Bldg-Alter/Repair Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

SUPPLEMETNAL TO 18016-10010-19512 FOR DEFERRED DESIGN ITEMS ; FOR LIG

Inspection Activity
Date: 11/23/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/23/2020
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 12/22/2020
Type: Light Gage Steel Frame
Result: Conditional Approval
Status: Issued
Date: 12/23/2020
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 12/23/2020
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 04/21/2021
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 04/21/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 04/22/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/20/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/22/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/28/2020
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 04/21/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/19/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/19/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/19/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/20/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/21/2021
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 04/22/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/21/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/23/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/22/2021
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 04/20/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/19/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/22/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 04/19/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/23/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/19/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/22/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/21/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/21/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 01/06/2021
Type: Light Gage Steel Frame
Result: Conditional Approval
Status: Issued
Date: 01/06/2021
Type: Drywall Nailing
Result: Conditional Approval
Status: Issued
Date: 01/08/2021
Type: Light Gage Steel Frame
Result: Conditional Approval
Status: Issued
Date: 01/04/2021
Type: Light Gage Steel Frame
Result: Corrections Issued
Status: Issued
Date: 04/20/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 08/13/2021
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 08/12/2021
Type: Light Gage Steel Frame
Result: Conditional Approval
Status: Issued
Date: 08/10/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 08/10/2021
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 08/13/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 01/15/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 01/14/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/15/2021
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 01/14/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/13/2021
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 01/13/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 08/10/2021
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 08/13/2021
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 04/28/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/21/2021
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 01/21/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/19/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/20/2021
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 01/20/2021
Type: Light Gage Steel Frame
Result: Corrections Issued
Status: Issued
Date: 04/28/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 08/10/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/23/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/28/2021
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 01/28/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/29/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/29/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/26/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/04/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/06/2020
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 11/06/2020
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 02/04/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/04/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/07/2021
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 11/09/2020
Type: Light Gage Steel Frame
Result: Conditional Approval
Status: Issued
Date: 11/12/2020
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 11/12/2020
Type: Light Gage Steel Frame
Result: Conditional Approval
Status: Issued
Date: 11/09/2020
Type: Pre-Inspection
Result: Conditional Approval
Status: Issued
Date: 05/07/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 02/09/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/11/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/16/2020
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 11/16/2020
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 11/19/2020
Type: Light Gage Steel Frame
Result: Conditional Approval
Status: Issued
Date: 02/11/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/24/2020
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 02/09/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 08/20/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 08/17/2021
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 08/20/2021
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 08/17/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/01/2020
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 12/01/2020
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 12/02/2020
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 02/17/2021
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 02/17/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/17/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/19/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 02/19/2021
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 12/11/2020
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 12/11/2020
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 12/11/2020
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 12/09/2020
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 08/20/2021
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 05/12/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/12/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/10/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/15/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/16/2020
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/14/2021
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 05/14/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 05/10/2021
Type: Insulation
Result: Conditional Approval
Status: Issued
Date: 05/10/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/12/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/24/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/24/2021
Type: Insulation
Result: Approved
Status: Issued
Date: 02/24/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/30/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/21/2021
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 03/04/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 03/05/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 03/05/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/04/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/02/2021
Type: Light Gage Steel Frame
Result: Conditional Approval
Status: Issued
Date: 03/02/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/18/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/18/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/18/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/21/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 03/11/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/08/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/12/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/11/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/08/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/10/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/10/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/10/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/10/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/12/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 03/09/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/09/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/30/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 08/24/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 08/27/2021
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 08/24/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 08/27/2021
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 03/18/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/17/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/18/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/17/2021
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 03/16/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/18/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/17/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/16/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 03/19/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 03/19/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/19/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 03/17/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/18/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/19/2021
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 05/27/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 05/27/2021
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 03/23/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 03/24/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/24/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/22/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/23/2021
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 03/25/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/26/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/23/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/25/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 03/22/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/26/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/25/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 08/27/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 03/31/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/31/2021
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 03/31/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/31/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/03/2021
Type: Light Gage Steel Frame
Result: Pending Review
Status: Issued
Date: 04/01/2021
Type: Deputy Other (see comments)
Result: Insp Scheduled
Status: Issued
Date: 04/01/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 03/31/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/01/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/08/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/05/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/05/2021
Type: Deputy Other (see comments)
Result: Insp Scheduled
Status: Issued
Date: 04/06/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/06/2021
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 04/07/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/08/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/09/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/09/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 04/05/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/08/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/06/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/09/2021
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 04/09/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/07/2021
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 04/07/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/05/2021
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 04/05/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 04/06/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/08/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/15/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/12/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/15/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/15/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/13/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/16/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/15/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/12/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/12/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/16/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/13/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/12/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/16/2021
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 06/15/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/17/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/15/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 06/14/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/18/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/16/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/16/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/15/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/18/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 06/16/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/15/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/15/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/17/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/14/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/22/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/25/2021
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 06/22/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/25/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 06/23/2021
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 09/10/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 09/10/2021
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 12/10/2021
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 06/29/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/29/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 12/10/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 09/14/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 09/15/2021
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 09/16/2021
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 09/17/2021
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 07/08/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/08/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/17/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 09/15/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/15/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/14/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/15/2021
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 07/12/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/14/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/22/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/22/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/22/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/28/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/29/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/28/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/29/2021
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 07/29/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/21/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/21/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/14/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 08/04/2021
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 08/03/2021
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 09/30/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/30/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/07/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/07/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/22/2021
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 12/22/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/22/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 12/21/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/22/2021
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 10/25/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/25/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/08/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/08/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/15/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/16/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/16/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/15/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/20/2022
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 01/20/2022
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 01/19/2022
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 01/19/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/20/2022
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 01/19/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/25/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/25/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/08/2022
Type: Inspection
Result: Permit Finaled
Status: Permit Finaled
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
NEVELL GROUP INC THE

License number: 816857
Type: B
Phone: Speak with a Permit Expert
Location: BREA, CA

Permit Applicant

Principal: MICHAEL JOSEPH NEVELL

Type:

Address: 3001 ENTERPRISE, BREA

Phone:

Experience: years

Applicant: TANNER MAHR