Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

NEW SINGLE FAMILY DWELLING WITH ATTACHED GARAGE AND BASEMENT.

Inspection Activity
Date: 12/24/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/23/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/23/2019
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 03/23/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/08/2019
Type: Piling/Pier/Caisson
Result: Cancelled
Status: Issued
Date: 11/06/2019
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 11/06/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/08/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Cancelled
Status: Issued
Date: 11/14/2019
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 11/14/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/16/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 11/21/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/30/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 12/06/2019
Type: Footing/Foundation/Slab
Result: Cancelled
Status: Issued
Date: 12/06/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Cancelled
Status: Issued
Date: 12/09/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/07/2019
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 10/07/2019
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/10/2019
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 05/15/2019
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 01/15/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 01/15/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 01/16/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 01/15/2020
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 05/19/2020
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 05/19/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Approved
Status: Issued
Date: 02/05/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 01/07/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/26/2020
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 02/20/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/26/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 06/10/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/10/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 09/23/2020
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 06/18/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/18/2020
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 06/15/2020
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 09/25/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 06/25/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/26/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/07/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 07/10/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/06/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 09/23/2020
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 09/25/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 07/16/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 07/14/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 07/16/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 07/13/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/28/2021
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 07/20/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/05/2020
Type: PLUMBING-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 08/03/2020
Type: PLUMBING-Rough
Result: Insp Cancelled
Status: Issued
Date: 08/05/2020
Type: Underground Mechanical
Result: Not Ready for Inspection
Status: Issued
Date: 08/03/2020
Type: Underground Mechanical
Result: Insp Cancelled
Status: Issued
Date: 08/04/2020
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 08/13/2020
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 08/13/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/28/2021
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 04/30/2021
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 05/06/2021
Type: Deputy Reinf. Concrete
Result: No Access for Inspection
Status: Issued
Date: 10/29/2020
Type: Deputy Drilled-In Anchors
Result: No Access for Inspection
Status: Issued
Date: 02/01/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 02/01/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 02/04/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/04/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 11/09/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Approved
Status: Issued
Date: 02/09/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/10/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/09/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 11/23/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/18/2021
Type: Interior/Exterior Lathing
Result: Not Ready for Inspection
Status: Issued
Date: 08/16/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 12/03/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Approved
Status: Issued
Date: 02/18/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 02/18/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/09/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 12/07/2020
Type: Grading Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 12/17/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 12/17/2020
Type: Structural Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 12/17/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 12/17/2020
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 12/17/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/14/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 08/16/2021
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 02/24/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Approved
Status: Issued
Date: 03/04/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 03/10/2021
Type: Underground Mechanical
Result: Partial Approval
Status: Issued
Date: 03/11/2021
Type: ELECTRICAL-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/17/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Conditional Approval
Status: Issued
