Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

5-STORY TYPE IIIA 29-UNIT APARTMENT OVER TYPE IA SUBTERRANEAN GARAGE L

Inspection Activity
Date: 08/26/2020
Type: Grading Pre-Inspection
Result: Approved
Status: Issued
Date: 08/27/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 08/11/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/11/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 08/12/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/12/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/13/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/27/2021
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 02/28/2022
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 08/19/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/20/2021
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 08/19/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 08/19/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/20/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/19/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 08/18/2021
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 02/17/2021
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 02/17/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 02/17/2021
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 08/19/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 08/20/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 02/23/2021
Type: METHANE-Barrier
Result: Approved
Status: Issued
Date: 02/23/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 02/23/2021
Type: METHANE-Subgrade
Result: Approved
Status: Issued
Date: 03/10/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/12/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/09/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 03/12/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 08/26/2021
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 08/26/2021
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 03/19/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 03/20/2021
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 03/20/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 03/19/2021
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 03/20/2021
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 03/20/2021
Type: METHANE-Rough
Result: Approved
Status: Issued
Date: 03/24/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 03/22/2021
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 03/23/2021
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 03/22/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/24/2021
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 12/02/2021
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 03/30/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 12/02/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 12/03/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/03/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/06/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 04/08/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 04/07/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 04/09/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 04/14/2021
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 06/09/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/08/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 06/10/2022
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 12/07/2021
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 12/06/2021
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 12/10/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 12/08/2021
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 07/01/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 07/08/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 03/08/2022
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/11/2022
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 12/13/2021
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 09/29/2021
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 12/16/2021
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 12/21/2021
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 12/21/2021
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 10/27/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 10/29/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/27/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 10/28/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 08/31/2022
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 11/09/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/10/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/09/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 11/10/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 11/12/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 11/10/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 11/12/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/10/2021
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 08/30/2022
Type: Wood Frame
Result: Cancelled
Status: Issued
Date: 01/25/2022
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 01/25/2022
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 06/13/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 02/10/2022
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 12/19/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/30/2022
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 04/06/2022
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 09/07/2022
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 09/08/2022
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 04/22/2022
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 12/21/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Cancelled
Status: Issued
Date: 05/04/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 05/04/2022
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/02/2022
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 07/07/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 05/11/2022
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 05/12/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 05/10/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Corrections Issued
Status: Issued
Date: 09/14/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 09/12/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/20/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 05/18/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 05/17/2022
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 05/31/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/27/2022
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 07/27/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 08/02/2022
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 08/01/2022
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 08/11/2022
Type: Insulation
Result: Insp Cancelled
Status: Issued
Date: 08/08/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 09/30/2022
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 09/29/2022
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 01/05/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 08/23/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Cancelled
Status: Issued
Date: 01/13/2023
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 01/10/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/11/2022
Type: Deputy Wood Construction
Result: Approved
Status: Issued
Date: 10/12/2022
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 10/14/2022
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 10/17/2022
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 10/18/2022
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 10/18/2022
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 10/18/2022
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 01/17/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/24/2022
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 11/01/2022
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 01/26/2023
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 11/10/2022
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 11/09/2022
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 01/25/2023
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 01/27/2023
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 11/14/2022
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 11/23/2022
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 02/03/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 12/01/2022
Type: Insulation
Result: Cancelled
Status: Issued
Date: 12/05/2022
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 02/14/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/18/2023
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 05/23/2023
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 06/01/2023
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 06/12/2024
Type: Final
Result: Cancelled
Status: Issued
Date: 06/12/2024
Type: Green Building Final
Result: Cancelled
Status: Issued
Date: 11/07/2023
Type: Grading Pre-Inspection
Result: No Access for Inspection
Status: Issued
Date: 06/13/2024
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 06/13/2024
Type: Green Building Final
Result: Approved
Status: Issued
Date: 06/21/2024
Type: Final
Result: Cancelled
Status: Issued
Date: 06/24/2024
Type: Plumbing Verification
Result: OK for CofO
Status: Issued
Date: 06/25/2024
Type: Electrical Verification
Result: CofO on Hold
Status: Issued
Date: 01/12/2024
Type: Smoke Detectors
Result: Insp Scheduled
Status: Issued
Date: 01/12/2024
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 01/12/2024
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 01/12/2024
Type: SGSOV-Seismic Gas S/O Valve
Result: Insp Scheduled
Status: Issued
Date: 01/12/2024
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 01/12/2024
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 01/12/2024
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 01/26/2024
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 01/26/2024
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 03/08/2024
Type: Grading Verification
Result: OK for CofO
Status: Issued
Date: 03/08/2024
Type: Plumbing Verification
Result: CofO on Hold
Status: Issued
Date: 03/08/2024
Type: Heat,Vent,A/C Verification
Result: Insp Scheduled
Status: Issued
Date: 03/07/2024
Type: Final
Result: Partial Inspection
Status: Issued
Date: 03/07/2024
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 03/08/2024
Type: Electrical Verification
Result: CofO on Hold
Status: Issued
Date: 03/08/2024
Type: Pressure Vessel Verification
Result: CofO on Hold
Status: Issued
Date: 03/08/2024
Type: Fire Sprinkler Verification
Result: CofO on Hold
Status: Issued
Date: 03/11/2024
Type: Elevator Verification
Result: CofO on Hold
Status: Issued
Date: 03/15/2024
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 03/20/2024
Type: Final
Result: Cancelled
Status: Issued
Date: 03/20/2024
Type: Green Building Final
Result: Cancelled
Status: Issued
Date: 04/23/2024
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 04/23/2024
Type: Final
Result: Not Ready for Inspection
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
HARPCO CONSTRUCTION AND DEVELOPMENT SERVICES INC

License number: 1033453
Type: B
Phone: Speak with a Permit Expert
Location: CORONA DEL MAR, CA

Permit Applicant

Principal: SEAN MICHAEL HARPER

Type:

Address:

Phone:

Experience: years

Applicant: DARYOUSH SAFAI