Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

5 story new construction of 54-units of permanent supportive housing f

Inspection Activity
Date: 11/24/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 04/22/2021
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 04/23/2021
Type: METHANE-Barrier
Result: Partial Inspection
Status: Issued
Date: 04/23/2021
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 04/23/2021
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 04/22/2021
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 04/23/2021
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 04/22/2021
Type: METHANE-Rough
Result: Partial Inspection
Status: Issued
Date: 04/23/2021
Type: METHANE-Subgrade
Result: Partial Inspection
Status: Issued
Date: 04/21/2021
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 04/22/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 11/24/2021
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 08/10/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 08/10/2021
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 08/10/2021
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 04/27/2021
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 04/27/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 04/27/2021
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 04/26/2021
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 04/27/2021
Type: METHANE-Rough
Result: Partial Inspection
Status: Issued
Date: 04/26/2021
Type: Deputy Other (see comments)
Result: Partial Approval
Status: Issued
Date: 04/28/2021
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 04/27/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 08/10/2021
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 08/10/2021
Type: METHANE-Rough
Result: Approved
Status: Issued
Date: 11/24/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/24/2021
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 05/04/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 05/05/2021
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 05/05/2021
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 05/06/2021
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 05/04/2021
Type: METHANE-Rough
Result: Partial Inspection
Status: Issued
Date: 05/04/2021
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 05/04/2021
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 05/04/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 02/09/2021
Type: METHANE-Subgrade
Result: Partial Approval
Status: Issued
Date: 02/12/2021
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 02/12/2021
Type: METHANE-Barrier
Result: Partial Approval
Status: Issued
Date: 02/11/2021
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 11/24/2020
Type: Pre-Inspection
Result: No Access for Inspection
Status: Issued
Date: 11/24/2020
Type: Pre-Inspection
Result: Insp Cancelled
Status: Issued
Date: 11/23/2020
Type: Pre-Inspection
Result: Insp Cancelled
Status: Issued
Date: 08/18/2021
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 11/30/2020
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 05/10/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/25/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/23/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/03/2022
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 05/19/2021
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/05/2021
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 03/03/2021
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 03/04/2021
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 05/19/2021
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 05/19/2021
Type: METHANE-Rough
Result: Partial Inspection
Status: Issued
Date: 05/19/2021
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 05/19/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 03/09/2021
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 08/26/2021
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 08/25/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 08/27/2021
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 03/15/2021
Type: METHANE-Subgrade
Result: Partial Approval
Status: Issued
Date: 05/27/2021
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 08/26/2021
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 08/25/2021
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 04/08/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/08/2021
Type: METHANE-Barrier
Result: Partial Inspection
Status: Issued
Date: 04/08/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/07/2021
Type: Deputy Other (see comments)
Result: Partial Approval
Status: Issued
Date: 04/08/2021
Type: METHANE-Subgrade
Result: Partial Inspection
Status: Issued
Date: 04/09/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/08/2021
Type: Deputy Other (see comments)
Result: Partial Approval
Status: Issued
Date: 06/04/2021
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 08/30/2021
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 06/07/2021
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 06/10/2021
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 06/09/2021
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 06/08/2021
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 06/11/2021
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 08/31/2021
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 03/03/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/18/2021
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 06/15/2021
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 06/14/2021
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 06/18/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/15/2021
Type: METHANE-Barrier
Result: Approved
Status: Issued
Date: 12/10/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 09/10/2021
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 06/21/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 06/25/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/24/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/24/2021
Type: METHANE-Subgrade
Result: Approved
Status: Issued
Date: 06/23/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/24/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/25/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 09/09/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 12/09/2021
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 12/06/2021
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 12/06/2021
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/09/2021
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 12/09/2021
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 12/09/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 09/15/2021
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 06/09/2022
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 07/19/2021
Type: Deputy Other (see comments)
Result: Partial Approval
Status: Issued
Date: 09/22/2021
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 07/29/2021
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 07/30/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/28/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/30/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/30/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/30/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/15/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 08/03/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/17/2021
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 10/06/2021
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 10/06/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 12/21/2021
Type: Wall Anchors
Result: Partial Approval
Status: Issued
Date: 12/21/2021
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 12/21/2021
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 12/22/2021
Type: Drywall Nailing
Result: Insp Cancelled
Status: Issued
Date: 12/20/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/21/2021
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 10/21/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/29/2021
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 10/26/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Cancelled
Status: Issued
Date: 10/29/2021
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 10/28/2021
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 11/08/2021
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 11/08/2021
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/08/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 11/16/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 11/19/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 11/19/2021
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/19/2021
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 11/15/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/17/2022
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 06/14/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/28/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/24/2022
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 01/28/2022
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 01/24/2022
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 03/24/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/24/2022
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 06/14/2022
Type: T-Bar Ceiling
Result: Approved
Status: Issued
Date: 06/14/2022
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 02/09/2022
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 02/09/2022
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 02/14/2022
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 02/25/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/23/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/23/2022
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 04/06/2022
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/06/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/08/2022
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 04/12/2022
Type: Light Gage Steel Frame
Result: Insp Cancelled
Status: Issued
Date: 04/11/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/11/2022
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/18/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/21/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/26/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/02/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/02/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/13/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/13/2022
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 05/25/2022
Type: Interior/Exterior Lathing
Result: Approved
Status: Issued
Date: 07/22/2022
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 09/23/2022
Type: Special/Order Compliance
Result: Insp Cancelled
Status: Issued
Date: 10/17/2022
Type: Smoke Detectors
Result: Insp Cancelled
Status: Issued
Date: 10/17/2022
Type: SGSOV-Seismic Gas S/O Valve
Result: Insp Cancelled
Status: Issued
Date: 10/17/2022
Type: Final
Result: Insp Cancelled
Status: Issued
Date: 10/17/2022
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 10/17/2022
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 10/17/2022
Type: Reinforced Masonry Frame
Result: Insp Cancelled
Status: Issued
Date: 10/17/2022
Type: Wood Frame
Result: Insp Cancelled
Status: Issued
Date: 10/17/2022
Type: Green Building Final
Result: Insp Cancelled
Status: Issued
Date: 02/10/2023
Type: Electrical Verification
Result: OK for CofO
Status: Issued
Date: 02/13/2023
Type: Plumbing Verification
Result: OK for CofO
Status: Issued
Date: 05/18/2023
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 05/15/2023
Type: CofO Issuance
Result: CofO in Progress
Status: CofO Issued
Date: 05/18/2023
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 05/15/2023
Type: Inspection
Result: OK for CofO
Status: CofO Issued
Date: 05/18/2023
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
OLSON R D CONSTRUCTION INC

License number: 953845
Type: B
Phone: Speak with a Permit Expert
Location: IRVINE, CA

Permit Applicant

Principal: ROBERT DENNIS OLSON

Type:

Address: 1149 S HILL ST, 700, LOS ANGELES

Phone:

Experience: years

Applicant: EDWARD LAM