Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

New 6-story multi-famiy affordable housing apartment building III-A ov

Inspection Activity
Date: 02/28/2022
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 02/28/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 02/28/2022
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 06/08/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 06/08/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 03/09/2022
Type: Deputy Grading
Result: Partial Approval
Status: Issued
Date: 03/09/2022
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 03/10/2022
Type: Deputy Grading
Result: Partial Approval
Status: Issued
Date: 06/08/2022
Type: Reinforced Masonry Frame
Result: Partial Inspection
Status: Issued
Date: 11/12/2021
Type: Grading Pre-Inspection
Result: Corrections Issued
Status: Issued
Date: 03/17/2022
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 03/16/2022
Type: Deputy Grading
Result: Partial Approval
Status: Issued
Date: 03/17/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/14/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 06/14/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/24/2022
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 02/01/2022
Type: Deputy Grading
Result: Partial Approval
Status: Issued
Date: 02/03/2022
Type: Footing/Foundation/Slab
Result: Conditional Approval
Status: Issued
Date: 02/01/2022
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/03/2022
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 03/22/2022
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 06/14/2022
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 02/14/2022
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 02/14/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 02/14/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 02/14/2022
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 02/24/2022
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 04/07/2022
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 04/22/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/29/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 04/29/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 04/25/2022
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/29/2022
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 04/28/2022
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 04/29/2022
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/04/2022
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 05/03/2022
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/02/2022
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 05/10/2022
Type: Deputy Other (see comments)
Result: Partial Approval
Status: Issued
Date: 05/11/2022
Type: Deputy Other (see comments)
Result: Partial Approval
Status: Issued
Date: 05/10/2022
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 07/14/2022
Type: Piling/Pier/Caisson
Result: Partial Inspection
Status: Issued
Date: 05/16/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/16/2022
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 05/16/2022
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 07/14/2022
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 05/23/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 05/23/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/23/2022
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 07/22/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 07/22/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 07/22/2022
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 12/28/2022
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 08/01/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 09/29/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 08/12/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 09/30/2022
Type: Reinforced Masonry Frame
Result: Off-Hour Fees Due
Status: Issued
Date: 09/30/2022
Type: Special/Order Compliance
Result: Insp Cancelled
Status: Issued
Date: 09/30/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Off-Hour Fees Due
Status: Issued
Date: 09/29/2022
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 09/26/2022
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 09/29/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 10/01/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 08/15/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 08/17/2022
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/15/2022
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 08/16/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 08/15/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 08/15/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 09/29/2022
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 09/30/2022
Type: Pre-Inspection
Result: Insp Cancelled
Status: Issued
Date: 10/05/2022
Type: Reinforced Concrete Frame
Result: Off-Hour Fees Due
Status: Issued
Date: 10/05/2022
Type: Pre-Inspection
Result: Off-Hour Fees Due
Status: Issued
Date: 10/05/2022
Type: Pre-Inspection
Result: Pending Review
Status: Issued
Date: 10/04/2022
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 10/05/2022
Type: Verify Sprinkler Sign Off
Result: Off-Hour Fees Due
Status: Issued
Date: 10/07/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 10/05/2022
Type: Piling/Pier/Caisson
Result: Pending Review
Status: Issued
Date: 10/05/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Pending Review
Status: Issued
Date: 10/05/2022
Type: Green Building Rough
Result: Off-Hour Fees Due
Status: Issued
Date: 10/05/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Off-Hour Fees Due
Status: Issued
Date: 10/06/2022
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 01/13/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 10/13/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/11/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 01/18/2023
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 01/19/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/27/2022
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 11/03/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 01/23/2023
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 01/23/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 11/26/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Off-Hour Fees Due
Status: Issued
Date: 11/25/2022
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 11/25/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 01/30/2023
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 11/29/2022
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 11/29/2022
Type: Masonry Wall/Backfill
Result: Insp Cancelled
Status: Issued
Date: 11/30/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 11/29/2022
Type: Light Gage Steel Frame
Result: Insp Cancelled
Status: Issued
Date: 11/29/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 11/29/2022
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 11/29/2022
Type: Reinforced Masonry Frame
Result: Insp Cancelled
Status: Issued
Date: 12/07/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 12/09/2022
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 12/15/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 12/12/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 12/15/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 02/14/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 02/16/2023
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 02/13/2023
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 03/28/2023
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 03/28/2023
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 03/28/2023
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 03/28/2023
Type: Structural Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/28/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 09/27/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 09/28/2023
Type: Drywall Nailing
Result: Pending Review
Status: Issued
Date: 04/28/2023
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 04/28/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 04/26/2023
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 04/28/2023
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 04/28/2023
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 04/28/2023
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 04/28/2023
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 05/02/2023
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 05/09/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/09/2023
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 05/09/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/09/2023
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 05/09/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/09/2023
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 05/09/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/09/2023
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 05/22/2023
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 06/01/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/01/2023
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 05/31/2023
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 06/06/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/02/2023
Type: Wood Frame
Result: Approved
Status: Issued
Date: 11/02/2023
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 11/02/2023
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 11/02/2023
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 11/02/2023
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 11/02/2023
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 11/02/2023
Type: Final
Result: Partial Inspection
Status: Issued
Date: 11/02/2023
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 11/02/2023
Type: Green Building Final
Result: Partial Inspection
Status: Issued
Date: 06/26/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/02/2023
Type: Reinforced Concrete Frame
Result: Approved
Status: Issued
Date: 08/02/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/31/2023
Type: Drywall Nailing
Result: Cancelled
Status: Issued
Date: 08/11/2023
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 08/22/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/10/2024
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 01/10/2024
Type: Final
Result: Partial Inspection
Status: Issued
Date: 01/10/2024
Type: Green Building Final
Result: Partial Inspection
Status: Issued
Date: 01/23/2024
Type: TCO PV Verification
Result: Completed (special insp)
Status: Issued
Date: 01/23/2024
Type: TCO Elevator Verification
Result: Completed (special insp)
Status: Issued
Date: 01/23/2024
Type: TCO Sprinkler Verification
Result: Completed (special insp)
Status: Issued
Date: 01/23/2024
Type: TCO Electrical Verification
Result: Completed (special insp)
Status: Issued
Date: 01/23/2024
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Date: 01/23/2024
Type: TCO Heat,Vent,A/C Verification
Result: Completed (special insp)
Status: Issued
Date: 04/10/2024
Type: Final
Result: Partial Inspection
Status: Issued
Date: 04/10/2024
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 04/10/2024
Type: Green Building Final
Result: Partial Inspection
Status: Issued
Date: 04/23/2024
Type: Final
Result: Partial Inspection
Status: Issued
Date: 04/23/2024
Type: Green Building Final
Result: Approved
Status: Issued
Date: 04/25/2024
Type: Elevator Verification
Result: OK for CofO
Status: Issued
Date: 04/23/2024
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: Issued
Date: 04/25/2024
Type: Heat,Vent,A/C Verification
Result: OK for CofO
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
P W C DEVELOPERS LLC

License number: 1017206
Type: B
Phone: Speak with a Permit Expert
Location: LOS ANGELES, CA

Permit Applicant

Principal: PROPHET L WALKER

Type:

Address: 920 S. GRAMERCY PL, LOS ANGELES/CA

Phone:

Experience: years

Applicant: ETHAN SMITH