Date: 03/22/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 03/26/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 03/22/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/26/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/07/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/09/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/02/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 06/17/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 06/17/2021
Type: HVAC-Rough
Result: Partial Approval
Status: Issued
Date: 06/24/2021
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 06/24/2021
Type: HVAC-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 06/24/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/24/2021
Type: PLUMBING-Rough
Result: Partial Inspection
Status: Issued
Date: 12/10/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Approved
Status: Issued
Date: 06/28/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 07/08/2021
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 07/15/2021
Type: ELECTRICAL-Rough
Result: Cancelled
Status: Issued
Date: 07/15/2021
Type: PLUMBING-Rough
Result: Cancelled
Status: Issued
Date: 07/15/2021
Type: HVAC-Rough
Result: Cancelled
Status: Issued
Date: 07/15/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 07/20/2021
Type: PLUMBING-Rough
Result: Partial Approval
Status: Issued
Date: 07/23/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/29/2021
Type: Underground Mechanical
Result: Partial Approval
Status: Issued
Date: 09/22/2021
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 08/02/2021
Type: Shower Pan
Result: Partial Approval
Status: Issued
Date: 08/04/2021
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 12/13/2021
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 03/09/2022
Type: ELECTRICAL-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 12/21/2021
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 12/21/2021
Type: HVAC-Rough
Result: Partial Approval
Status: Issued
Date: 12/29/2021
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 12/29/2021
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 12/29/2021
Type: BUILDING-Rough-Frame
Result: Partial Approval
Status: Issued
Date: 11/08/2021
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 11/09/2021
Type: ELECTRICAL-Rough
Result: Partial Approval
Status: Issued
Date: 12/29/2021
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 12/29/2021
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 12/29/2021
Type: BUILDING-Rough-Frame
Result: Partial Approval
Status: Issued
Date: 12/29/2021
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 12/29/2021
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 12/29/2021
Type: BUILDING-Rough-Frame
Result: Partial Approval
Status: Issued
Date: 01/18/2022
Type: Interior/Exterior Lathing
Result: Approved
Status: Issued
Date: 01/26/2022
Type: Insulation
Result: Approved
Status: Issued
Date: 01/26/2022
Type: Shower Pan
Result: Approved
Status: Issued
Date: 03/23/2022
Type: ELECTRICAL-Rough
Result: Approved
Status: Issued
Date: 02/10/2022
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 02/10/2022
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 02/07/2022
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 04/04/2022
Type: ELECTRICAL-Rough
Result: Approved
Status: Issued
Date: 06/29/2022
Type: Interior/Exterior Lathing
Result: Approved
Status: Issued
Date: 06/29/2022
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 04/14/2023
Type: Service/Power Release
Result: Approved
Status: Issued
Date: 06/03/2022
Type: Insulation
Result: Approved
Status: Issued
Date: 12/12/2022
Type: Interior/Exterior Lathing
Result: Approved
Status: Issued
Date: 05/30/2023
Type: Gas Test
Result: Approved
Status: Issued
Date: 07/25/2023
Type: Enclosure/Fence
Result: Not Ready for Inspection
Status: Issued
Date: 08/02/2023
Type: Reinforced Concrete Frame
Result: Corrections Issued
Status: Issued
Date: 08/22/2023
Type: Enclosure/Fence
Result: Approved
Status: Issued
Date: 12/14/2023
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 12/14/2023
Type: BUILDING-Rough-Frame
Result: Insp Cancelled
Status: Issued
Date: 12/14/2023
Type: Smoke Detectors
Result: Insp Cancelled
Status: Issued
Date: 12/14/2023
Type: Structural Steel Frame
Result: Insp Cancelled
Status: Issued
Date: 12/14/2023
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 12/14/2023
Type: SGSOV-Seismic Gas S/O Valve
Result: Insp Cancelled
Status: Issued
Date: 12/14/2023
Type: Final
Result: Insp Cancelled
Status: Issued
Date: 12/14/2023
Type: Green Building Final
Result: Insp Cancelled
Status: Issued
Date: 02/15/2024
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 02/15/2024
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 02/15/2024
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 02/15/2024
Type: BUILDING-Rough-Frame
Result: Not Ready for Inspection
Status: Issued
Date: 02/15/2024
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 02/15/2024
Type: Structural Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 02/15/2024
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 02/15/2024
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 02/22/2024
Type: Reinforced Concrete Frame
Result: Approved
Status: Issued
Date: 02/22/2024
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 02/22/2024
Type: Structural Steel Frame
Result: Approved
Status: Issued
Date: 02/22/2024
Type: Final
Result: Corrections Issued
Status: Issued
Date: 02/22/2024
Type: BUILDING-Rough-Frame
Result: Approved
Status: Issued
Date: 02/22/2024
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 02/22/2024
Type: Green Building Final
Result: Approved
Status: Issued
Date: 02/22/2024
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: Issued
Date: 02/28/2024
Type: Final
Result: Partial Inspection
Status: Issued
Date: 04/04/2024
Type: CofO Issuance
Result: CofO in Progress
Status: CofO Issued
Date: 04/04/2024
Type: Final
Result: OK to Issue CofO
Status: CofO Issued
Date: 04/05/2024
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 04/05/2024
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 04/05/2024
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
GIBSON GORDON S INC

License number: 524012
Type: B
Phone: Speak with a Permit Expert
Location: SANTA MONICA, CA

Permit Applicant

Principal: GORDON SANFORD GIBSON

Type:

Address:

Phone:

Experience: years

Applicant: ALEX WHITEHEAD