12/21/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/22/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 03/10/2022
Type: Smoke Detectors
Result: Insp Cancelled
Status: Issued
Date: 03/10/2022
Type: Reinforced Masonry Frame
Result: Insp Cancelled
Status: Issued
Date: 03/07/2022
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 10/18/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/18/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 03/10/2022
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 03/07/2022
Type: SGSOV-Seismic Gas S/O Valve
Result: Insp Cancelled
Status: Issued
Date: 10/28/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/30/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/10/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 12/30/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/16/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/18/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/30/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/16/2022
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 01/26/2022
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 02/01/2022
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 02/08/2022
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 02/07/2022
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 03/29/2022
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 03/29/2022
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 03/29/2022
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 03/29/2022
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/29/2022
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 03/29/2022
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/29/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 03/29/2022
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 03/29/2022
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/29/2022
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 04/04/2022
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 04/11/2022
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 04/11/2022
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 04/15/2022
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 04/11/2022
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: Issued
Date: 04/11/2022
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/11/2022
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/15/2022
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/15/2022
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/11/2022
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 04/15/2022
Type: Final
Result: Partial Inspection
Status: Issued
Date: 04/11/2022
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 04/11/2022
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 04/15/2022
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 04/11/2022
Type: Wood Frame
Result: Approved
Status: Issued
Date: 04/21/2022
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 04/21/2022
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/21/2022
Type: Final
Result: Partial Inspection
Status: Issued
Date: 04/21/2022
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 09/30/2022
Type: TCO PV Verification
Result: Completed (special insp)
Status: Issued
Date: 09/30/2022
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Date: 09/30/2022
Type: TCO Heat,Vent,A/C Verification
Result: Insp Scheduled
Status: Issued
Date: 09/30/2022
Type: TCO Elevator Verification
Result: Completed (special insp)
Status: Issued
Date: 09/28/2022
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 09/30/2022
Type: TCO Electrical Verification
Result: Insp Scheduled
Status: Issued
Date: 10/06/2022
Type: Electrical Verification
Result: CofO on Hold
Status: Issued
Date: 10/06/2022
Type: Pressure Vessel Verification
Result: OK for CofO
Status: Issued
Date: 10/06/2022
Type: Heat,Vent,A/C Verification
Result: OK for CofO
Status: Issued
Date: 10/06/2022
Type: Plumbing Verification
Result: OK for CofO
Status: Issued
Date: 10/18/2022
Type: Green Building Final
Result: Approved
Status: CofO Issued
Date: 10/18/2022
Type: Final
Result: OK to Issue CofO
Status: CofO Issued
Date: 10/18/2022
Type: Reinforced Masonry Frame
Result: Approved
Status: CofO Issued
Date: 10/18/2022
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 10/18/2022
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 10/18/2022
Type: CofO Issuance
Result: CofO in Progress
Status: CofO Issued
Date: 10/18/2022
Type: Electrical Verification
Result: OK for CofO
Status: CofO Issued
Date: 10/18/2022
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 10/18/2022
Type: Reinforced Concrete Frame
Result: Approved
Status: CofO Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
FRYMER CONSTRUCTION

License number: 860661
Type: B
Phone: Speak with a Permit Expert
Location: SANTA MONICA, CA

Permit Applicant

Principal: DAVID MARK FRYMER

Type:

Address:

Phone:

Experience: years

Applicant: DARA HAAGENS