Bldg-Alter/Repair Permit

PCIS Permit#: 18016-10000-22952

Address: 5757 WILSHIRE, Los Angeles, 90036

Status: Permit Finaled

Status Date: 03/22/2021

Tract: P M 5608

Property Identifier: Block: , Lot: C, Zone: (T)(Q)C4-2

Assessor Information: Book: 5508, Page: 15, Parcel: 7

Census Tract: 2151.01

Work Description

Supplemental to 17010-10000-04785, Foundation only permit for a New 21

Inspection Activity
Date: 05/29/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/28/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/23/2019
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 10/25/2019
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 10/22/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/21/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 10/31/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 10/29/2019
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 07/03/2019
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 07/11/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/12/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 07/08/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/09/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/10/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/12/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/21/2018
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 11/13/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 08/19/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 11/21/2019
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 11/20/2019
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 01/11/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/16/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/15/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/16/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/15/2019
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 01/18/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/17/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/14/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/14/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/17/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/18/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 01/15/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/09/2019
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 01/23/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/24/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/24/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 01/23/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/24/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 01/25/2019
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 01/25/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/25/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 01/23/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/28/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/28/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/31/2019
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 02/01/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/30/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/29/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/31/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/28/2019
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/29/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/29/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/05/2019
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 02/04/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/08/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/07/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/08/2019
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 02/12/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/15/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/13/2019
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/11/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/12/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 02/15/2019
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 02/20/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/22/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/19/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/21/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/25/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 09/25/2019
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 02/27/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/01/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/01/2019
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 02/26/2019
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 02/25/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/26/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/28/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/08/2019
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 03/08/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/07/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/05/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/04/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/07/2019
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 03/06/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/11/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/12/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/13/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/02/2019
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 10/03/2019
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 03/22/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/21/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/22/2019
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 03/20/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/03/2019
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/28/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/27/2019
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/27/2019
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 03/28/2019
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 03/29/2019
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 03/29/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/26/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/29/2019
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 03/28/2019
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/27/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/06/2019
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 04/01/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/05/2019
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 04/04/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/03/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/05/2019
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 04/02/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/04/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/03/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/04/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/04/2019
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/02/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/02/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/02/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/06/2019
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 04/05/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/03/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/03/2019
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/05/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 10/08/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/11/2019
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 04/12/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 04/08/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/12/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 04/10/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 04/09/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 04/09/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/08/2019
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 04/10/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/09/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/09/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/09/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/12/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/10/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/12/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/11/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/11/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/11/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/11/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/11/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/08/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/11/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/11/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/10/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/09/2019
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/10/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/12/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/10/2019
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 04/12/2019
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 04/12/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/12/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/10/2019
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/10/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/15/2019
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 04/16/2019
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 04/16/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/15/2019
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 04/15/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/18/2019
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/16/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/16/2019
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/17/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/18/2019
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 04/16/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/15/2019
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/17/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/19/2019
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 04/19/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/17/2019
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/18/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/17/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/16/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/18/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/15/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/15/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/18/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/15/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/15/2019
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/15/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/17/2019
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 04/15/2019
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/15/2019
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/24/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/26/2019
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 04/22/2019
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 04/27/2019
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 04/26/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 04/29/2019
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 04/30/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/01/2019
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 05/09/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/09/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/09/2019
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 05/10/2019
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 05/10/2019
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/27/2019
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 05/17/2019
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 05/15/2019
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 05/14/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/13/2019
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/15/2019
Type: Reinforced Concrete Frame
Result: Pending Review
Status: Issued
Date: 05/23/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/22/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/24/2019
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/20/2019
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/21/2019
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
SNYDER J H CONSTRUCTION INC

License number: 964593
Type: B
Phone: Speak with a Permit Expert
Location: LOS ANGELES, CA

Permit Applicant

Principal: JEROME HARRY SNYDER
Type:
Address: 5757 WILSHIRE BLVD., 30, LOS ANGELES, CA
Phone:
Experience: years
Applicant: JASON SHENG