Bldg-Alter/Repair Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

ADAPTIVE REUSE AND SEISMIC UPGRADE OF (E) 12 STORY BUILDING. RECONFIGU

Inspection Activity
Date: 04/02/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/02/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/02/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/06/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/06/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/16/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/16/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/23/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/23/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/23/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/23/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 09/04/2020
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 04/23/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/11/2020
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 09/10/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 09/10/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/09/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/23/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 01/07/2021
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 05/29/2020
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/26/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/16/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 09/16/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/17/2020
Type: Drywall Nailing
Result: Insp Cancelled
Status: Issued
Date: 06/05/2020
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 06/05/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/05/2020
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 03/11/2020
Type: Deputy Methane Barrier
Result: Insp Cancelled
Status: Issued
Date: 03/09/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/11/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/10/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/21/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 09/21/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/12/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/12/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/21/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/09/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/09/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/09/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 07/10/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/21/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/22/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 07/22/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/24/2020
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 07/22/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/24/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/30/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/30/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Cancelled
Status: Issued
Date: 07/31/2020
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 07/27/2020
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 07/31/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/20/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 01/20/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 08/05/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/05/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/06/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/30/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Conditional Approval
Status: Issued
Date: 10/14/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/29/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 01/25/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/25/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/20/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/20/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 10/21/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/20/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/21/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/01/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/06/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/06/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/06/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/08/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/12/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 02/08/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/16/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/16/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/24/2020
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 08/16/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 08/16/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 08/20/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 12/02/2020
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 12/01/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/01/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/08/2020
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 12/10/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 12/11/2020
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/12/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 05/12/2021
Type: Light Gage Steel Frame
Result: Corrections Issued
Status: Issued
Date: 12/16/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/16/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/20/2021
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 02/25/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 02/22/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 02/26/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 02/25/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/18/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/02/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/02/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 03/02/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/18/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/18/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/09/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/15/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/15/2021
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 03/15/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/15/2021
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/15/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/26/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/26/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/25/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/25/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/01/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/09/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/06/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Conditional Approval
Status: Issued
Date: 04/09/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/09/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/06/2021
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/06/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/09/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/09/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/02/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/02/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/01/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/16/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/31/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/11/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/11/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/07/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/11/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/30/2021
Type: Light Gage Steel Frame
Result: No Access for Inspection
Status: Issued
Date: 09/02/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 09/07/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/25/2021
Type: Light Gage Steel Frame
Result: No Access for Inspection
Status: Issued
Date: 06/21/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 09/07/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/07/2021
