Bldg-Addition Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

ELEVATED PEDESTRIAN WALKWAY CONNECTOR BETWEEN TERMINAL 1.5 & 2 AT LAX

Inspection Activity
Date: 12/22/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Conditional Approval
Status: Issued
Date: 12/22/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/22/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Conditional Approval
Status: Issued
Date: 04/17/2020
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 04/21/2021
Type: Deputy Fireproofing
Result: Insp Scheduled
Status: Issued
Date: 04/23/2021
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 04/23/2021
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 04/22/2021
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 08/13/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 08/10/2021
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 08/10/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 08/09/2021
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 04/29/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/22/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/29/2021
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/28/2021
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 04/29/2021
Type: Deputy Fireproofing
Result: Insp Scheduled
Status: Issued
Date: 05/06/2021
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 05/03/2021
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 05/07/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/04/2021
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 05/03/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/07/2021
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 12/01/2020
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 12/03/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Pending Review
Status: Issued
Date: 12/04/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Off-Hour Fees Due
Status: Issued
Date: 12/04/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Pending Review
Status: Issued
Date: 08/17/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/12/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Pending Review
Status: Issued
Date: 12/11/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Off-Hour Fees Due
Status: Issued
Date: 12/11/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Pending Review
Status: Issued
Date: 08/20/2021
Type: T-Bar Ceiling
Result: Insp Scheduled
Status: Issued
Date: 05/11/2021
Type: Deputy Fireproofing
Result: Approved
Status: Issued
Date: 05/11/2021
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 12/19/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Pending Review
Status: Issued
Date: 12/18/2020
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 12/18/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 12/19/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Off-Hour Fees Due
Status: Issued
Date: 05/13/2021
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 03/02/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/01/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/04/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/05/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/03/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/18/2021
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 05/19/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/11/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/10/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/12/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/09/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/17/2021
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 08/24/2021
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/16/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/17/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/19/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/18/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/27/2021
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 05/26/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/24/2021
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 03/26/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/26/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/23/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/25/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/25/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 03/24/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/22/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/24/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/23/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/25/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 08/26/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/30/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/30/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/02/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/04/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 06/03/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/03/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/04/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/02/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/08/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/09/2021
Type: Deputy Fireproofing
Result: Insp Scheduled
Status: Issued
Date: 04/09/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/07/2021
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 04/09/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/08/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/07/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/07/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/08/2021
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 04/07/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/09/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/08/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/02/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/04/2021
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 04/13/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/13/2021
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 04/15/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/12/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/16/2021
Type: Deputy Fireproofing
Result: Insp Scheduled
Status: Issued
Date: 04/14/2021
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 04/16/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/16/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/13/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/14/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/14/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/12/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/12/2021
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 04/15/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/13/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/15/2021
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 04/12/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/02/2021
Type: Light Gage Steel Frame
Result: Approved
Status: Issued
Date: 08/31/2021
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 06/08/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/07/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/10/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/10/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/11/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/07/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/08/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/09/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/07/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/11/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/08/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/08/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/11/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 06/11/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/09/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/10/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/09/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/17/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/17/2021
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 06/15/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/16/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/15/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/16/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/17/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/23/2021
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 06/21/2021
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 06/22/2021
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 06/24/2021
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 06/21/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/28/2021
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 06/30/2021
Type: Deputy Fireproofing
Result: Insp Scheduled
Status: Issued
Date: 06/29/2021
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 07/01/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 06/29/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 09/16/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/08/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/08/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/08/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/08/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 09/18/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 09/15/2021
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 09/14/2021
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 09/16/2021
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 07/15/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/13/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/12/2021
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 07/16/2021
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 07/12/2021
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 07/13/2021
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 07/22/2021
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 07/19/2021
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 07/23/2021
Type: Deputy Fireproofing
Result: Insp Scheduled
Status: Issued
Date: 07/30/2021
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 09/22/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 08/04/2021
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 08/05/2021
Type: Light Gage Steel Frame
Result: Order to Comply Issued
Status: Issued
Date: 09/28/2021
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 10/05/2021
Type: T-Bar Ceiling
Result: Approved
Status: Issued
Date: 10/08/2021
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 10/06/2021
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 08/31/2022
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 03/30/2022
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 09/15/2022
Type: CofO Issuance
Result: CofO in Progress
Status: CofO Issued
Date: 09/15/2022
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 09/15/2022
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 09/15/2022
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 08/12/2022
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 08/12/2022
Type: SGSOV-Seismic Gas S/O Valve
Result: Insp Scheduled
Status: Issued
Date: 08/12/2022
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 08/12/2022
Type: Structural Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 08/12/2022
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 08/12/2022
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 08/12/2022
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 08/12/2022
Type: Smoke Detectors
Result: Insp Scheduled
Status: Issued
Date: 08/16/2022
Type: Final
Result: Not Ready for Inspection
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
HENSEL PHELPS CONSTRUCTION CO

License number: 1020262
Type: A
Phone: Speak with a Permit Expert
Location: GREELEY, CO

Permit Applicant

Principal: BRADLEY ARTHUR JEANNERET

Type:

Address: 6171 W CENTURY BLVD, 250, LA, CA

Phone:

Experience: years

Applicant: DAVID NEDROW