Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

NEW 86'-10" X 43'-1" 3 STORY TYPE VA (12 UNIT) APARTMENT BUILDING OVER

Inspection Activity
Date: 04/14/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/10/2023
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 04/14/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/14/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 02/15/2023
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 02/21/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/22/2023
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 02/23/2023
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/22/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/22/2023
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 02/22/2023
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 02/21/2023
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 04/17/2023
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 04/17/2023
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 04/17/2023
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 04/17/2023
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 04/17/2023
Type: Structural Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/17/2023
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 04/17/2023
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 04/17/2023
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 04/17/2023
Type: Wall Anchors
Result: Not Ready for Inspection
Status: Issued
Date: 04/28/2023
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 04/28/2023
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 04/28/2023
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 04/28/2023
Type: METHANE-Rough
Result: Insp Scheduled
Status: Issued
Date: 04/28/2023
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 04/28/2023
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 09/25/2023
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/05/2023
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 05/05/2023
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/01/2023
Type: Grading Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 05/05/2023
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/05/2023
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/05/2023
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 05/05/2023
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 05/02/2023
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 05/01/2023
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/06/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/06/2023
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 05/10/2023
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: Masonry Wall/Backfill
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/10/2023
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/09/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/10/2023
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: Masonry Wall/Backfill
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/10/2023
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/09/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/10/2023
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: Masonry Wall/Backfill
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/10/2023
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/09/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/10/2023
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 10/10/2023
Type: Reinforced Masonry Frame
Result: Insp Cancelled
Status: Issued
Date: 10/10/2023
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 10/10/2023
Type: Deputy Steel/Welding
Result: Insp Cancelled
Status: Issued
Date: 10/10/2023
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 10/13/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/10/2023
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 05/10/2023
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: Masonry Wall/Backfill
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/10/2023
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 05/10/2023
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/09/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/18/2023
Type: Wall Anchors
Result: Not Ready for Inspection
Status: Issued
Date: 05/18/2023
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/18/2023
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 05/18/2023
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 05/18/2023
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 05/18/2023
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/18/2023
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 05/18/2023
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/18/2023
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 10/18/2023
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 10/18/2023
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 05/24/2023
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 05/26/2023
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 05/25/2023
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 10/18/2023
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 10/18/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/18/2023
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 06/01/2023
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 06/01/2023
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 05/31/2023
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 06/01/2023
Type: Verify Sprinkler Sign Off
Result: Partial Approval
Status: Issued
Date: 06/01/2023
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 06/01/2023
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 06/01/2023
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 06/01/2023
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 10/26/2023
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 10/26/2023
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 10/26/2023
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 10/26/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/26/2023
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 11/09/2023
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 11/06/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/09/2023
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 07/14/2023
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 07/14/2023
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 07/14/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/13/2023
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 07/14/2023
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 07/14/2023
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 07/14/2023
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 07/12/2023
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 07/14/2023
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 07/14/2023
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 11/09/2023
Type: Wall Anchors
Result: Not Ready for Inspection
Status: Issued
Date: 11/06/2023
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 11/06/2023
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 11/09/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 11/06/2023
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 11/16/2023
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 11/16/2023
Type: Wall Anchors
Result: Not Ready for Inspection
Status: Issued
Date: 11/16/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 11/16/2023
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 11/16/2023
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 11/16/2023
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 08/04/2023
Type: METHANE-Barrier
Result: Partial Approval
Status: Issued
Date: 08/04/2023
Type: METHANE-Subgrade
Result: Approved
Status: Issued
Date: 08/03/2023
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 08/04/2023
Type: Deputy Methane Barrier
Result: Partial Approval
Status: Issued
Date: 08/04/2023
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 08/14/2023
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 08/14/2023
Type: METHANE-Barrier
Result: Approved
Status: Issued
Date: 11/30/2023
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 11/30/2023
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 11/30/2023
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 09/13/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/12/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/18/2023
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 09/22/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 09/21/2023
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 09/18/2023
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 09/18/2023
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 09/18/2023
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 09/22/2023
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 09/18/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/21/2023
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 09/18/2023
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 09/21/2023
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 09/21/2023
Type: METHANE-Rough
Result: Approved
Status: Issued
Date: 12/13/2023
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 12/11/2023
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 12/11/2023
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 12/13/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 12/11/2023
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 12/28/2023
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 01/12/2024
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 01/12/2024
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 01/22/2024
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 01/23/2024
Type: Insulation
Result: Cancelled
Status: Issued
Date: 01/30/2024
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 02/08/2024
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 02/22/2024
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 03/01/2024
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 02/28/2024
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
CALCON CONSTRUCTION INC

License number: 761177
Type: B
Phone: Speak with a Permit Expert
Location: LOS ANGELES, CA

Permit Applicant

Principal: IRAJ YAZDI

Type:

Address: 10635 SANTA MONICA BLVD, #190, LOS ANGELES, CA

Phone:

Experience: years

Applicant: FRANK AFARI