Type: Light Gage Steel Frame
Result: No Access for Inspection
Status: Issued
Date: 06/28/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/29/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/28/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/29/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/08/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/09/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/16/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/14/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/14/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/10/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/23/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 09/20/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/30/2021
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 07/28/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/27/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/29/2021
Type: Insulation
Result: Cancelled
Status: Issued
Date: 07/27/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 08/05/2021
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 08/03/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 08/05/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 08/05/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 08/03/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/01/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 09/27/2021
Type: Insulation
Result: No Access for Inspection
Status: Issued
Date: 09/30/2021
Type: Insulation
Result: Insp Cancelled
Status: Issued
Date: 03/08/2022
Type: Light Gage Steel Frame
Result: Cancelled
Status: Issued
Date: 03/10/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/08/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/04/2021
Type: Insulation
Result: Insp Cancelled
Status: Issued
Date: 10/04/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 10/07/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/08/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/22/2021
Type: Light Gage Steel Frame
Result: Insp Cancelled
Status: Issued
Date: 03/08/2022
Type: Drywall Nailing
Result: Cancelled
Status: Issued
Date: 10/19/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 10/21/2021
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 10/20/2021
Type: Light Gage Steel Frame
Result: No Access for Inspection
Status: Issued
Date: 11/08/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/10/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 11/08/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/15/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/18/2021
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 11/15/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/17/2022
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 03/14/2022
Type: Light Gage Steel Frame
Result: Cancelled
Status: Issued
Date: 03/16/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/17/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/20/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/07/2022
Type: Light Gage Steel Frame
Result: Corrections Issued
Status: Issued
Date: 02/24/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/04/2022
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 05/16/2022
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 05/16/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/11/2022
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 07/13/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 09/19/2022
Type: Special/Order Compliance
Result: Cancelled
Status: Issued
Date: 09/28/2022
Type: Special/Order Compliance
Result: Cancelled
Status: Issued
Date: 10/20/2022
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 01/20/2023
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 01/19/2023
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 01/17/2023
Type: Special/Order Compliance
Result: Cancelled
Status: Issued
Date: 11/04/2022
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 11/09/2022
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 11/15/2022
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 11/14/2022
Type: Special/Order Compliance
Result: Cancelled
Status: Issued
Date: 12/02/2022
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 12/01/2022
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 02/07/2023
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 02/14/2023
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 05/19/2023
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 05/19/2023
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 07/19/2023
Type: Deputy Fireproofing
Result: Insp Scheduled
Status: Issued
Date: 07/20/2023
Type: Deputy Fireproofing
Result: Insp Scheduled
Status: Issued
Date: 07/24/2023
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 07/24/2023
Type: Drywall Nailing
Result: Insp Cancelled
Status: Issued
Date: 07/24/2023
Type: METHANE-Final
Result: Insp Cancelled
Status: Issued
Date: 07/24/2023
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 07/24/2023
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 07/24/2023
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 07/24/2023
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 07/24/2023
Type: METHANE-Rough
Result: Insp Cancelled
Status: Issued
Date: 08/07/2023
Type: Drywall Nailing
Result: Insp Cancelled
Status: Issued
Date: 08/09/2023
Type: Pressure Vessel Verification
Result: OK for CofO
Status: Issued
Date: 08/07/2023
Type: Final
Result: Partial Inspection
Status: Issued
Date: 08/07/2023
Type: METHANE-Rough
Result: Insp Cancelled
Status: Issued
Date: 08/07/2023
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 08/07/2023
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 08/07/2023
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: Issued
Date: 08/07/2023
Type: METHANE-Final
Result: Insp Cancelled
Status: Issued
Date: 08/07/2023
Type: Smoke Detectors
Result: Partial Inspection
Status: Issued
Date: 01/12/2024
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 01/30/2024
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 02/02/2024
Type: Heat,Vent,A/C Verification
Result: Insp Scheduled
Status: Issued
Date: 02/02/2024
Type: Elevator Verification
Result: OK for CofO
Status: Issued
Date: 02/02/2024
Type: Electrical Verification
Result: Insp Scheduled
Status: Issued
Date: 02/05/2024
Type: Heat,Vent,A/C Verification
Result: OK for CofO
Status: Issued
Date: 03/04/2024
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 03/04/2024
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/04/2024
Type: Green Building Final
Result: Approved
Status: Issued
Date: 03/04/2024
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 03/04/2024
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 03/22/2024
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/29/2024
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/29/2024
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 04/29/2024
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 05/08/2024
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: CofO in Progress
Date: 05/08/2024
Type: CofO Issuance
Result: CofO in Progress
Status: CofO in Progress
Date: 05/08/2024
Type: Drywall Nailing
Result: Partial Approval
Status: CofO in Progress
Date: 05/08/2024
Type: Final
Result: OK to Issue CofO
Status: CofO in Progress
Date: 05/14/2024
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 05/13/2024
Type: Inspection
Result: OK for CofO
Status: CofO Issued
Date: 05/13/2024
Type: Inspection
Result: OK for CofO
Status: CofO Issued
Date: 05/13/2024
Type: CofO Issuance
Result: CofO in Progress
Status: CofO Issued
Date: 05/14/2024
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 05/13/2024
Type: CofO Issuance
Result: CofO in Progress
Status: CofO Issued
Date: 05/14/2024
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
CITY CONSTRUCTORS INC

License number: 834591
Type: B
Phone: Speak with a Permit Expert
Location: LOS ANGELES, CA

Permit Applicant

Principal: GREGORY WALLACE REAUME

Type:

Address: 724 S. SPRING ST., 501, LOS ANGELES, CA

Phone:

Experience: years

Applicant: SARA GROESBECK