Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

NEW 6-STORY 21 UNITS APT. BLDG. OVER 2-LEVEL SUB. PARKING, (5-story re

Inspection Activity
Date: 03/27/2020
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 03/26/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/27/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 03/27/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 03/27/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 04/03/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/10/2019
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 07/10/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/11/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/11/2019
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 07/12/2019
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/12/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/19/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/15/2019
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 07/19/2019
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/16/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/18/2019
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 07/18/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/17/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/17/2019
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 07/16/2019
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 07/15/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/22/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/22/2019
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 12/24/2020
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 04/09/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/01/2019
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 04/08/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/26/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 08/28/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/13/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 04/17/2020
Type: Deputy Shotcrete
Result: Order to Comply Issued
Status: Issued
Date: 04/14/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/13/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 04/13/2020
Type: Reinforced Concrete Frame
Result: Corrections Issued
Status: Issued
Date: 08/28/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/26/2020
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 08/27/2020
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 04/20/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 04/22/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/22/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 04/21/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/23/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/22/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/24/2020
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 04/20/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/20/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 04/20/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/20/2020
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 08/26/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 12/28/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 12/28/2020
Type: Footing/Foundation/Slab
Result: Cancelled
Status: Issued
Date: 12/29/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 12/30/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 04/29/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/30/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/29/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 05/01/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/30/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 04/27/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 05/01/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/30/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/27/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/28/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 09/03/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/02/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/03/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/03/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/02/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/08/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 05/05/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/05/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/07/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/08/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/07/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/08/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/05/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 05/12/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/13/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/09/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 09/11/2020
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 09/11/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/08/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/09/2020
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 09/09/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/10/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/09/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/09/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 02/14/2020
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 02/14/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/14/2020
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 02/14/2020
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 02/14/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/16/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/18/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/17/2020
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 09/17/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/14/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/15/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 02/27/2020
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 02/27/2020
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 02/27/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 03/06/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/11/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 08/10/2021
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 03/13/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 03/12/2020
Type: Footing/Foundation/Slab
Result: Cancelled
Status: Issued
Date: 03/13/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/13/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/12/2020
Type: Deputy Reinf. Concrete
Result: No Access for Inspection
Status: Issued
Date: 03/19/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 03/18/2020
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 03/19/2020
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/16/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/17/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 03/17/2020
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 03/19/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/19/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 03/19/2020
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/17/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 06/16/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 01/14/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/15/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/16/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/19/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/20/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/05/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/05/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/13/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 01/26/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 01/25/2021
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 01/26/2021
Type: Verify Sprinkler Sign Off
Result: Off-Hour Fees Due
Status: Issued
Date: 01/26/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/26/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 01/26/2021
Type: Reinforced Concrete Frame
Result: Off-Hour Fees Due
Status: Issued
Date: 01/26/2021
Type: Verify Sprinkler Sign Off
Result: Off-Hour Fees Due
Status: Issued
Date: 01/26/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/26/2021
Type: Reinforced Concrete Frame
Result: Off-Hour Fees Due
Status: Issued
Date: 10/21/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/28/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/30/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/12/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/13/2020
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 11/13/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/12/2020
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 11/13/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/12/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/12/2020
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 11/12/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 11/12/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/19/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/20/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/23/2020
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 11/23/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 11/23/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 12/04/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 12/03/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 12/02/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 12/01/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/08/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 12/10/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 12/07/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 05/13/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/14/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 12/14/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 05/12/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/24/2021
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 05/25/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 03/24/2021
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 03/24/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/26/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/22/2021
Type: Structural Steel Frame
Result: Corrections Issued
Status: Issued
Date: 03/25/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/24/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/23/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/23/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/24/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/24/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 06/24/2021
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 09/15/2021
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 09/21/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/17/2022
Type: Piling/Pier/Caisson
Result: Not Ready for Inspection
Status: Issued
Date: 09/20/2022
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 10/03/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/03/2022
Type: Wood Frame
Result: Corrections Issued
Status: Issued
Date: 09/28/2023
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 10/06/2023
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 10/20/2023
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 06/03/2024
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 06/03/2024
Type: Interior/Exterior Lathing
Result: Not Ready for Inspection
Status: Issued
Date: 06/05/2024
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 11/09/2023
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 11/09/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 11/09/2023
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 11/30/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 11/30/2023
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 11/30/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 09/21/2023
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 09/21/2023
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 12/13/2023
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 07/01/2024
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/03/2024
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 01/03/2024
Type: Interior/Exterior Lathing
Result: Partial Inspection
Status: Issued
Date: 01/03/2024
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 01/10/2024
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 01/16/2024
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/25/2024
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 01/25/2024
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 01/25/2024
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/09/2024
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 02/16/2024
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 02/20/2024
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/29/2024
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 03/26/2024
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 03/29/2024
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 04/10/2024
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/13/2024
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
ARK CONSTRUCTION & DEVELOPMENT INC

License number: 438036
Type: B
Phone: Speak with a Permit Expert
Location: PACIFIC PALISADES, CA

Permit Applicant

Principal: FARIBORZ KAMDAR

Type:

Address: 1600 SAWTELLE BLVD., #230, LOS ANGELES, CA

Phone:

Experience: years

Applicant: PONYA PAYAN