Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

42 UNIT 3 STORY TYPE-VA APT WITH BUILD UP GRADE BASEMENT TYPE-IA GAR

Inspection Activity
Date: 12/24/2020
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 10/28/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 10/28/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 10/28/2019
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 12/21/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/22/2020
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 04/15/2020
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/24/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 08/24/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/23/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/23/2020
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 04/24/2020
Type: Wall Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/24/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/23/2020
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 04/23/2020
Type: Wall Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/23/2020
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 12/30/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 04/28/2020
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/30/2020
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 12/18/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 12/17/2019
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 12/17/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 12/17/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/18/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/19/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/18/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/18/2019
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 04/27/2020
Type: Wall Anchors
Result: Cancelled
Status: Issued
Date: 05/01/2020
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 05/01/2020
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 04/28/2020
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/01/2020
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 05/01/2020
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 12/27/2019
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 12/23/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 12/27/2019
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 12/26/2019
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 12/24/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 12/27/2019
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 12/24/2019
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 12/26/2019
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 01/03/2020
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 01/02/2020
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 01/03/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 12/31/2019
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 01/03/2020
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 01/03/2020
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 12/30/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 01/03/2020
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 05/07/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/07/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/07/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/08/2020
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 01/10/2020
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 01/06/2020
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 01/10/2020
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 01/10/2020
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 01/09/2020
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 01/10/2020
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 05/07/2020
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/07/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 01/17/2020
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 01/14/2020
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 01/15/2020
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 01/13/2020
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 01/13/2020
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 01/16/2020
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 01/23/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Approved
Status: Issued
Date: 01/23/2020
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/24/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 01/21/2020
Type: Masonry Wall/Backfill
Result: Not Ready for Inspection
Status: Issued
Date: 01/24/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/24/2020
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 09/09/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 01/28/2020
Type: Reinforced Masonry Frame
Result: Cancelled
Status: Issued
Date: 01/28/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 01/29/2020
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 01/30/2020
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 01/29/2020
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 01/27/2020
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 01/28/2020
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 01/28/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 01/31/2020
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 09/09/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/20/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/18/2020
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 05/18/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 02/03/2020
Type: Green Building Rough
Result: Cancelled
Status: Issued
Date: 02/05/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 02/03/2020
Type: Reinforced Concrete Frame
Result: Cancelled
Status: Issued
Date: 02/05/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 02/04/2020
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/05/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 02/03/2020
Type: Verify Sprinkler Sign Off
Result: Cancelled
Status: Issued
Date: 06/03/2020
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 06/03/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 03/05/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/06/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 03/05/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/08/2020
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 06/08/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 06/08/2020
Type: Wall Anchors
Result: Not Ready for Inspection
Status: Issued
Date: 01/13/2021
Type: Grading Pre-Inspection
Result: Cancelled
Status: Issued
Date: 01/12/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/24/2020
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 07/09/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/09/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/08/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/10/2020
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 07/09/2020
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 07/08/2020
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 10/02/2020
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 07/27/2020
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 07/27/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 07/31/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 01/20/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/20/2021
Type: Insulation
Result: Approved
Status: Issued
Date: 08/07/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 08/07/2020
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 08/03/2020
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 08/07/2020
Type: Wall Anchors
Result: Insp Scheduled
Status: Issued
Date: 08/06/2020
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 08/14/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 10/27/2020
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 02/05/2021
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 11/10/2020
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 11/13/2020
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 11/09/2020
Type: Green Building Rough
Result: Cancelled
Status: Issued
Date: 11/09/2020
Type: Verify Sprinkler Sign Off
Result: Cancelled
Status: Issued
Date: 11/09/2020
Type: Wood Frame
Result: Cancelled
Status: Issued
Date: 02/10/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 02/10/2021
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 11/18/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 02/10/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/08/2021
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 02/08/2021
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 02/11/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/08/2021
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 02/09/2021
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 11/25/2020
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 12/03/2020
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 12/03/2020
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 12/03/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 02/17/2021
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 12/08/2020
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 03/16/2021
Type: T-Bar Ceiling
Result: Approved
Status: Issued
Date: 03/30/2021
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 03/30/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 03/30/2021
Type: Green Building Final
Result: Approved
Status: Issued
Date: 04/01/2021
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 03/30/2021
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 03/30/2021
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/30/2021
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/30/2021
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 03/30/2021
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 03/30/2021
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/31/2021
Type: Special/Order Compliance
Result: Cancelled
Status: Issued
Date: 04/05/2021
Type: T-Bar Ceiling
Result: Approved
Status: Issued
Date: 04/13/2021
Type: Wall Anchors
Result: Not Ready for Inspection
Status: Issued
Date: 07/02/2021
Type: Verify Rec and Parks Fee Memo
Result: Cancelled
Status: Issued
Date: 07/01/2021
Type: Elevator Verification
Result: CofO on Hold
Status: Issued
Date: 06/30/2021
Type: Reinforced Concrete Frame
Result: Approved
Status: Issued
Date: 07/01/2021
Type: Heat,Vent,A/C Verification
Result: CofO on Hold
Status: Issued
Date: 06/30/2021
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 07/01/2021
Type: Special/Order Compliance
Result: Cancelled
Status: Issued
Date: 07/01/2021
Type: Electrical Verification
Result: OK for CofO
Status: Issued
Date: 06/30/2021
Type: Final
Result: OK for TCO
Status: Issued
Date: 07/01/2021
Type: Pressure Vessel Verification
Result: OK for CofO
Status: Issued
Date: 07/01/2021
Type: Fire Sprinkler Verification
Result: CofO on Hold
Status: Issued
Date: 06/30/2021
Type: Wood Frame
Result: Approved
Status: Issued
Date: 07/01/2021
Type: Plumbing Verification
Result: Not Applicable
Status: Issued
Date: 06/30/2021
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 07/01/2021
Type: AIM Verification
Result: Not Applicable
Status: Issued
Date: 06/30/2021
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: Issued
Date: 07/15/2021
Type: Grading Pre-Inspection
Result: Cancelled
Status: Issued
Date: 07/22/2021
Type: Heat,Vent,A/C Verification
Result: OK for CofO
Status: Issued
Date: 07/22/2021
Type: Elevator Verification
Result: Insp Scheduled
Status: Issued
Date: 07/22/2021
Type: Plumbing Verification
Result: OK for CofO
Status: Issued
Date: 07/22/2021
Type: Fire Sprinkler Verification
Result: OK for CofO
Status: Issued
Date: 07/20/2021
Type: Final
Result: OK for TCO
Status: Issued
Date: 07/28/2021
Type: Final
Result: Cancelled
Status: Issued
Date: 08/05/2021
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 08/05/2021
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 08/05/2021
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 08/05/2021
Type: CofO Issuance
Result: CofO in Progress
Status: CofO Issued
Date: 08/05/2021
Type: Final
Result: OK to Issue CofO
Status: CofO Issued
Date: 08/04/2021
Type: Final
Result: OK for TCO
Status: CofO Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
SCHAFFEL DEVELOPMENT COMPANY INC

License number: 411849
Type: B
Phone: Speak with a Permit Expert
Location: VAN NUYS, CA

Permit Applicant

Principal: GARY MARK SCHAFFEL

Type:

Address: SAME AS ARCH, CALABASAS

Phone:

Experience: years

Applicant: CURT